Permits Index
6
Permits, 24 months
17 on record
10
Roofing permits
Mar 4, 2026
Last permit issued
14
Addresses with a page

Roofing: 10 permits

From Jan 2, 2020 to Feb 11, 2026. Fewer than 5 roofing permits since October 6, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 6, 2024, 3 listed below. Earlier permits, 7, are on their house pages: 2023: 3 · 2022: 1 · 2021: 1 · 2020: 2.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Feb 11, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing _480_Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings perTitle 24, Part 6, Section 141.0 2B. Remove existing roof tiles, apply new underlayment and reset roof tilesHotel$40,000—26016-30000-03895
Jun 25, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roofing Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BAirport Building$55,000—25016-20000-20092
Jun 10, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 100 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BAirport Building$20,000—25016-90000-18588

Plumbing: 2 permits

From Jul 10, 2024 to Mar 4, 2026. Fewer than 5 plumbing permits since October 6, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 6, 2024, 1 listed below. Earlier permits, 1, are on their house pages: 2024: 1.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Mar 4, 2026Bldg-Alter/Repair: Kitchen remodel for residential buildings . MECHANICAL, ELECTRICAL, PLUMBING INCLUDEDDwelling - Single Family$15,000—26016-10000-05837

Electrical: 2 permits

From Jan 6, 2025 to Feb 26, 2026. Fewer than 5 electrical permits since October 6, 2024 carry a declared value, so no range is computed; the rows are below.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Feb 26, 2026Nonbldg-Alter/Repair: **LAX**Installation of new electric bus charging stations and level 2 EV chargers at existing parking lot for airport employee use only. Scope of work includes pavement repairs, construction of raised charging pads, installation of new bollards, charging equipment, signage and pavement stripingOpen Parking Lot$3,750,000—24020-10000-01052
Jan 6, 2025Bldg-Alter/Repair: **LAX APM Aux Curb**Modifications to Existing Economy Lot Parking Structure include removing existing curb, removing existing striping, removing existing EV charging stations, relocating prefabricated metal gate from existing location to new location, revising signage inside of parking structureAirport Building$1,000,000—23016-10000-39375

Solar: 2 permits

From Jul 18, 2023 to Apr 17, 2024. Fewer than 5 solar permits since October 6, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 6, 2024, 0 listed below. Earlier permits, 2, are on their house pages: 2024: 1 · 2023: 1.

IssuedWorkBuildingDeclared valueContractor as filedPermit

Heating and cooling: 1 permit

From Nov 3, 2021 to Nov 3, 2021. Fewer than 5 heating and cooling permits since October 6, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 6, 2024, 0 listed below. Earlier permits, 1, are on their house pages: 2021: 1.

IssuedWorkBuildingDeclared valueContractor as filedPermit

Addresses on this street with a page

Source

Los Angeles Department of Building and Safety, via the city open-data portal, pulled nightly. As of October 6, 2026. Storm dates touching this street will appear here once the hail record is attached.