Permits Index
4
Permits, 24 months
15 on record
12
Roofing permits
Jun 22, 2026
Last permit issued
14
Addresses with a page

Roofing: 12 permits

From Jun 26, 2020 to Jun 22, 2026. Fewer than 5 roofing permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 2, 2024, 4 listed below. Earlier permits, 8, are on their house pages: 2023: 1 · 2022: 2 · 2021: 3 · 2020: 2.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Jun 22, 2026Bldg-Alter/Repair: Supplemental permit to permit #26016-70000-15204 to: Correct the Work Description to read "Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over new solid sheathing __11__Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B."Dwelling - Single Family——26016-10001-15204
Jun 15, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing __11__Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$3,800—26016-70000-15204
Mar 12, 2026Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over EXISTING solid sheathing __30____Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 149Apartment$17,000—26016-40000-05649
Jan 16, 2025Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing _30___Squares. Class A roof covering is required within a Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BApartment$14,800—24016-30000-39271

Heating and cooling: 2 permits

From Nov 25, 2020 to Sep 21, 2023. Fewer than 5 heating and cooling permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 2, 2024, 0 listed below. Earlier permits, 2, are on their house pages: 2023: 1 · 2020: 1.

IssuedWorkBuildingDeclared valueContractor as filedPermit

Plumbing: 1 permit

From Nov 9, 2021 to Nov 9, 2021. Fewer than 5 plumbing permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 2, 2024, 0 listed below. Earlier permits, 1, are on their house pages: 2021: 1.

IssuedWorkBuildingDeclared valueContractor as filedPermit

Addresses on this street with a page

Source

Los Angeles Department of Building and Safety, via the city open-data portal, pulled nightly. As of October 2, 2026. Storm dates touching this street will appear here once the hail record is attached.