Permits Index
2
Permits, 24 months
36 on record
31
Roofing permits
Apr 25, 2025
Last permit issued
26
Addresses with a page

Roofing: 31 permits

From Feb 11, 2020 to Apr 25, 2025. Fewer than 5 roofing permits since October 5, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 5, 2024, 2 listed below. Earlier permits, 29, are on their house pages: 2024: 4 · 2023: 6 · 2022: 6 · 2021: 9 · 2020: 4.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Apr 25, 2025Bldg-Alter/Repair: Change of Use for 5th roof deck from building maintenance and service to assembly. Roof conversion of 5th floor existing roof deck to usable space in an office building . New roofing, paver system, planters, steel frame, guardrail extension at parapet, exterior doors and interior ramp, power lighting and finishes. Install new trellis . Curtainwall modifications will be deferred submittalOffice$185,000—24016-10000-33640
Nov 22, 2024Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 22 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$4,400—24016-90000-37395

Plumbing: 3 permits

From Mar 2, 2021 to Nov 20, 2023. Fewer than 5 plumbing permits since October 5, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 5, 2024, 0 listed below. Earlier permits, 3, are on their house pages: 2023: 2 · 2021: 1.

IssuedWorkBuildingDeclared valueContractor as filedPermit

Heating and cooling: 2 permits

From Mar 31, 2021 to Apr 15, 2022. Fewer than 5 heating and cooling permits since October 5, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 5, 2024, 0 listed below. Earlier permits, 2, are on their house pages: 2022: 1 · 2021: 1.

IssuedWorkBuildingDeclared valueContractor as filedPermit

Addresses on this street with a page

Source

Los Angeles Department of Building and Safety, via the city open-data portal, pulled nightly. As of October 5, 2026. Storm dates touching this street will appear here once the hail record is attached.