W Olympic Blvd, Los Angeles: permits on record
90 home-service permits on record on W Olympic Blvd since May 18, 2020, 30 of them since October 2, 2024, at 72 addresses. Home-service permits only (roofing, heating and cooling, solar, electrical, plumbing, water heaters); other building permits are kept in the record and not shown. Permits are listed without house numbers; each address has its own page below.
Roofing: 68 permits
From May 18, 2020 to Sep 24, 2026. Across 20 roofing permits since October 2, 2024, most declared values run from $3,985 to $160,264 (the middle 80%); the median is $28,292 and half fall between $9,075 and $87,040. The lowest on record is $501 and the highest $19,500,000.
Since October 2, 2024, 22 listed below. Earlier permits, 46, are on their house pages: 2024: 7 · 2023: 16 · 2022: 9 · 2021: 5 · 2020: 9.
| Issued | Work | Building | Declared value | Contractor as filed | Permit |
|---|---|---|---|---|---|
| Sep 24, 2026 | Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 28 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B | Apartment | $5,600 | — | 26016-90000-26075 |
| Sep 21, 2026 | Bldg-Alter/Repair: NDC-469 ePlan. Core & Shell Work and change of use portion of office on 1st floor to restaurant, remove and replace existing roofing. Seismic retrofit of building for compliance with NDC Retrofit Ordinance.Remove and replace of the existing Curtain Wall and FRP wrap are deferred submittals | Office | $19,500,000 | — | 24016-10000-08274 |
| Jul 28, 2026 | Bldg-Alter/Repair: Application of an approved coating to an existing roof | Retail Store or Business | $89,500 | — | 26016-90000-19885 |
| Jul 28, 2026 | Bldg-Alter/Repair: Deferred submittal PERMIT 22010-10000-06040Exterior Building Maintenance equipment @ ROOF | Apartment | $50,000 | — | 22010-10005-06040 |
| Jul 16, 2026 | Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing __10____Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B | Garage - Private | $4,150 | — | 26016-20000-18142 |
| Jul 16, 2026 | Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing __49____Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B | Apartment | $20,750 | — | 26016-20000-18138 |
| Jun 3, 2026 | Bldg-Alter/Repair: EPLANSupplemental 25016-10000-20260 to check the revised RTU weight of the roof mechanical unit. There is no additional scope of work associated with this revision | Night Club | $501 | — | 26016-10000-14498 |
| May 28, 2026 | Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing___60___Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone .For residential roof replacement>50% of the total roof area, apply Cool Roof Product labeled and certified byCool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part6, Section 141 2B | Pool/Spa - Public | $40,000 | — | 26016-10000-12164 |
| Mar 18, 2026 | Bldg-Alter/Repair: Installation of additional steel reinforcement for window washing equipmentat penthouse roof per engineer details | Office | — | — | 25016-10000-33338 |
| Mar 18, 2026 | Bldg-Alter/Repair: Installation of steel beams for window washing equipment at roof per engineer details | Office | $122,515 | — | 25016-10000-31641 |
| Jan 15, 2026 | Bldg-Alter/Repair: URM BUILDING) VOLUNTARY TRUSS + PLASTER UPGRADE FOR OPEN BARRER TRUSS ROOF LINES TOTAL TRUSSES. VOLUNTARY FIBERWRAP @ TOP OF PARKING GARAGE AT COLUMNS FOR ADDITIONAL TENSION CAPACITY. TOP OF COLUMNS & PARKING RESTRIPE | Retail | $500,000 | — | 25016-10000-15434 |
| Jan 9, 2026 | Bldg-Alter/Repair: EPLAN: TENANT IMPROVEMENT TO REMODEL RESTROOMS AND REROOF CHURCH | Church | $25,000 | — | 25016-10000-14961 |
| Jan 8, 2026 | Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing 8 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B | Apartment | $2,500 | — | 25016-10000-37996 |
| Jan 7, 2026 | Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing_25_Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone .For residential roof replacement>50% of the total roof area, apply Cool Roof Product labeled and certified byCool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part6, Section 141 2B. DETACHED GARAGE INCLUDED | Apartment | $19,600 | — | 25016-10000-37506 |
| Sep 15, 2025 | Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 198 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B | Warehouse | $39,600 | — | 25016-90000-27785 |
| Aug 22, 2025 | Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over new solid sheathing 7573 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B | Hotel | $86,920 | — | 25016-10000-25081 |
| Mar 13, 2025 | Bldg-Alter/Repair: "COMPLY WITH DEPARTMENT ORDER effective date 06/16/2009. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATE". Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing 22 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement>50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141 2B | Auto Repair Garage | $31,584 | — | 25016-30000-07017 |
| Dec 26, 2024 | Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over EXISTING solid sheathing _48_Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 149 | Miscellaneous Bldg/Structure | $87,400 | — | 24016-40000-40409 |
| Nov 15, 2024 | Bldg-Alter/Repair: Supplemental to permit # 24016-30000-32842 to change the work description to: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over New solid sheathing __26_Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141 2B. WITH ATTACHED GARAGEFrom: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing __26_Squares | Dwelling - Single Family | — | — | 24016-30001-32842 |
| Nov 1, 2024 | Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 58 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B | Church | $11,600 | — | 24016-90000-35049 |
| Oct 18, 2024 | Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing __26_Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141 2B. WITH ATTACHED GARAGE | Dwelling - Single Family | $9,100 | — | 24016-30000-32842 |
| Oct 4, 2024 | Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing __20__Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B. DETACHED GARAGE INCLUDED"COMPLY WITH DEPARTMENT ORDER effective date09/17/2024. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATE". Allpermits shall be for the same time period limitation. Ifadditional assistance is needed, please call Inspector RUBENPEREZ at 252-3048 of GENERAL ENFORCEMENT CENTRAL. CEIS CaseNumber is 1020173 | Dwelling - Single Family | $9,000 | — | 24016-30000-31598 |
Plumbing: 9 permits
From May 21, 2020 to Mar 7, 2025. Fewer than 5 plumbing permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.
Since October 2, 2024, 3 listed below. Earlier permits, 6, are on their house pages: 2022: 3 · 2021: 2 · 2020: 1.
| Issued | Work | Building | Declared value | Contractor as filed | Permit |
|---|---|---|---|---|---|
| Mar 7, 2025 | Bldg-Demolition: Demolish existing commercial building by handwreck, sewer cap and fence required | Restaurant | $5,000 | — | 24019-10000-00427 |
| Jan 9, 2025 | Bldg-Demolition: ePlan Demolition of existing story Restaurant by Ball Wrecking method.Sewer cap require | Retail | $12,000 | — | 22019-10000-02172 |
| Dec 11, 2024 | Bldg-Alter/Repair: TENANT IMPROVEMENT TO OFFICE, INTERIOR REMODEL TO REMOVE WALLS, ADD OFFICE DESKS, EXISTING PLUMBING FIXTURES TO REMAIN. NO CHANGE IN OCCUPANCY | Office | $146,408 | — | 24016-10000-28012 |
Solar: 6 permits
From Jun 10, 2021 to Feb 4, 2025. Fewer than 5 solar permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.
Since October 2, 2024, 1 listed below. Earlier permits, 5, are on their house pages: 2023: 1 · 2022: 2 · 2021: 2.
| Issued | Work | Building | Declared value | Contractor as filed | Permit |
|---|---|---|---|---|---|
| Feb 4, 2025 | Bldg-Alter/Repair: ePlan: Structural support for new roof top solar pv system | Warehouse | $150,000 | — | 24016-10000-23960 |
Heating and cooling: 5 permits
From Aug 29, 2022 to Jun 15, 2026. Fewer than 5 heating and cooling permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.
Since October 2, 2024, 4 listed below. Earlier permits, 1, are on their house pages: 2022: 1.
| Issued | Work | Building | Declared value | Contractor as filed | Permit |
|---|---|---|---|---|---|
| Jun 15, 2026 | Bldg-Alter/Repair: Supplemental permit to 26016 - 20000 - 04622 to ADD:Window change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council , is required for doors and windows replaced in all residential buildings, three stories or less, per Section 150.2 1B of Title 24 | Dwelling - Single Family | $1,500 | — | 26016-20001-04622 |
| May 22, 2025 | Bldg-Alter/Repair: Window and door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council , is required for doors and windows replaced in all residential buildings, three stories or less, per Section 150.2 1B of Title 24 | Condo-Single Family | $15,200 | — | 25016-30000-16820 |
| Feb 28, 2025 | Bldg-Alter/Repair: Window change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council , is required for doors and windows replaced in all residential buildings, three stories or less, per Section 150.2 1B of Title 24 | Apartment | $501 | — | 23016-20000-21584 |
| Jan 16, 2025 | Bldg-Alter/Repair: EPLAN: HVAC equipment connection to strucure on roof and 3rd floor | Apartment | $2,000 | — | 24016-10000-40499 |
Electrical: 2 permits
From Sep 28, 2021 to Mar 24, 2023. Fewer than 5 electrical permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.
Since October 2, 2024, 0 listed below. Earlier permits, 2, are on their house pages: 2023: 1 · 2021: 1.
| Issued | Work | Building | Declared value | Contractor as filed | Permit |
|---|
Addresses on this street with a page
Source
Los Angeles Department of Building and Safety, via the city open-data portal, pulled nightly. As of October 2, 2026. Storm dates touching this street will appear here once the hail record is attached.