N El Hito Cir, Los Angeles: permits on record
10 home-service permits on record on N El Hito Cir since October 30, 2020, 6 of them since October 6, 2024, at 6 addresses. Home-service permits only (roofing, heating and cooling, solar, electrical, plumbing, water heaters); other building permits are kept in the record and not shown. Permits are listed without house numbers; each address has its own page below.
Roofing: 6 permits
From Oct 30, 2020 to Apr 3, 2026. Fewer than 5 roofing permits since October 6, 2024 carry a declared value, so no range is computed; the rows are below.
Since October 6, 2024, 3 listed below. Earlier permits, 3, are on their house pages: 2023: 1 · 2022: 1 · 2020: 1.
| Issued | Work | Building | Declared value | Contractor as filed | Permit |
|---|---|---|---|---|---|
| Apr 3, 2026 | Bldg-Alter/Repair: SUPPLEMENTAL PERMIT TO CHANGE WORK DESCRIPTION TO: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over new solid sheathing Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roofing Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B .Replacement of damaged framing members for single family dwellings and duplex | Dwelling - Single Family | $17,995 | — | 26016-20001-07028 |
| Mar 16, 2026 | Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 39 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B.Replacement of damaged framing members for single family dwellings and duplex | Dwelling - Single Family | $10,300 | — | 26016-90000-07028 |
| Sep 15, 2025 | Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 41 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B | Dwelling - Single Family | $8,200 | — | 25016-90000-27758 |
Heating and cooling: 4 permits
From Dec 3, 2021 to Nov 20, 2025. Fewer than 5 heating and cooling permits since October 6, 2024 carry a declared value, so no range is computed; the rows are below.
Since October 6, 2024, 3 listed below. Earlier permits, 1, are on their house pages: 2021: 1.
| Issued | Work | Building | Declared value | Contractor as filed | Permit |
|---|---|---|---|---|---|
| Nov 20, 2025 | Bldg-Alter/Repair: 5 window . Window and door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council , is required for doors and windows replaced in all residential buildings, three stories or less, per Title 24, Part 6, Section 150.2 1B | Dwelling - Single Family | $1,250 | — | 25016-90000-34362 |
| Sep 22, 2025 | Bldg-Alter/Repair: EPLAN:STRUCTURAL REMODEL OF EXISTING SINGLE FAMILY DWELLING FOR KITCHEN REMODEL- DOOR & WINDOW CHANGEOUT.See Comment | Dwelling - Single Family | $30,000 | — | 25016-10000-21849 |
| Jul 29, 2025 | Bldg-Alter/Repair: 8 window . Window and door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council , is required for doors and windows replaced in all residential buildings, three stories or less, per Title 24, Part 6, Section 150.2 1B | Dwelling - Single Family | $2,000 | — | 25016-90000-23221 |
Addresses on this street with a page
Source
Los Angeles Department of Building and Safety, via the city open-data portal, pulled nightly. As of October 6, 2026. Storm dates touching this street will appear here once the hail record is attached.