W Horace St, Los Angeles: permits on record
47 home-service permits on record on W Horace St since February 28, 2020, 16 of them since October 4, 2024, at 39 addresses. Home-service permits only (roofing, heating and cooling, solar, electrical, plumbing, water heaters); other building permits are kept in the record and not shown. Permits are listed without house numbers; each address has its own page below.
Roofing: 40 permits
From Feb 28, 2020 to Aug 13, 2026. Across 12 roofing permits since October 4, 2024, most declared values run from $1,100 to $9,070 (the middle 80%); the median is $5,600 and half fall between $3,350 and $6,700. The lowest on record is $600 and the highest $11,800.
Since October 4, 2024, 14 listed below. Earlier permits, 26, are on their house pages: 2024: 7 · 2023: 5 · 2022: 4 · 2021: 5 · 2020: 5.
| Issued | Work | Building | Declared value | Contractor as filed | Permit |
|---|---|---|---|---|---|
| Aug 13, 2026 | Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 59 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B | Dwelling - Single Family | $11,800 | — | 26016-90000-21485 |
| Jul 31, 2026 | Bldg-Alter/Repair: SUPPLEMENTAL PERMIT TO 26016-90000-16882 TO UPDATE WORK DESCRIPTION TO READ:Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over new solid sheathing_10_Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Productlabeled and certified by Cool Roof Rating Council . Cool Roof may be required fornon-residential buildings per Title 24, Part 6, Section 149 . DETACHED GARAGE ONLY | Garage - Private | — | — | 26016-10001-16882 |
| Jul 27, 2026 | Bldg-Alter/Repair: SUPPLEMENTAL PERMIT TO #26016-90000-16847 TO REVISE WORK DESCRIPTION TO: "Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over NEW solid sheathing __33__Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B." | Dwelling - Single Family | — | — | 26016-10001-16847 |
| Jun 25, 2026 | Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 10 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B | Garage - Private | $2,000 | — | 26016-90000-16882 |
| Jun 25, 2026 | Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 33 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B | Dwelling - Single Family | $6,600 | — | 26016-90000-16847 |
| May 12, 2026 | Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 24 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B | Dwelling - Single Family | $4,800 | — | 26016-90000-12523 |
| May 5, 2026 | Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 5 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B | Garage - Private | $1,000 | — | 26016-90000-11792 |
| May 5, 2026 | Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 19 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B | Dwelling - Single Family | $3,800 | — | 26016-90000-11790 |
| Apr 12, 2026 | Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 35 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B | Dwelling - Single Family | $7,000 | — | 26016-90000-09600 |
| Jul 11, 2025 | Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 3 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B | Dwelling - Single Family | $600 | — | 25016-90000-21532 |
| Jun 5, 2025 | Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 28 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B | Dwelling - Single Family | $5,600 | — | 25016-90000-18269 |
| Mar 11, 2025 | Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 28 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B | Dwelling - Single Family | $5,600 | — | 25016-90000-06784 |
| Feb 26, 2025 | Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 33 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B | Dwelling - Single Family | $6,600 | — | 25016-90000-05271 |
| Jan 8, 2025 | Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over new solid sheathing 31 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B | Dwelling - Single Family | $9,300 | — | 25016-90000-00578 |
Heating and cooling: 5 permits
From Sep 13, 2023 to Aug 19, 2025. Fewer than 5 heating and cooling permits since October 4, 2024 carry a declared value, so no range is computed; the rows are below.
Since October 4, 2024, 2 listed below. Earlier permits, 3, are on their house pages: 2024: 2 · 2023: 1.
| Issued | Work | Building | Declared value | Contractor as filed | Permit |
|---|---|---|---|---|---|
| Aug 19, 2025 | Bldg-Alter/Repair: 5 window . Window and door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council , is required for doors and windows replaced in all residential buildings, three stories or less, per Title 24, Part 6, Section 150.2 1B | Dwelling - Single Family | $1,250 | — | 25016-90000-25096 |
| Feb 21, 2025 | Bldg-Alter/Repair: 11-Window change-out (same size & type) for residential buildings. Dual glazing, labeledand certified by National Fenestration Rating Council , is required for doors and windowsreplaced in all residential buildings, three stories or less, per Title 24, Part 6, Section 150.2 1B | Dwelling - Single Family | $4,000 | — | 25016-20000-04901 |
Plumbing: 2 permits
From Jun 25, 2020 to Aug 23, 2023. Fewer than 5 plumbing permits since October 4, 2024 carry a declared value, so no range is computed; the rows are below.
Since October 4, 2024, 0 listed below. Earlier permits, 2, are on their house pages: 2023: 1 · 2020: 1.
| Issued | Work | Building | Declared value | Contractor as filed | Permit |
|---|
Addresses on this street with a page
Source
Los Angeles Department of Building and Safety, via the city open-data portal, pulled nightly. As of October 4, 2026. Storm dates touching this street will appear here once the hail record is attached.