Permits Index
3
Permits, 24 months
4 on record
4
Roofing permits
May 19, 2026
Last permit issued
4
Addresses with a page

Roofing: 4 permits

From Feb 13, 2020 to May 19, 2026. Fewer than 5 roofing permits since October 4, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 4, 2024, 3 listed below. Earlier permits, 1, are on their house pages: 2020: 1.

IssuedWorkBuildingDeclared valueContractor as filedPermit
May 19, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solidsheathing ___75___Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeledand certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildingsper Title 24, Part 6, Section 141.0 2BApartment$60,000โ€”26016-20000-12693
Apr 15, 2025Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing_47__Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone .For residential roof replacement>50% of the total roof area, apply Cool Roof Product labeled and certified byCool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part6, Section 141 2BDwelling - Single Family$42,000โ€”25016-30000-11737
Oct 21, 2024Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roofing Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$6,150โ€”24016-20000-33622

Addresses on this street with a page

Source

Los Angeles Department of Building and Safety, via the city open-data portal, pulled nightly. As of October 4, 2026. Storm dates touching this street will appear here once the hail record is attached.