N Tujunga Ave, Los Angeles: permits on record
83 home-service permits on record on N Tujunga Ave since January 7, 2020, 20 of them since October 2, 2024, at 64 addresses. Home-service permits only (roofing, heating and cooling, solar, electrical, plumbing, water heaters); other building permits are kept in the record and not shown. Permits are listed without house numbers; each address has its own page below.
Roofing: 62 permits
From May 26, 2020 to Sep 25, 2026. Across 19 roofing permits since October 2, 2024, most declared values run from $3,240 to $39,240 (the middle 80%); the median is $8,850 and half fall between $4,000 and $24,450. The lowest on record is $501 and the highest $82,000.
Since October 2, 2024, 19 listed below. Earlier permits, 43, are on their house pages: 2024: 6 · 2023: 13 · 2022: 10 · 2021: 5 · 2020: 9.
| Issued | Work | Building | Declared value | Contractor as filed | Permit |
|---|---|---|---|---|---|
| Sep 25, 2026 | Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 25 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B | Apartment | $5,000 | — | 26016-90000-26278 |
| Sep 17, 2026 | Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 20 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B | Dwelling - Single Family | $4,000 | — | 26016-90000-25383 |
| Sep 15, 2026 | Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roofing Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B | Apartment | $9,720 | — | 26016-20000-24990 |
| Aug 24, 2026 | Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 9 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B | Garage - Private | $1,800 | — | 26016-90000-22514 |
| Aug 21, 2026 | Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 18 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B | Dwelling - Single Family | $3,600 | — | 26016-90000-22389 |
| Jul 31, 2026 | Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing___24___Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone .For residential roof replacement>50% of the total roof area, apply Cool Roof Product labeled and certified byCool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part6, Section 141 2B.Detached garage included | Dwelling - Single Family | $17,000 | — | 26016-10000-20172 |
| Jun 8, 2026 | Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 305 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B | Warehouse | $61,000 | — | 26016-90000-15113 |
| Dec 9, 2025 | Bldg-Alter/Repair: ADJUST CARWASH HEIGHT ON ELEVATION & STRUCTURALINVENTORYUPDATE SQFT & HEIGHT ON PERMIT CARDUPDATE ROOFING DETAILUPDATE STRUCTURAL FRAMING PLAN S-3 & FRAMING DETAILSS0.51 | Miscellaneous Bldg/Structure | $501 | — | 25016-20002-01957 |
| Nov 3, 2025 | Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing_44_Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone .For residential roof replacement>50% of the total roof area, apply Cool Roof Product labeled and certified byCool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part6, Section 141 2B | Apartment | $20,900 | — | 25016-10000-32834 |
| Sep 2, 2025 | Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing _30_ squares. For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roofing Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B | Apartment | $28,000 | — | 25016-20000-26450 |
| Aug 5, 2025 | Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing___25___Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone .For residential roof replacement>50% of the total roof area, apply Cool Roof Product labeled and certified byCool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part6, Section 141 2B | Church | $12,500 | — | 25016-10000-23867 |
| May 14, 2025 | Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roofing Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B | Apartment | $28,000 | — | 25016-20000-15835 |
| Apr 24, 2025 | Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over EXISTING solid sheathing _100_____Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 149 | Miscellaneous Bldg/Structure | $82,000 | — | 25016-40000-13077 |
| Apr 7, 2025 | Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 20 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B | Apartment | $4,000 | — | 25016-90000-10496 |
| Mar 31, 2025 | Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 20 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B | Dwelling - Single Family | $4,000 | — | 25016-90000-09611 |
| Feb 4, 2025 | Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roofing Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B | Apartment | $33,800 | — | 25016-20000-03001 |
| Jan 22, 2025 | Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing___22___Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement>50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141 2B | Apartment | $8,850 | — | 25016-30000-01824 |
| Jan 17, 2025 | Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over new solid sheathing 23 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B | Apartment | $6,900 | — | 25016-90000-01467 |
| Oct 18, 2024 | Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 18 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B | Dwelling - Single Family | $3,600 | — | 24016-90000-33441 |
Heating and cooling: 13 permits
From Jan 24, 2020 to Jun 26, 2025. Fewer than 5 heating and cooling permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.
Since October 2, 2024, 1 listed below. Earlier permits, 12, are on their house pages: 2022: 4 · 2021: 2 · 2020: 6.
| Issued | Work | Building | Declared value | Contractor as filed | Permit |
|---|---|---|---|---|---|
| Jun 26, 2025 | Bldg-Alter/Repair: 5 window . Window and door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council , is required for doors and windows replaced in all residential buildings, three stories or less, per Title 24, Part 6, Section 150.2 1B | Dwelling - Single Family | $1,250 | — | 25016-90000-20263 |
Plumbing: 5 permits
From Jan 7, 2020 to May 30, 2023. Fewer than 5 plumbing permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.
Since October 2, 2024, 0 listed below. Earlier permits, 5, are on their house pages: 2023: 3 · 2022: 1 · 2020: 1.
| Issued | Work | Building | Declared value | Contractor as filed | Permit |
|---|
Solar: 2 permits
From Jul 16, 2021 to Jun 9, 2023. Fewer than 5 solar permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.
Since October 2, 2024, 0 listed below. Earlier permits, 2, are on their house pages: 2023: 1 · 2021: 1.
| Issued | Work | Building | Declared value | Contractor as filed | Permit |
|---|
Electrical: 1 permit
From Apr 5, 2024 to Apr 5, 2024. Fewer than 5 electrical permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.
Since October 2, 2024, 0 listed below. Earlier permits, 1, are on their house pages: 2024: 1.
| Issued | Work | Building | Declared value | Contractor as filed | Permit |
|---|