W Pico Blvd, Los Angeles: permits on record
97 home-service permits on record on W Pico Blvd since January 10, 2020, 29 of them since October 4, 2024, at 84 addresses. Home-service permits only (roofing, heating and cooling, solar, electrical, plumbing, water heaters); other building permits are kept in the record and not shown. Permits are listed without house numbers; each address has its own page below.
Roofing: 72 permits
From Jan 10, 2020 to Aug 4, 2026. Across 22 roofing permits since October 4, 2024, most declared values run from $7,460 to $121,931 (the middle 80%); the median is $20,050 and half fall between $9,700 and $53,700. The lowest on record is $501 and the highest $1,320,000.
Since October 4, 2024, 23 listed below. Earlier permits, 49, are on their house pages: 2024: 10 · 2023: 15 · 2022: 6 · 2021: 9 · 2020: 9.
| Issued | Work | Building | Declared value | Contractor as filed | Permit |
|---|---|---|---|---|---|
| Aug 4, 2026 | Bldg-Alter/Repair: SUPPLEMENTAL TO PERMIT# 26016-90000-16792, TO CORRECT WORK DESCRIPTION TO READ "Application of an approved coating to an existing roof. " | Retail | — | — | 26016-30001-16792 |
| Jul 28, 2026 | Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over EXISTING solid sheathing _153_____Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 149 | Storage Building | $214,830 | — | 26016-40000-19217 |
| Jun 25, 2026 | Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 55 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B.Application of an approved coating to an existing roof | Retail Store or Business | $36,850 | — | 26016-90000-16792 |
| May 29, 2026 | Bldg-Alter/Repair: ePlan: Supplemental ref. to permit# 25016-10000-28985 for roof alteration, including revisions to roof building attachment and connections of equipment to roof structure | Telecommunication Transmitter - wireless | $15,000 | — | 25016-10001-28985 |
| May 20, 2026 | Bldg-Alter/Repair: ***Eplan Los Angeles Convention Center***Supplemental to permit # 25010-20000-06362: Revisions to Network Station plans to Accommodate LADWP Requested Revisions To Slab On Grade , Ramps, Steel Beam Size & Details For Trench Covers & Cmu Connection At Top Of Wall/Roof | Storage Building | $120,000 | — | 25010-20002-06362 |
| Jan 19, 2026 | Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 43 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B | Office | $8,600 | — | 26016-90000-01601 |
| Dec 3, 2025 | Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 37 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B | Office | $7,400 | — | 25016-90000-35477 |
| Oct 22, 2025 | Bldg-Alter/Repair: SUPPLEMENTAL TO 22016-10000-00676 TO CHANGE ARCHITECT AND ENGINEER OF RECORD, REPLACING THE EXISTING ROOF STRUCTURE AND THE EXISTING FLOOR SLAB, AND ADDITIONAL ARCHITECTURAL DETAILS. NO CHANGE IN USE | Religious Association | $501 | — | 22016-10001-00676 |
| Oct 17, 2025 | Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 234 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B | Retail Store or Business | $46,800 | — | 25016-90000-31153 |
| Sep 18, 2025 | Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roofing Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B | Retail | $8,000 | — | 25016-20000-28229 |
| Aug 14, 2025 | Bldg-Alter/Repair: Application of an approved coating to an existing roof | Retail | $14,900 | — | 25016-10000-24660 |
| Jun 3, 2025 | Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 40 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B | Restaurant | $8,000 | — | 25016-90000-17925 |
| Jun 3, 2025 | Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over EXISTING solid sheathing __25__Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B | Car Wash | $17,500 | — | 25016-10000-17938 |
| Apr 9, 2025 | Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over EXISTING solid sheathing __35__Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B | Miscellaneous Bldg/Structure | $24,000 | — | 25016-10000-10991 |
| Apr 4, 2025 | Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing_18_Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . Forresidential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by CoolRoof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6,Section 141 2B | Office | $17,000 | — | 25016-10000-10297 |
| Mar 19, 2025 | Bldg-Alter/Repair: TO BUILDING 95 TO REPLACE EXISTING STEAM BOILERS, STRUCTURAL ANCHORAGE AND NEW ROOF OPENINGS TO POWERHOUSE. NO CHANGES TO USE , FLOOR AREA, OR OCCUPANCY | Miscellaneous Bldg/Structure | $45,000 | — | 24016-30000-36486 |
| Feb 11, 2025 | Bldg-Alter/Repair: Add steel grating at bottom chord of roof truss joists to build a mechanical maintenance platform at Technical Product Area above Stage B | Office | $122,145 | — | 24016-30000-36198 |
| Jan 7, 2025 | Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over new solid sheathing 28 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141 2B. "COMPLY WITH DEPARTMENT ORDER effective date05/09/2019. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATE" | Office | $13,000 | — | 25016-10000-00153 |
| Jan 2, 2025 | Bldg-Alter/Repair: Supplemental to Permit # 24016-10000-14913 for revision to structural design. Keep existing concrete columns and beams with their existing foundations at front of building. Use existing concrete beam and columns structure to accommodate new front facade elevation design. Connect all LVL beams running across building to roof diaphragm for additional lateral support | Office | $501 | — | 24016-10001-14913 |
| Dec 31, 2024 | Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 113 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B | Auto Repair Garage | $22,600 | — | 24016-90000-40705 |
| Nov 6, 2024 | Bldg-Alter/Repair: Proposed roof work to include replacement of AC units | Office | $1,320,000 | — | 24016-10000-27446 |
| Oct 23, 2024 | Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over new solid sheathing Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roofing Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B | Retail | $56,000 | — | 24016-20000-33976 |
| Oct 17, 2024 | Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing 170 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2B | Retail | $80,000 | — | 24016-70000-33234 |
Solar: 8 permits
From Feb 27, 2020 to Jul 20, 2026. Fewer than 5 solar permits since October 4, 2024 carry a declared value, so no range is computed; the rows are below.
Since October 4, 2024, 3 listed below. Earlier permits, 5, are on their house pages: 2022: 2 · 2021: 1 · 2020: 2.
| Issued | Work | Building | Declared value | Contractor as filed | Permit |
|---|---|---|---|---|---|
| Jul 20, 2026 | Bldg-Alter/Repair: SUPPLEMENTAL PERMIT TO #22016-20000-01727 TO CHANGE CONTRACTORS FROM "CALIFORNIA SOLAR INTEGRATORS INC" LIC:1004246 TO "INTRUSION PROTECTION SYSTEMS INC" LIC:1111959 | Apartment | — | — | 22016-10001-01727 |
| Mar 24, 2026 | Bldg-Alter/Repair: ePlan. Install 190.205kW of rooftop solar on an existing school | School Building | $450,000 | — | 26016-10000-02161 |
| Apr 4, 2025 | Bldg-Alter/Repair: STRUCTURAL SUPPORT / ANCHORAGE FOR INSTALLATION ROOF MOUNTED SOLAR PHOTOVOLTAIC SYSTEM | Apartment | $51,300 | — | 22016-20000-01727 |
Heating and cooling: 6 permits
From Jan 4, 2021 to Mar 10, 2026. Fewer than 5 heating and cooling permits since October 4, 2024 carry a declared value, so no range is computed; the rows are below.
Since October 4, 2024, 1 listed below. Earlier permits, 5, are on their house pages: 2023: 1 · 2022: 2 · 2021: 2.
| Issued | Work | Building | Declared value | Contractor as filed | Permit |
|---|---|---|---|---|---|
| Mar 10, 2026 | Bldg-Alter/Repair: EXTERIOR ALTERATION TO EXISTING COMMERCIAL BUILDING TO INSTALL Air Handler Unit Condensing Unit and Duct Supports AT ROOF | Motion Picture Studio | $50,000 | — | 25016-10000-37132 |
Electrical: 6 permits
From Aug 20, 2021 to Aug 1, 2025. Fewer than 5 electrical permits since October 4, 2024 carry a declared value, so no range is computed; the rows are below.
Since October 4, 2024, 1 listed below. Earlier permits, 5, are on their house pages: 2023: 1 · 2022: 2 · 2021: 2.
| Issued | Work | Building | Declared value | Contractor as filed | Permit |
|---|---|---|---|---|---|
| Aug 1, 2025 | Bldg-Alter/Repair: ****ZONING APPROVAL ONLY****Accessibility, fire life, safety, structural (foundation, anchorage, inspections are by HCAI/ OSHPD.Scope of work: Installation of a 100kw CHP generator and a microgrid switch board to be in parallel with new main service entrance and to provide backup power upon loss of utility to comply with AB2511 HACAI PIN 74." | Hospital | $501 | — | 25016-10000-17214 |
Plumbing: 5 permits
From Jul 27, 2021 to Jun 23, 2026. Fewer than 5 plumbing permits since October 4, 2024 carry a declared value, so no range is computed; the rows are below.
Since October 4, 2024, 1 listed below. Earlier permits, 4, are on their house pages: 2024: 1 · 2022: 2 · 2021: 1.
| Issued | Work | Building | Declared value | Contractor as filed | Permit |
|---|---|---|---|---|---|
| Jun 23, 2026 | Bldg-Demolition: ePlan: DEMOLITION OF EXISTING SFD AND OFFICE BY HANDWRECK METHOD.SEWER CAP REQUIRE. See Comments** | Dwelling - Single Family | $8,000 | — | 24019-10000-03552 |
Addresses on this street with a page
Source
Los Angeles Department of Building and Safety, via the city open-data portal, pulled nightly. As of October 4, 2026. Storm dates touching this street will appear here once the hail record is attached.