Permits Index

Home-service permits on record at this address

IssuedWorkTradeDeclared valueContractor as filedStatusPermit
Mar 10, 2023Bldg-Demolition: DEMOLITION OF EXISTING 1 STORY APARTMENT BUILDING, CLEAR LOT****Code Enforcement Bureau has issued an order. This parcel iseligible for issuance of a 30 day time limit permit with a work descriptionas follows. "COMPLY WITH DEPARTMENT ORDER effective date12/20/2022. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATE". Allpermits shall be for the same time period limitation. Ifadditional assistance is needed, please call Inspector EDMUND LUMat 252-3959 of CONTRACT NUISANCE ABATEMENT. CEIS CaseNumber is 975009.(Created: IMSV7 / 12-14-22)*****Heating and cooling$30,000—Finaled May 2, 202321019-10000-02629

On N Alfred St

17 permits on record on N Alfred St.

TradePermitsSince Oct 6, 2024Median declaredRangeLast
Roofing101—under 5Sep 11, 2025
Heating and cooling51—under 5Jun 18, 2025
Plumbing20—under 5Dec 1, 2020

Roof replacement cost in Los Angeles

Across 20,953 one- and two-family reroof permits since October 6, 2024, most declared values run from $2,000 to $12,900 (the middle 80%); the median is $5,200 and half fall between $3,600 and $7,800. The lowest on record is $19 and the highest $570,000. This address is in that cohort. Every permit behind that range.

Furnace, heat pump or air conditioner replacement cost in Los Angeles

Across 5,341 one- and two-family heating and cooling permits since October 6, 2024, most declared values run from $501 to $39,220 (the middle 80%); the median is $4,251 and half fall between $1,250 and $15,000. The lowest on record is $1 and the highest $1,800,000. This address is in that cohort. Every permit behind that range.

Source

Los Angeles Department of Building and Safety, via the city open-data portal, pulled nightly; the assessor roll for the property fields. As of October 6, 2026. Owner names are not shown on any page.