Permits Index
6
Permits, 24 months
8 on record
6
Roofing permits
Aug 6, 2026
Last permit issued
7
Addresses with a page

Roofing: 6 permits

From Aug 15, 2024 to Aug 6, 2026. Fewer than 5 roofing permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 2, 2024, 4 listed below. Earlier permits, 2, are on their house pages: 2024: 2.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Aug 6, 2026Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over new solid sheathing___20___Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . Forresidential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by CoolRoof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6,Section 141 2BDwelling - Single Family$8,500—26016-30000-20733
Feb 3, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over EXISTING solid sheathing Squares. Class A roof covering is required within Very HighFire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BApartment$4,300—25016-10000-02953
Jan 29, 2025Bldg-Alter/Repair: SUPPLEMENTAL PERMIT TO 25016-10000-02030 TO ADD WORK:Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over new solid sheathing __10__Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141 2BDwelling - Single Family——25016-10001-02030
Jan 23, 2025Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing 7 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$5,700—25016-10000-02030

Heating and cooling: 2 permits

From May 23, 2025 to Mar 11, 2026. Fewer than 5 heating and cooling permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Mar 11, 2026Bldg-Alter/Repair: 6 window . Window and door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council , is required for doors and windows replaced in all residential buildings, three stories or less, per Title 24, Part 6, Section 150.2 1B.2 bathroom .Bathroom remodel for residential buildings .9 door . Window and door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council , is required for doors and windows replaced in all residential buildings, three stories or less, per Title 24, Part 6, Section 150.2 1B.Kitchen remodel for residential buildingsDwelling - Single Family$21,750—26016-90000-06631
May 23, 2025Bldg-Alter/Repair: Kitchen and Bathroom remodel for residential buildings AND Window change-out (same size & type) for residential buildings. Dual glazing, labeled and certified byNational Fenestration Rating Council , is required for doors and windows replaced in all residentialbuildings, three stories or less, per Section 150.2 1B of Title 24Dwelling - Single Family$11,800—25016-30000-16984

Addresses on this street with a page

Source

Los Angeles Department of Building and Safety, via the city open-data portal, pulled nightly. As of October 2, 2026. Storm dates touching this street will appear here once the hail record is attached.