Permits Index
5
Permits, 24 months
22 on record
13
Roofing permits
Aug 27, 2026
Last permit issued
21
Addresses with a page

Roofing: 13 permits

From Nov 12, 2020 to Aug 27, 2026. Fewer than 5 roofing permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 2, 2024, 5 listed below. Earlier permits, 8, are on their house pages: 2024: 2 · 2023: 2 · 2022: 2 · 2021: 1 · 2020: 1.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Aug 27, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 20 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$4,000—26016-90000-22952
Aug 10, 2026Bldg-Alter/Repair: ePlan: Convert attached garage to storage and laundry room and add a roof deck above storage room, remove covered parking per AB 2097 in 2-story SFDStorage Building$12,000—26016-10000-14713
Jul 23, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over new solid sheathing 22 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$6,600—26016-90000-19411
Jul 2, 2025Bldg-Alter/Repair: eplan,Deferred Submittal for Glass Guardrail and steel guards from level 3 to level 7 and Roof Deck per plan. Supplemental to 20010-10000-01937Apartment——20010-10006-01937
Oct 29, 2024Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 15 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$3,000—24016-90000-34662

Plumbing: 7 permits

From May 24, 2021 to Jul 22, 2024. Fewer than 5 plumbing permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 2, 2024, 0 listed below. Earlier permits, 7, are on their house pages: 2024: 1 · 2022: 3 · 2021: 3.

IssuedWorkBuildingDeclared valueContractor as filedPermit

Heating and cooling: 2 permits

From Oct 4, 2022 to Aug 29, 2023. Fewer than 5 heating and cooling permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 2, 2024, 0 listed below. Earlier permits, 2, are on their house pages: 2023: 1 · 2022: 1.

IssuedWorkBuildingDeclared valueContractor as filedPermit

Addresses on this street with a page

Source

Los Angeles Department of Building and Safety, via the city open-data portal, pulled nightly. As of October 2, 2026. Storm dates touching this street will appear here once the hail record is attached.