Permits Index
3
Permits, 24 months
4 on record
4
Roofing permits
Apr 14, 2025
Last permit issued
4
Addresses with a page

Roofing: 4 permits

From Oct 10, 2023 to Apr 14, 2025. Fewer than 5 roofing permits since October 3, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 3, 2024, 3 listed below. Earlier permits, 1, are on their house pages: 2023: 1.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Apr 14, 2025Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing_18_Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone .For residential roof replacement>50% of the total roof area, apply Cool Roof Product labeled and certified byCool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part6, Section 141 2BDwelling - Single Family$10,500โ€”25016-30000-11220
Nov 14, 2024Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over EXISTING solid sheathing __19__Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$6,650โ€”24016-10000-35620
Oct 8, 2024Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roofing Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$11,000โ€”24016-20000-30373

Addresses on this street with a page

Source

Los Angeles Department of Building and Safety, via the city open-data portal, pulled nightly. As of October 3, 2026. Storm dates touching this street will appear here once the hail record is attached.