Permits Index
3
Permits, 24 months
10 on record
5
Roofing permits
Oct 6, 2025
Last permit issued
8
Addresses with a page

Roofing: 5 permits

From Apr 21, 2021 to Oct 6, 2025. Fewer than 5 roofing permits since October 4, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 4, 2024, 3 listed below. Earlier permits, 2, are on their house pages: 2022: 1 · 2021: 1.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Oct 6, 2025Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing___40___Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone .For residential roof replacement>50% of the total roof area, apply Cool Roof Product labeled and certified byCool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part6, Section 141 2BOffice$18,000—25016-10000-29775
Jul 31, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 180 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BCommercial$36,000—25016-90000-23397
Jan 28, 2025Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing27______Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone .For residential roof replacement>50% of the total roof area, apply Cool Roof Product labeled and certified byCool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141 2BMiscellaneous Bldg/Structure$63,000—25016-40000-01195

Plumbing: 2 permits

From Nov 10, 2021 to Nov 10, 2021. Fewer than 5 plumbing permits since October 4, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 4, 2024, 0 listed below. Earlier permits, 2, are on their house pages: 2021: 2.

IssuedWorkBuildingDeclared valueContractor as filedPermit

Electrical: 1 permit

From Dec 13, 2022 to Dec 13, 2022. Fewer than 5 electrical permits since October 4, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 4, 2024, 0 listed below. Earlier permits, 1, are on their house pages: 2022: 1.

IssuedWorkBuildingDeclared valueContractor as filedPermit

Heating and cooling: 1 permit

From Oct 12, 2020 to Oct 12, 2020. Fewer than 5 heating and cooling permits since October 4, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 4, 2024, 0 listed below. Earlier permits, 1, are on their house pages: 2020: 1.

IssuedWorkBuildingDeclared valueContractor as filedPermit

Solar: 1 permit

From Aug 25, 2020 to Aug 25, 2020. Fewer than 5 solar permits since October 4, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 4, 2024, 0 listed below. Earlier permits, 1, are on their house pages: 2020: 1.

IssuedWorkBuildingDeclared valueContractor as filedPermit

Addresses on this street with a page

Source

Los Angeles Department of Building and Safety, via the city open-data portal, pulled nightly. As of October 4, 2026. Storm dates touching this street will appear here once the hail record is attached.