Permits Index
3
Permits, 24 months
8 on record
6
Roofing permits
Aug 27, 2026
Last permit issued
7
Addresses with a page

Roofing: 6 permits

From Jul 17, 2021 to Jul 21, 2026. Fewer than 5 roofing permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 2, 2024, 2 listed below. Earlier permits, 4, are on their house pages: 2023: 1 · 2021: 3.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Jul 21, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 17 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$3,400—26016-90000-19302
May 28, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 16 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$3,200—26016-90000-14146

Heating and cooling: 2 permits

From Jun 23, 2023 to Aug 27, 2026. Fewer than 5 heating and cooling permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 2, 2024, 1 listed below. Earlier permits, 1, are on their house pages: 2023: 1.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Aug 27, 2026Bldg-Alter/Repair: Eight door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council , is required for doors replaced in all residential buildings, three stories or less, per Title 24, Part 6, Section 150.2 1B. Kitchen & bathroom remodel for residential buildings (mechanical, electrical & hvac included). Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 13 squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B. Drywall repairs for single family dwellings and duplexes only."Comply with departmnet order. Permit to expire 30 days from issuance date."Dwelling - Single Family$18,000—26016-70000-22941

Addresses on this street with a page

Source

Los Angeles Department of Building and Safety, via the city open-data portal, pulled nightly. As of October 2, 2026. Storm dates touching this street will appear here once the hail record is attached.