Permits Index

Home-service permits on record at this address

IssuedWorkTradeDeclared valueContractor as filedStatusPermit
Mar 4, 2025Bldg-Alter/Repair: Supplemental permit to 19010-10000-02606 to revise the open space analysis; change the parking garage design from closed to open/natural ventilation; provide construction details for Type IA podium, Type IIIA floor/ roof ceiling assemblies; revise kitchen layouts; Add shear walls and a mechanical room on roof topRoofing$25,000—Finaled Aug 18, 202619010-10002-02606
Mar 18, 2024Bldg-Demolition: DEMO THE 2-STORY APARTMENT BUILDING. SEWER CAP PER SEPERATE PERMIT REQUIREDPlumbing$24,000—Finaled May 22, 202421019-20000-00870

On N Bakman Ave

53 permits on record on N Bakman Ave.

TradePermitsSince Oct 7, 2024Median declaredRangeLast
Roofing3012$5,600$3,280–$24,400Sep 30, 2026
Heating and cooling142—under 5May 22, 2025
Plumbing60—under 5Mar 18, 2024
Solar21—under 5Mar 19, 2026
Electrical10—under 5Apr 4, 2022

Roof replacement cost in Los Angeles

Across 20,947 one- and two-family reroof permits since October 7, 2024, most declared values run from $2,000 to $12,900 (the middle 80%); the median is $5,200 and half fall between $3,600 and $7,800. The lowest on record is $19 and the highest $570,000. Every permit behind that range.

Furnace, heat pump or air conditioner replacement cost in Los Angeles

Across 5,341 one- and two-family heating and cooling permits since October 7, 2024, most declared values run from $501 to $39,220 (the middle 80%); the median is $4,251 and half fall between $1,250 and $15,000. The lowest on record is $1 and the highest $1,800,000. Every permit behind that range.

Source

Los Angeles Department of Building and Safety, via the city open-data portal, pulled nightly; the assessor roll for the property fields. As of October 7, 2026. Owner names are not shown on any page.