E Gage Ave, Los Angeles: permits on record
4 home-service permits on record on E Gage Ave since March 17, 2020, 2 of them since October 3, 2024, at 4 addresses. Home-service permits only (roofing, heating and cooling, solar, electrical, plumbing, water heaters); other building permits are kept in the record and not shown. Permits are listed without house numbers; each address has its own page below.
Roofing: 3 permits
From Mar 17, 2020 to Mar 26, 2026. Fewer than 5 roofing permits since October 3, 2024 carry a declared value, so no range is computed; the rows are below.
Since October 3, 2024, 1 listed below. Earlier permits, 2, are on their house pages: 2021: 1 · 2020: 1.
| Issued | Work | Building | Declared value | Contractor as filed | Permit |
|---|---|---|---|---|---|
| Mar 26, 2026 | Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 12 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B | Dwelling - Single Family | $2,400 | — | 26016-90000-08158 |
Heating and cooling: 1 permit
From Mar 13, 2025 to Mar 13, 2025. Fewer than 5 heating and cooling permits since October 3, 2024 carry a declared value, so no range is computed; the rows are below.
| Issued | Work | Building | Declared value | Contractor as filed | Permit |
|---|---|---|---|---|---|
| Mar 13, 2025 | Bldg-Alter/Repair: 23 Window and 9 door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified byNational Fenestration Rating Council , is required for doors and windows replaced in all residentialbuildings, three stories or less, per Section 150.2 1B of Title 24.1 Kitchen/2 Bathroom remodel for residential buildings MECHANICAL, ELECTRICAL, AND PLUMBING INCLUDED Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing___2___Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . Forresidential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by CoolRoof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6,Section 141.0 2B.Water damage, termite damage/ dry rot repair less than 10% of replacement cost of residential buildings.Re-stucco for residential buildings | Dwelling - Single Family | $25,000 | — | 25016-10000-06985 |
Addresses on this street with a page
Source
Los Angeles Department of Building and Safety, via the city open-data portal, pulled nightly. As of October 3, 2026. Storm dates touching this street will appear here once the hail record is attached.