Permits Index
5
Permits, 24 months
13 on record
10
Roofing permits
May 17, 2026
Last permit issued
8
Addresses with a page

Roofing: 10 permits

From Jun 7, 2020 to May 17, 2026. Fewer than 5 roofing permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 2, 2024, 4 listed below. Earlier permits, 6, are on their house pages: 2024: 1 · 2022: 1 · 2021: 1 · 2020: 3.

IssuedWorkBuildingDeclared valueContractor as filedPermit
May 17, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 15 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$3,000—26016-90000-13070
Jan 3, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over new solid sheathing 31 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$9,300—25016-90000-00208
Oct 21, 2024Bldg-Alter/Repair: fee/dept error. Supplemental permit to 24016-20000-33215 to revise work description to read: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roofing Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family——24016-20001-33215
Oct 17, 2024Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over newsolid sheathing Squares. Class A roof covering is required within Very High Fire HazardSeverity Zone . For residential roof replacement > 50% of the total roof area, applyCool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof maybe required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$7,000—24016-20000-33215

Heating and cooling: 3 permits

From May 22, 2020 to Sep 9, 2025. Fewer than 5 heating and cooling permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 2, 2024, 1 listed below. Earlier permits, 2, are on their house pages: 2022: 1 · 2020: 1.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Sep 9, 2025Bldg-Alter/Repair: 1 door . Window and door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council , is required for doors and windows replaced in all residential buildings, three stories or less, per Title 24, Part 6, Section 150.2 1BDwelling - Single Family$501—25016-90000-27139

Addresses on this street with a page

Source

Los Angeles Department of Building and Safety, via the city open-data portal, pulled nightly. As of October 2, 2026. Storm dates touching this street will appear here once the hail record is attached.