Permits Index
2
Permits, 24 months
5 on record
3
Roofing permits
Jul 24, 2026
Last permit issued
4
Addresses with a page

Roofing: 3 permits

From Jul 23, 2020 to Jul 24, 2026. Fewer than 5 roofing permits since October 3, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 3, 2024, 2 listed below. Earlier permits, 1, are on their house pages: 2020: 1.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Jul 24, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over new solid sheathing 3 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BGarage - Private$900—26016-90000-19644
Jul 24, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over new solid sheathing 24 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$7,200—26016-90000-19641

Heating and cooling: 1 permit

From Jul 12, 2022 to Jul 12, 2022. Fewer than 5 heating and cooling permits since October 3, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 3, 2024, 0 listed below. Earlier permits, 1, are on their house pages: 2022: 1.

IssuedWorkBuildingDeclared valueContractor as filedPermit

Solar: 1 permit

From Jan 14, 2020 to Jan 14, 2020. Fewer than 5 solar permits since October 3, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 3, 2024, 0 listed below. Earlier permits, 1, are on their house pages: 2020: 1.

IssuedWorkBuildingDeclared valueContractor as filedPermit

Addresses on this street with a page

Source

Los Angeles Department of Building and Safety, via the city open-data portal, pulled nightly. As of October 3, 2026. Storm dates touching this street will appear here once the hail record is attached.