Permits Index
5
Permits, 24 months
8 on record
8
Roofing permits
Sep 18, 2026
Last permit issued
7
Addresses with a page

Roofing: 8 permits

From May 4, 2021 to Sep 18, 2026. Fewer than 5 roofing permits since October 7, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 7, 2024, 5 listed below. Earlier permits, 3, are on their house pages: 2023: 1 · 2022: 1 · 2021: 1.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Sep 18, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solidsheathing __25____Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeledand certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildingsper Title 24, Part 6, Section 141.0 2BDwelling - Single Family$9,500—26016-20000-25474
Aug 29, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over new solid sheathing 29 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDuplex$8,700—26016-90000-23202
Jul 8, 2025Bldg-Alter/Repair: SUPPLEMENTAL PERMIT TO #25016-10000-20259 TO REVISE WORK DESCRIPTION TO READ:Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over NEW solid sheathing__30____Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone .For residential roof replacement>50% of the total roof area, apply Cool Roof Product labeled and certified byCool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part6, Section 141 2BDwelling - Single Family——25016-20001-20259
Jun 26, 2025Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing__30____Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone .For residential roof replacement>50% of the total roof area, apply Cool Roof Product labeled and certified byCool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part6, Section 141 2BDwelling - Single Family$35,000—25016-10000-20259
Jan 24, 2025Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over EXISTING solid sheathing _41_Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 149Dwelling - Single Family$22,000—25016-40000-02098

Addresses on this street with a page

Source

Los Angeles Department of Building and Safety, via the city open-data portal, pulled nightly. As of October 7, 2026. Storm dates touching this street will appear here once the hail record is attached.