S Breed St, Los Angeles: permits on record
7 home-service permits on record on S Breed St since April 26, 2022, 6 of them since October 2, 2024, at 4 addresses. Home-service permits only (roofing, heating and cooling, solar, electrical, plumbing, water heaters); other building permits are kept in the record and not shown. Permits are listed without house numbers; each address has its own page below.
Roofing: 5 permits
From Apr 26, 2022 to Aug 13, 2026. Fewer than 5 roofing permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.
Since October 2, 2024, 4 listed below. Earlier permits, 1, are on their house pages: 2022: 1.
| Issued | Work | Building | Declared value | Contractor as filed | Permit |
|---|---|---|---|---|---|
| Aug 13, 2026 | Bldg-Alter/Repair: SUPPLEMENTAL PERMIT TO #26016-20000-20372 TO REVISE WORK DESCRIPTION TO READ:Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over NEW solid sheathing __19____Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B | Dwelling - Single Family | — | — | 26016-20001-20372 |
| Aug 3, 2026 | Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing __19____Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B | Dwelling - Single Family | $6,650 | — | 26016-20000-20372 |
| Jul 13, 2026 | Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roofing Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B | Dwelling - Single Family | $15,000 | — | 26016-20000-18410 |
| May 12, 2025 | Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over EXISTING solid sheathing __12__Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B | Dwelling - Single Family | $3,600 | — | 25016-10000-15447 |
Heating and cooling: 2 permits
From Jun 2, 2025 to Aug 25, 2025. Fewer than 5 heating and cooling permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.
| Issued | Work | Building | Declared value | Contractor as filed | Permit |
|---|---|---|---|---|---|
| Aug 25, 2025 | Bldg-Alter/Repair: 21 Window change-out (same size & type) for residential buildings. Dual glazing, labeled and certified byNational Fenestration Rating Council , is required for doors and windows replaced in all residentialbuildings, three stories or less, per Section 150.2 1B of Title 24 | Dwelling - Single Family | $9,450 | — | 25016-10000-25658 |
| Jun 2, 2025 | Bldg-Alter/Repair: Window change-out (same size & type) for residential buildings . Dual glazing, labeled and certified by National Fenestration Rating Council , is required for doors and windows replaced in all residential buildings, three stories or less, per Section 150.2 1B of Title 24 | Dwelling - Single Family | $501 | — | 25016-10000-17702 |
Addresses on this street with a page
Source
Los Angeles Department of Building and Safety, via the city open-data portal, pulled nightly. As of October 2, 2026. Storm dates touching this street will appear here once the hail record is attached.