Permits Index
3
Permits, 24 months
11 on record
9
Roofing permits
Jul 2, 2026
Last permit issued
11
Addresses with a page

Roofing: 9 permits

From Jan 23, 2020 to Jul 2, 2026. Fewer than 5 roofing permits since October 6, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 6, 2024, 2 listed below. Earlier permits, 7, are on their house pages: 2024: 2 · 2023: 2 · 2022: 1 · 2020: 2.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Jul 2, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 37 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$7,400—26016-90000-17578
Apr 1, 2025Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing _40 Squares. For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roofing Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$35,000—25016-20000-09770

Heating and cooling: 1 permit

From Aug 28, 2025 to Aug 28, 2025. Fewer than 5 heating and cooling permits since October 6, 2024 carry a declared value, so no range is computed; the rows are below.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Aug 28, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 40 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B.10 window . Window and door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council , is required for doors and windows replaced in all residential buildings, three stories or less, per Title 24, Part 6, Section 150.2 1B.2 bathroom .Bathroom remodel for residential buildings .Kitchen remodel for residential buildingsDwelling - Single Family$18,500—25016-90000-26147

Solar: 1 permit

From Oct 5, 2023 to Oct 5, 2023. Fewer than 5 solar permits since October 6, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 6, 2024, 0 listed below. Earlier permits, 1, are on their house pages: 2023: 1.

IssuedWorkBuildingDeclared valueContractor as filedPermit

Addresses on this street with a page

Source

Los Angeles Department of Building and Safety, via the city open-data portal, pulled nightly. As of October 6, 2026. Storm dates touching this street will appear here once the hail record is attached.