Permits Index
7
Permits, 24 months
27 on record
26
Roofing permits
May 13, 2026
Last permit issued
26
Addresses with a page

Roofing: 26 permits

From Sep 21, 2020 to May 13, 2026. Across 6 roofing permits since October 3, 2024, most declared values run from $5,100 to $46,500 (the middle 80%); the median is $6,200 and half fall between $5,400 and $7,600. The lowest on record is $5,000 and the highest $85,000.

Since October 3, 2024, 6 listed below. Earlier permits, 20, are on their house pages: 2024: 5 · 2023: 4 · 2022: 5 · 2021: 2 · 2020: 4.

IssuedWorkBuildingDeclared valueContractor as filedPermit
May 13, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 25 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$5,000—26016-90000-12774
Feb 21, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 26 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$5,200—26016-90000-04756
Jan 28, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 40 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$8,000—26016-90000-02656
Jun 6, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 32 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$6,400—25016-90000-18338
May 22, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over new solid sheathing 20 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$6,000—25016-90000-16833
Nov 5, 2024Bldg-Alter/Repair: ePlan: Remove and replace fire damaged roof framingRemove and replace drywall and insulationInstall New windowsNew garage doorDwelling - Single Family$85,000—24016-20000-15595

Heating and cooling: 1 permit

From Jul 3, 2025 to Jul 3, 2025. Fewer than 5 heating and cooling permits since October 3, 2024 carry a declared value, so no range is computed; the rows are below.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Jul 3, 2025Bldg-Alter/Repair: 10 window . Window and door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council , is required for doors and windows replaced in all residential buildings, three stories or less, per Title 24, Part 6, Section 150.2 1BDwelling - Single Family$2,500—25016-90000-20966

Addresses on this street with a page

Source

Los Angeles Department of Building and Safety, via the city open-data portal, pulled nightly. As of October 3, 2026. Storm dates touching this street will appear here once the hail record is attached.