29 home-service permits on record on N Bay View Ave since March 13, 2020, 9 of them since October 4, 2024, at 24 addresses. Home-service permits only (roofing, heating and cooling, solar, electrical, plumbing, water heaters); other building permits are kept in the record and not shown. Permits are listed without house numbers; each address has its own page below.
Roofing: 27 permits
From Mar 13, 2020 to Sep 14, 2026. Across 8 roofing permits since October 4, 2024, most declared values run from $4,040 to $8,660 (the middle 80%); the median is $6,400 and half fall between $5,450 and $7,250. The lowest on record is $1,800 and the highest $10,200.
Since October 4, 2024, 8 listed below. Earlier permits, 19, are on their house pages: 2024: 8 · 2023: 3 · 2022: 4 · 2021: 1 · 2020: 3.
| Issued | Work | Building | Declared value | Contractor as filed | Permit |
|---|---|---|---|---|---|
| Sep 14, 2026 | Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 25 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B | Apartment | $5,000 | — | 26016-90000-24737 |
| Aug 25, 2026 | Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing__30____Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone .For residential roof replacement>50% of the total roof area, apply Cool Roof Product labeled and certified byCool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part6, Section 141 2B | Dwelling - Single Family | $6,000 | — | 26016-40000-22599 |
| Aug 20, 2026 | Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing_20_Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Productlabeled and certified by Cool Roof Rating Council . Cool Roof may be required fornon-residential buildings per Title 24, Part 6, Section 149 | Dwelling - Single Family | $8,000 | — | 26016-40000-22194 |
| Aug 11, 2026 | Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 34 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B | Dwelling - Single Family | $6,800 | — | 26016-90000-21245 |
| May 13, 2026 | Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over new solid sheathing 34 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B | Garage - Private | $10,200 | — | 26016-90000-12689 |
| Mar 3, 2026 | Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 28 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B | Dwelling - Single Family | $5,600 | — | 26016-90000-05662 |
| Oct 22, 2025 | Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 9 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B | Apartment | $1,800 | — | 25016-90000-31564 |
| Dec 9, 2024 | Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 35 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B | Apartment | $7,000 | — | 24016-90000-38896 |
Heating and cooling: 1 permit
From Mar 28, 2026 to Mar 28, 2026. Fewer than 5 heating and cooling permits since October 4, 2024 carry a declared value, so no range is computed; the rows are below.
| Issued | Work | Building | Declared value | Contractor as filed | Permit |
|---|---|---|---|---|---|
| Mar 28, 2026 | Bldg-Alter/Repair: 5 window . Window and door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council , is required for doors and windows replaced in all residential buildings, three stories or less, per Title 24, Part 6, Section 150.2 1B | Dwelling - Single Family | $1,250 | — | 26016-90000-08314 |
Plumbing: 1 permit
From Aug 6, 2024 to Aug 6, 2024. Fewer than 5 plumbing permits since October 4, 2024 carry a declared value, so no range is computed; the rows are below.
Since October 4, 2024, 0 listed below. Earlier permits, 1, are on their house pages: 2024: 1.
| Issued | Work | Building | Declared value | Contractor as filed | Permit |
|---|