S Leland St, Los Angeles: permits on record
20 home-service permits on record on S Leland St since September 29, 2020, 6 of them since October 4, 2024, at 19 addresses. Home-service permits only (roofing, heating and cooling, solar, electrical, plumbing, water heaters); other building permits are kept in the record and not shown. Permits are listed without house numbers; each address has its own page below.
Roofing: 17 permits
From Sep 29, 2020 to Oct 14, 2025. Fewer than 5 roofing permits since October 4, 2024 carry a declared value, so no range is computed; the rows are below.
Since October 4, 2024, 5 listed below. Earlier permits, 12, are on their house pages: 2024: 5 · 2023: 2 · 2022: 1 · 2021: 3 · 2020: 1.
| Issued | Work | Building | Declared value | Contractor as filed | Permit |
|---|---|---|---|---|---|
| Oct 14, 2025 | Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 29 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B | Dwelling - Single Family | $5,800 | — | 25016-90000-30670 |
| Jul 24, 2025 | Bldg-Alter/Repair: SUPPLEMENTAL TO PERMIT #25016-10000-18899 TO CORRECT WORK DESCRIPTION WHERE IT SAYS OVER NEW SHEATHING TO NOW READRe-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing___17___Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone .For residential roof replacement>50% of the total roof area, apply Cool Roof Product labeled and certified byCool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part6, Section 141 2B | Dwelling - Single Family | — | — | 25016-10001-18899 |
| Jul 11, 2025 | Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over new solid sheathing _17_Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141 2BReplacement of damaged framing members for houses and duplexes | Dwelling - Single Family | $16,500 | — | 25016-10000-18899 |
| Jul 9, 2025 | Bldg-Alter/Repair: Remove existing roof tiles, apply new underlayment and reset roof tiles | Apartment | $14,700 | — | 25016-90000-21265 |
| Jan 14, 2025 | Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing 35 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B | Apartment | $9,500 | — | 25016-70000-00996 |
Heating and cooling: 3 permits
From Dec 10, 2021 to Feb 6, 2026. Fewer than 5 heating and cooling permits since October 4, 2024 carry a declared value, so no range is computed; the rows are below.
Since October 4, 2024, 1 listed below. Earlier permits, 2, are on their house pages: 2022: 1 · 2021: 1.
| Issued | Work | Building | Declared value | Contractor as filed | Permit |
|---|---|---|---|---|---|
| Feb 6, 2026 | Bldg-Alter/Repair: 10-Window and 1-door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified byNational Fenestration Rating Council , is required for doors and windows replaced in all residentialbuildings, three stories or less, per Section 150.2 1B of Title 24 | Condo-Multi Family | $25,700 | — | 26016-10000-03519 |
Addresses on this street with a page
Source
Los Angeles Department of Building and Safety, via the city open-data portal, pulled nightly. As of October 4, 2026. Storm dates touching this street will appear here once the hail record is attached.