Permits Index
3
Permits, 24 months
3 on record
3
Roofing permits
Feb 3, 2026
Last permit issued
2
Addresses with a page

Roofing: 3 permits

From Dec 18, 2024 to Feb 3, 2026. Fewer than 5 roofing permits since October 3, 2024 carry a declared value, so no range is computed; the rows are below.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Feb 3, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 23 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$4,600โ€”26016-90000-03086
Jan 7, 2025Bldg-Alter/Repair: Supplemental to permit 24016-90000-39887 Customer to revise work description TO Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over NEW SOLID sheathing _20_Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 149Dwelling - Single Family$1,500โ€”24016-40001-39887
Dec 18, 2024Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 19 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$3,800โ€”24016-90000-39887

Addresses on this street with a page

Source

Los Angeles Department of Building and Safety, via the city open-data portal, pulled nightly. As of October 3, 2026. Storm dates touching this street will appear here once the hail record is attached.