Permits Index
23
Permits, 24 months
49 on record
41
Roofing permits
Aug 19, 2026
Last permit issued
42
Addresses with a page

Roofing: 41 permits

From Mar 9, 2020 to Aug 19, 2026. Across 20 roofing permits since October 3, 2024, most declared values run from $4,900 to $48,400 (the middle 80%); the median is $11,700 and half fall between $6,700 and $21,250. The lowest on record is $1,200 and the highest $200,000.

Since October 3, 2024, 20 listed below. Earlier permits, 21, are on their house pages: 2024: 6 · 2023: 5 · 2022: 4 · 2021: 2 · 2020: 4.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Aug 19, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over new solid sheathing 50 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BSchool Building$15,000—26016-90000-22068
Jun 11, 2026Bldg-Alter/Repair: EPLAN REMODEL 2-STORY SFD WITH NEW ROOF DECK PER ENGINEER DESIGNNO SQFT ADDEDDwelling - Single Family$200,000—25016-10000-19837
Apr 30, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over new solid sheathing 49 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$14,700—26016-90000-11511
Apr 23, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 38 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BChurch$7,600—26016-90000-10741
Mar 27, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 100 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BSchool Building$20,000—26016-90000-08302
Mar 27, 2026Bldg-Alter/Repair: Application of an approved coating to an existing roofRetail$25,000—26016-20000-08248
Feb 3, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over new solid sheathing 24 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$7,200—26016-90000-03224
Feb 3, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing __220__Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BApartment$46,000—26016-70000-03180
Aug 22, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. overexisting solid sheathing Squares. Class A roof covering is required within Very High FireHazard Severity Zone . For residential roof replacement > 50% of the total roofarea, apply Cool Roof Product labeled and certified by Cool Roofing Rating Council .Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section141.0 2BOffice$5,250—25016-20000-25500
Jun 27, 2025Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing__26____Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone .For residential roof replacement>50% of the total roof area, apply Cool Roof Product labeled and certified byCool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part6, Section 141 2BOffice$12,000—25016-40000-20374
Jun 27, 2025Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing___9___Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone .For residential roof replacement>50% of the total roof area, apply Cool Roof Product labeled and certified byCool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part6, Section 141 2BOffice$5,000—25016-10000-20387
Jun 25, 2025Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over new solid sheathing25_Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . Forresidential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6,Section 141 2BDwelling - Single Family$25,000—25016-30000-20115
Jun 11, 2025Bldg-Alter/Repair: UPGRADE 1 BATHROOM TO BE DAS COMPIANCE AND FIRE DAMAGE REPAIR TO ROOF TO 1 STORY OFFICE/RETAIL/STORAGE PER ENGINEERING - NO CHANGE IN PARKINGRetail$70,000—24016-20000-32515
Jun 10, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 32 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BRetail Store or Business$6,400—25016-90000-18660
May 1, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 95 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BMiscellaneous Bldg/Structure$19,000—25016-90000-14139
Mar 20, 2025Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing_23_Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone .For residential roof replacement>50% of the total roof area, apply Cool Roof Product labeled and certified byCool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part6, Section 141 2BDwelling - Single Family$6,800—25016-30000-08081
Feb 10, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 6 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$1,200—25016-90000-03622
Jan 20, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over new solid sheathing 35 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$10,500—25016-90000-01520
Oct 29, 2024Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 20 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$4,000—24016-90000-34599
Oct 9, 2024Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over new solid sheathing 38 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$11,400—24016-90000-32373

Heating and cooling: 3 permits

From Apr 26, 2021 to Jul 30, 2025. Fewer than 5 heating and cooling permits since October 3, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 3, 2024, 1 listed below. Earlier permits, 2, are on their house pages: 2022: 1 · 2021: 1.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Jul 30, 2025Bldg-Alter/Repair: 13 Window and 2 door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council , is required for doors and windows replaced in all residential buildings, three stories or less, per Section 150.2 1B of Title 24Dwelling - Single Family$33,611—25016-10000-23293

Electrical: 2 permits

From Jan 19, 2021 to Jan 23, 2026. Fewer than 5 electrical permits since October 3, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 3, 2024, 1 listed below. Earlier permits, 1, are on their house pages: 2021: 1.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Jan 23, 2026Bldg-Alter/Repair: Re-plaster existing swimming pool (a separate express mechanical permit for new skimmer and a separate express electrical permit for new pool luminaire is required, when applicable, except for one and two family dwelling)School Building$20,000—26016-90000-02192

Plumbing: 2 permits

From Feb 14, 2020 to May 21, 2020. Fewer than 5 plumbing permits since October 3, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 3, 2024, 0 listed below. Earlier permits, 2, are on their house pages: 2020: 2.

IssuedWorkBuildingDeclared valueContractor as filedPermit

Solar: 1 permit

From Jun 16, 2026 to Jun 16, 2026. Fewer than 5 solar permits since October 3, 2024 carry a declared value, so no range is computed; the rows are below.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Jun 16, 2026Bldg-Alter/Repair: Eplan: Installation of solar pv on rooftop of commercial buildingHealth Club$25,000—26016-10000-09337

Addresses on this street with a page

Source

Los Angeles Department of Building and Safety, via the city open-data portal, pulled nightly. As of October 3, 2026. Storm dates touching this street will appear here once the hail record is attached.