Permits Index
1
Permits, 24 months
4 on record
2
Roofing permits
May 21, 2025
Last permit issued
3
Addresses with a page

Roofing: 2 permits

From Aug 23, 2022 to Jun 6, 2023. Fewer than 5 roofing permits since October 7, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 7, 2024, 0 listed below. Earlier permits, 2, are on their house pages: 2023: 1 · 2022: 1.

IssuedWorkBuildingDeclared valueContractor as filedPermit

Heating and cooling: 1 permit

From May 21, 2025 to May 21, 2025. Fewer than 5 heating and cooling permits since October 7, 2024 carry a declared value, so no range is computed; the rows are below.

IssuedWorkBuildingDeclared valueContractor as filedPermit
May 21, 2025Bldg-Alter/Repair: 3 window . Window and door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council , is required for doors and windows replaced in all residential buildings, three stories or less, per Title 24, Part 6, Section 150.2 1B.2 bathroom .Bathroom remodel for residential buildings .1 door . Window and door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council , is required for doors and windows replaced in all residential buildings, three stories or less, per Title 24, Part 6, Section 150.2 1BDwelling - Single Family$26,751—25016-90000-16745

Electrical: 1 permit

From Jun 1, 2021 to Jun 1, 2021. Fewer than 5 electrical permits since October 7, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 7, 2024, 0 listed below. Earlier permits, 1, are on their house pages: 2021: 1.

IssuedWorkBuildingDeclared valueContractor as filedPermit

Addresses on this street with a page

Source

Los Angeles Department of Building and Safety, via the city open-data portal, pulled nightly. As of October 7, 2026. Storm dates touching this street will appear here once the hail record is attached.