W Addison Way, Los Angeles: permits on record
27 home-service permits on record on W Addison Way since November 18, 2020, 13 of them since October 3, 2024, at 26 addresses. Home-service permits only (roofing, heating and cooling, solar, electrical, plumbing, water heaters); other building permits are kept in the record and not shown. Permits are listed without house numbers; each address has its own page below.
Roofing: 24 permits
From Nov 18, 2020 to Jul 20, 2026. Across 12 roofing permits since October 3, 2024, most declared values run from $3,380 to $9,670 (the middle 80%); the median is $6,600 and half fall between $5,000 and $8,500. The lowest on record is $1,000 and the highest $50,000.
Since October 3, 2024, 13 listed below. Earlier permits, 11, are on their house pages: 2024: 2 · 2023: 2 · 2022: 5 · 2021: 1 · 2020: 1.
| Issued | Work | Building | Declared value | Contractor as filed | Permit |
|---|---|---|---|---|---|
| Jul 20, 2026 | Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 27 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B | Dwelling - Single Family | $5,400 | — | 26016-90000-19096 |
| Jul 16, 2026 | Bldg-Alter/Repair: EPLAN: INTERIOR REMODEL SFD THRU-OUT. DEMO PORTION OF ROOF AND REPLACE WITH NEW ROOF. REMOVE AND REPLACE ALL WINDOWS | Dwelling - Single Family | $50,000 | — | 26016-10000-11105 |
| Mar 10, 2026 | Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 36 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B | Dwelling - Single Family | $7,200 | — | 26016-90000-06497 |
| Mar 4, 2026 | Bldg-Alter/Repair: ***SUPPLEMENTAL TO PERMIT 26016-90000-05095***TO CHANGE WORK DESCRIPTION TO READ Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over new solid sheathing __30____Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141 2B | Dwelling - Single Family | — | — | 26016-30001-05095 |
| Feb 24, 2026 | Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 30 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B | Dwelling - Single Family | $6,000 | — | 26016-90000-05095 |
| Feb 22, 2026 | Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 16 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B | Dwelling - Single Family | $3,200 | — | 26016-90000-04783 |
| Feb 19, 2026 | Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 40 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B | Dwelling - Single Family | $8,000 | — | 26016-90000-04605 |
| Oct 14, 2025 | Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing___8___Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone .For residential roof replacement>50% of the total roof area, apply Cool Roof Product labeled and certified byCool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part6, Section 141 2B | Dwelling - Single Family | $5,000 | — | 25016-10000-30635 |
| Oct 9, 2025 | Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. overexisting solid sheathing Squares. Class A roof covering is required within Very High FireHazard Severity Zone . For residential roof replacement > 50% of the total roofarea, apply Cool Roof Product labeled and certified by Cool Roofing Rating Council .Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section141.0 2B | Dwelling - Single Family | $5,000 | — | 25016-20000-30317 |
| Oct 9, 2025 | Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. overexisting solid sheathing Squares. Class A roof covering is required within Very High FireHazard Severity Zone . For residential roof replacement > 50% of the total roofarea, apply Cool Roof Product labeled and certified by Cool Roofing Rating Council .Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section141.0 2B | Dwelling - Single Family | $8,500 | — | 25016-20000-30299 |
| Oct 9, 2025 | Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roofing Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B | Dwelling - Single Family | $8,500 | — | 25016-20000-30292 |
| Oct 9, 2025 | Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over new solid sheathing___16___Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141 2B | Dwelling - Single Family | $9,800 | — | 25016-10000-30337 |
| Mar 16, 2025 | Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 5 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B | Dwelling - Single Family | $1,000 | — | 25016-90000-07395 |
Plumbing: 2 permits
From Nov 10, 2022 to Apr 5, 2023. Fewer than 5 plumbing permits since October 3, 2024 carry a declared value, so no range is computed; the rows are below.
Since October 3, 2024, 0 listed below. Earlier permits, 2, are on their house pages: 2023: 1 · 2022: 1.
| Issued | Work | Building | Declared value | Contractor as filed | Permit |
|---|
Heating and cooling: 1 permit
From Oct 14, 2021 to Oct 14, 2021. Fewer than 5 heating and cooling permits since October 3, 2024 carry a declared value, so no range is computed; the rows are below.
Since October 3, 2024, 0 listed below. Earlier permits, 1, are on their house pages: 2021: 1.
| Issued | Work | Building | Declared value | Contractor as filed | Permit |
|---|
Addresses on this street with a page
Source
Los Angeles Department of Building and Safety, via the city open-data portal, pulled nightly. As of October 3, 2026. Storm dates touching this street will appear here once the hail record is attached.