N Avenue 54, Los Angeles: permits on record
28 home-service permits on record on N Avenue 54 since February 27, 2020, 16 of them since October 6, 2024, at 26 addresses. Home-service permits only (roofing, heating and cooling, solar, electrical, plumbing, water heaters); other building permits are kept in the record and not shown. Permits are listed without house numbers; each address has its own page below.
Roofing: 22 permits
From Feb 27, 2020 to Jul 12, 2026. Across 13 roofing permits since October 6, 2024, most declared values run from $3,440 to $47,793 (the middle 80%); the median is $6,300 and half fall between $4,000 and $16,240. The lowest on record is $2,800 and the highest $56,320.
Since October 6, 2024, 13 listed below. Earlier permits, 9, are on their house pages: 2024: 1 · 2023: 3 · 2022: 1 · 2021: 3 · 2020: 1.
| Issued | Work | Building | Declared value | Contractor as filed | Permit |
|---|---|---|---|---|---|
| Jul 12, 2026 | Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 20 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B | Dwelling - Single Family | $4,000 | — | 26016-90000-18316 |
| Jun 9, 2026 | Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing___47___Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone .For residential roof replacement>50% of the total roof area, apply Cool Roof Product labeled and certified byCool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part6, Section 141 2B | Apartment | $56,320 | — | 26016-10000-14899 |
| Apr 26, 2026 | Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 20 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B.New Stucco w/wire lath over siding to remain. Area = 4800 sqft.2 bathroom .Bathroom remodel for residential buildings .Kitchen remodel for residential buildings | Dwelling - Single Family | $55,400 | — | 26016-90000-11007 |
| Apr 15, 2026 | Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over new solid sheathing___18___Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141 2B | Dwelling - Single Family | $6,300 | — | 26016-10000-08892 |
| Apr 5, 2026 | Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing__22____Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone .For residential roof replacement>50% of the total roof area, apply Cool Roof Product labeled and certified byCool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part6, Section 141 2B | Dwelling - Single Family | $16,240 | — | 26016-10000-08300 |
| Mar 20, 2026 | Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 17 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B | Dwelling - Single Family | $3,400 | — | 26016-90000-07555 |
| Mar 11, 2026 | Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft.over existing solid sheathing _11__Squares. Class A roof covering is required withinVery High Fire Hazard Severity Zone . For residential roof replacement >50% of the total roof area, apply Cool Roof Product labeled and certified by Cool RoofRating Council . Cool Roof may be required for non-residential buildings perTitle 24, Part 6, Section 141.0 2B | Dwelling - Single Family | $6,000 | — | 26016-30000-06242 |
| Jan 12, 2026 | Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 30 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B | Dwelling - Single Family | $6,000 | — | 26016-90000-00903 |
| Nov 4, 2025 | Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roofing Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B | Dwelling - Single Family | $17,363 | — | 25016-20000-32623 |
| Jul 30, 2025 | Bldg-Alter/Repair: Kitchen and Bathroom remodel for residential buildings INCLUDING ELECTRICAL AND PLUMBING & Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing___24___Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement>50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141 2B | Dwelling - Single Family | $15,500 | — | 25016-30000-23309 |
| Jul 29, 2025 | Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over new solid sheathing 12 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B | Dwelling - Single Family | $3,600 | — | 25016-90000-23270 |
| May 23, 2025 | Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing___6___Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone .For residential roof replacement>50% of the total roof area, apply Cool Roof Product labeled and certified byCool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part6, Section 141 2B | Dwelling - Single Family | $2,800 | — | 25016-10000-13165 |
| Apr 9, 2025 | Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. overexisting solid sheathing 30 Squares. Class A roof covering is required within Very HighFireHazard Severity Zone . For residential roof replacement > 50% of the total roof area,apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roofmay be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B | Dwelling - Single Family | $7,500 | — | 25016-20000-07976 |
Heating and cooling: 4 permits
From Sep 22, 2022 to Sep 3, 2026. Fewer than 5 heating and cooling permits since October 6, 2024 carry a declared value, so no range is computed; the rows are below.
Since October 6, 2024, 3 listed below. Earlier permits, 1, are on their house pages: 2022: 1.
| Issued | Work | Building | Declared value | Contractor as filed | Permit |
|---|---|---|---|---|---|
| Sep 3, 2026 | Bldg-Alter/Repair: Window and door change-out (same size & type), Kitchen and bathroom remodel, Replace drywall and Install insulation in walls TO APARTMENT UNIT #C | Apartment | $42,000 | — | 26016-10000-06578 |
| Apr 26, 2026 | Bldg-Alter/Repair: 13 window . Window and door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council , is required for doors and windows replaced in all residential buildings, three stories or less, per Title 24, Part 6, Section 150.2 1B.Replacement of damaged framing members for single family dwellings and duplex | Dwelling - Single Family | $5,450 | — | 26016-90000-11008 |
| Feb 16, 2026 | Bldg-Alter/Repair: 1 window . Window and door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council , is required for doors and windows replaced in all residential buildings, three stories or less, per Title 24, Part 6, Section 150.2 1B | Dwelling - Single Family | $501 | — | 26016-90000-04211 |
Plumbing: 1 permit
From May 9, 2023 to May 9, 2023. Fewer than 5 plumbing permits since October 6, 2024 carry a declared value, so no range is computed; the rows are below.
Since October 6, 2024, 0 listed below. Earlier permits, 1, are on their house pages: 2023: 1.
| Issued | Work | Building | Declared value | Contractor as filed | Permit |
|---|
Electrical: 1 permit
From Jul 22, 2022 to Jul 22, 2022. Fewer than 5 electrical permits since October 6, 2024 carry a declared value, so no range is computed; the rows are below.
Since October 6, 2024, 0 listed below. Earlier permits, 1, are on their house pages: 2022: 1.
| Issued | Work | Building | Declared value | Contractor as filed | Permit |
|---|
Addresses on this street with a page
Source
Los Angeles Department of Building and Safety, via the city open-data portal, pulled nightly. As of October 6, 2026. Storm dates touching this street will appear here once the hail record is attached.