Permits Index
3
Permits, 24 months
5 on record
5
Roofing permits
Feb 24, 2025
Last permit issued
5
Addresses with a page

Roofing: 5 permits

From Jul 19, 2023 to Feb 24, 2025. Fewer than 5 roofing permits since October 6, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 6, 2024, 3 listed below. Earlier permits, 2, are on their house pages: 2024: 1 · 2023: 1.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Feb 24, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 14 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDuplex$5,000—25016-20000-05051
Feb 18, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 25 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDuplex$5,000—25016-90000-04559
Nov 20, 2024Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 17 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$3,400—24016-90000-37044

Addresses on this street with a page

Source

Los Angeles Department of Building and Safety, via the city open-data portal, pulled nightly. As of October 6, 2026. Storm dates touching this street will appear here once the hail record is attached.