Permits Index
18
Permits, 24 months
40 on record
35
Roofing permits
Jul 8, 2026
Last permit issued
36
Addresses with a page

Roofing: 35 permits

From Apr 24, 2020 to Jul 8, 2026. Across 17 roofing permits since October 2, 2024, most declared values run from $4,680 to $19,600 (the middle 80%); the median is $7,800 and half fall between $6,000 and $12,500. The lowest on record is $4,000 and the highest $35,000.

Since October 2, 2024, 17 listed below. Earlier permits, 18, are on their house pages: 2024: 3 · 2023: 7 · 2022: 3 · 2021: 2 · 2020: 3.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Jul 8, 2026Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing__10____Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone .For residential roof replacement>50% of the total roof area, apply Cool Roof Product labeled and certified byCool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part6, Section 141 2BDwelling - Single Family$9,000—26016-10000-16576
Mar 18, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 32 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$6,400—26016-90000-07354
Mar 10, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 20 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$4,000—26016-90000-06469
Feb 23, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 21 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$4,200—26016-90000-04905
Feb 21, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 55 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BChurch$11,000—26016-90000-04761
Dec 10, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 35 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$7,000—25016-90000-36242
Oct 23, 2025Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over EXISTING solid sheathing _55_____Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 149Apartment$35,000—25016-40000-31427
Jun 11, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over new solid sheathing 26 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BChurch$7,800—25016-90000-18728
Jun 10, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 80 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BApartment$16,000—25016-90000-18574
May 2, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 26 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BOffice$5,200—25016-90000-14267
Jan 3, 2025Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over EXISTING solid sheathing _14__Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 149Dwelling - Single Family$6,000—24016-40000-30878
Nov 15, 2024Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing 9 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$5,000—24016-10000-36091
Nov 12, 2024Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roofing Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDuplex$11,000—24016-20000-34131
Nov 12, 2024Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roofing Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$13,800—24016-20000-33275
Nov 12, 2024Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. overexisting solid sheathing Squares. Class A roof covering is required within Very HighFireHazard Severity Zone . For residential roof replacement > 50% of the total roof area,apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roofmay be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$12,500—24016-20000-33258
Oct 24, 2024Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. overexisting solid sheathing Squares. Class A roof covering is required within Very High FireHazard Severity Zone . For residential roof replacement > 50% of the total roofarea, apply Cool Roof Product labeled and certified by Cool Roofing Rating Council .Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section141.0 2BDwelling - Single Family$6,650—24016-20000-32844
Oct 5, 2024Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over EXISTING solid sheathing _20_Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 149Dwelling - Single Family$25,000—24016-40000-30528

Plumbing: 2 permits

From Jun 15, 2023 to Nov 20, 2024. Fewer than 5 plumbing permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 2, 2024, 1 listed below. Earlier permits, 1, are on their house pages: 2023: 1.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Nov 20, 2024Bldg-Alter/Repair: 1 bathroom remodel for residential buildings . Including Mechanical, Electrical and PlumbingDwelling - Single Family$8,000—24016-10000-37136

Electrical: 1 permit

From Jun 29, 2023 to Jun 29, 2023. Fewer than 5 electrical permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 2, 2024, 0 listed below. Earlier permits, 1, are on their house pages: 2023: 1.

IssuedWorkBuildingDeclared valueContractor as filedPermit

Solar: 1 permit

From May 19, 2021 to May 19, 2021. Fewer than 5 solar permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 2, 2024, 0 listed below. Earlier permits, 1, are on their house pages: 2021: 1.

IssuedWorkBuildingDeclared valueContractor as filedPermit

Heating and cooling: 1 permit

From Feb 6, 2020 to Feb 6, 2020. Fewer than 5 heating and cooling permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 2, 2024, 0 listed below. Earlier permits, 1, are on their house pages: 2020: 1.

IssuedWorkBuildingDeclared valueContractor as filedPermit

Addresses on this street with a page

Source

Los Angeles Department of Building and Safety, via the city open-data portal, pulled nightly. As of October 2, 2026. Storm dates touching this street will appear here once the hail record is attached.