Permits Index
5
Permits, 24 months
11 on record
9
Roofing permits
Mar 16, 2026
Last permit issued
9
Addresses with a page

Roofing: 9 permits

From Apr 26, 2021 to Sep 2, 2025. Fewer than 5 roofing permits since October 4, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 4, 2024, 4 listed below. Earlier permits, 5, are on their house pages: 2024: 2 · 2023: 1 · 2021: 2.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Sep 2, 2025Bldg-Alter/Repair: SUPPLEMENTAL TO PERMIT # 25016-30000-25666, TO CORRECT WORK DESCRIPTION TO READ "Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over new solid sheathing24_Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . Forresidential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6,Section 141 2B."Dwelling - Single Family——25016-30001-25666
Aug 25, 2025Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing __Squares. Class A roof covering is required within a Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$15,000—25016-30000-25666
Jul 8, 2025Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing _36_Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement>50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141 2BCondo-Multi Family$50,000—25016-10000-21202
Jun 26, 2025Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over EXISTING solid sheathing __43__Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BCondo-Multi Family$15,000—25016-10000-20303

Heating and cooling: 2 permits

From Sep 15, 2021 to Mar 16, 2026. Fewer than 5 heating and cooling permits since October 4, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 4, 2024, 1 listed below. Earlier permits, 1, are on their house pages: 2021: 1.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Mar 16, 2026Bldg-Alter/Repair: 6 window . Window and door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council , is required for doors and windows replaced in all residential buildings, three stories or less, per Title 24, Part 6, Section 150.2 1B.4 door . Window and door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council , is required for doors and windows replaced in all residential buildings, three stories or less, per Title 24, Part 6, Section 150.2 1BDuplex$2,500—26016-90000-07072

Addresses on this street with a page

Source

Los Angeles Department of Building and Safety, via the city open-data portal, pulled nightly. As of October 4, 2026. Storm dates touching this street will appear here once the hail record is attached.