Permits Index
1
Permits, 24 months
14 on record
5
Roofing permits
Apr 7, 2025
Last permit issued
11
Addresses with a page

Roofing: 5 permits

From Jul 30, 2020 to Jul 3, 2023. Fewer than 5 roofing permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 2, 2024, 0 listed below. Earlier permits, 5, are on their house pages: 2023: 1 · 2022: 1 · 2021: 2 · 2020: 1.

IssuedWorkBuildingDeclared valueContractor as filedPermit

Heating and cooling: 7 permits

From Feb 24, 2022 to Apr 7, 2025. Fewer than 5 heating and cooling permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 2, 2024, 1 listed below. Earlier permits, 6, are on their house pages: 2024: 1 · 2023: 4 · 2022: 1.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Apr 7, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over new solid sheathing 2 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B.5 window . Window and door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council , is required for doors and windows replaced in all residential buildings, three stories or less, per Title 24, Part 6, Section 150.2 1B.Replace existing siding with new stucco for single family dwellings and duplex only. Area = 160 sqft.Replacement of damaged framing members for single family dwellings and duplexDwelling - Single Family$6,351—25016-90000-10512

Plumbing: 2 permits

From Apr 7, 2022 to Apr 7, 2022. Fewer than 5 plumbing permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 2, 2024, 0 listed below. Earlier permits, 2, are on their house pages: 2022: 2.

IssuedWorkBuildingDeclared valueContractor as filedPermit

Addresses on this street with a page

Source

Los Angeles Department of Building and Safety, via the city open-data portal, pulled nightly. As of October 2, 2026. Storm dates touching this street will appear here once the hail record is attached.