Permits Index
6
Permits, 24 months
13 on record
7
Roofing permits
Sep 22, 2026
Last permit issued
12
Addresses with a page

Roofing: 7 permits

From Mar 6, 2020 to Sep 22, 2026. Fewer than 5 roofing permits since October 4, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 4, 2024, 4 listed below. Earlier permits, 3, are on their house pages: 2024: 1 · 2023: 1 · 2020: 1.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Sep 22, 2026Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over new solid sheathing_95_Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Productlabeled and certified by Cool Roof Rating Council . Cool Roof may be required fornon-residential buildings per Title 24, Part 6, Section 149Condo-Multi Family$75,000—26016-40000-25734
Jun 12, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 14 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BApartment$2,800—26016-90000-15620
Jun 12, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over new solid sheathing 32 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BApartment$9,600—26016-90000-15609
Sep 22, 2025Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing __54____Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 149Apartment$25,985—25016-20000-28426

Heating and cooling: 4 permits

From May 19, 2021 to Aug 20, 2025. Fewer than 5 heating and cooling permits since October 4, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 4, 2024, 2 listed below. Earlier permits, 2, are on their house pages: 2024: 1 · 2021: 1.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Aug 20, 2025Bldg-Alter/Repair: 49 window . Window and door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council , is required for doors and windows replaced in all residential buildings, three stories or less, per Title 24, Part 6, Section 150.2 1BDuplex$12,250—25016-90000-25298
Apr 29, 2025Bldg-Alter/Repair: 2--WINDOW change-out (same size & type) for residential buildings. Window change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council , is required for doors and windows replaced in all residential buildings, three stories or less, per Section 150.2 1B of Title 24Condo-Single Family$3,100—25016-40000-13598

Plumbing: 2 permits

From Nov 8, 2021 to Nov 8, 2021. Fewer than 5 plumbing permits since October 4, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 4, 2024, 0 listed below. Earlier permits, 2, are on their house pages: 2021: 2.

IssuedWorkBuildingDeclared valueContractor as filedPermit

Addresses on this street with a page

Source

Los Angeles Department of Building and Safety, via the city open-data portal, pulled nightly. As of October 4, 2026. Storm dates touching this street will appear here once the hail record is attached.