Permits Index
7
Permits, 24 months
20 on record
17
Roofing permits
Aug 17, 2026
Last permit issued
20
Addresses with a page

Roofing: 17 permits

From Apr 27, 2020 to Aug 17, 2026. Fewer than 5 roofing permits since October 5, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 5, 2024, 4 listed below. Earlier permits, 13, are on their house pages: 2023: 2 · 2022: 4 · 2021: 5 · 2020: 2.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Aug 17, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over new solid sheathing Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roofing Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BApartment$12,000—26016-20000-21796
May 20, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 29 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$5,800—26016-90000-13445
Dec 12, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 20 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$4,000—25016-90000-36529
Dec 1, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 28 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$5,600—25016-90000-35116

Electrical: 2 permits

From Jan 15, 2025 to Feb 19, 2026. Fewer than 5 electrical permits since October 5, 2024 carry a declared value, so no range is computed; the rows are below.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Feb 19, 2026Bldg-Alter/Repair: Eplan.Supplemental to PCIS# 25010-20000-00138 To revise title 24. Change from all electric to natural gasAccessory Dwelling Unit$501—25010-20001-00138
Jan 15, 2025Bldg-Alter/Repair: Re-plaster existing swimming pool (a separate express mechanical permit for new skimmer and a separate express electrical permit for new pool luminaire is required, when applicable, except for one and two family dwelling)Dwelling - Single Family$8,000—25016-90000-01151

Heating and cooling: 1 permit

From Oct 11, 2024 to Oct 11, 2024. Fewer than 5 heating and cooling permits since October 5, 2024 carry a declared value, so no range is computed; the rows are below.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Oct 11, 2024Bldg-Alter/Repair: Bathroom remodel for residential buildings . Window and door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council , is required for doors and windows replaced in all residential buildings, three stories or less, per Title 24, Part 6, Section 150.2 1B. "COMPLY WITH DEPARTMENT ORDER effective date 10/07/2024. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATE"Dwelling - Single Family$35,000—24016-20000-32641

Addresses on this street with a page

Source

Los Angeles Department of Building and Safety, via the city open-data portal, pulled nightly. As of October 5, 2026. Storm dates touching this street will appear here once the hail record is attached.