44
Permits, 24 months
120 on record
77
Roofing permits
Sep 16, 2026
Last permit issued
101
Addresses with a page

Roofing: 77 permits

From Jan 29, 2020 to Sep 16, 2026. Across 25 roofing permits since October 4, 2024, most declared values run from $2,320 to $130,000 (the middle 80%); the median is $8,500 and half fall between $3,880 and $35,000. The lowest on record is $501 and the highest $300,000.

Since October 4, 2024, 25 listed below. Earlier permits, 52, are on their house pages: 2024: 5 · 2023: 18 · 2022: 11 · 2021: 14 · 2020: 4.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Sep 16, 2026Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing__26____Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone .For residential roof replacement>50% of the total roof area, apply Cool Roof Product labeled and certified byCool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part6, Section 141 2BApartment$18,000—26016-10000-25143
Sep 15, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft.over existing solid sheathing _45_Squares. Class A roof covering is required withinVery High Fire Hazard Severity Zone . For residential roof replacement >50% of the total roof area, apply Cool Roof Product labeled and certified by Cool RoofRating Council . Cool Roof may be required for non-residential buildings perTitle 24, Part 6, Section 141.0 2BCondo-Single Family$8,500—26016-30000-24996
Sep 4, 2026Bldg-Alter/Repair: Mechanical roof equipment anchorage deferred submittal supplemental to permit #22010-10002-05268.This deferred submittal compiles all mechanical phase 2 roof equipment anchorage details and calculationsMiscellaneous Bldg/Structure$501—22010-10018-05268
Aug 3, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing ___4___Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BGarage - Private$4,000—26016-20000-20321
Jun 15, 2026Bldg-Alter/Repair: Supplemental to permit number : 22010-10000-01364 Deferred submittalScope: Provide and install Exterior building maintenance equipment @roofApartment$35,000—26016-10000-14443
May 20, 2026Bldg-Alter/Repair: Partial repair of roof trusses and exterior walls of a commercial building damaged by fireGarage - Private$100,000—26016-10000-02017
Mar 27, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 62 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BApartment$12,400—26016-90000-08262
Mar 17, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 20 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BOffice$4,000—26016-90000-07241
Mar 10, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 21 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BOffice$4,200—26016-90000-06449
Feb 23, 2026Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing ___95__Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section141.0 2BRetail$76,000—25016-10000-37911
Dec 15, 2025Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing __14__Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BOffice$16,350—25016-10000-36612
Nov 18, 2025Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing __35____Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement>50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part6, Section 141 2BApartment$7,000—25016-30000-34100
Nov 6, 2025Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing 90 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BMiscellaneous Bldg/Structure$39,000—25016-10000-33128
Sep 22, 2025Bldg-Alter/Repair: Re-roof with class A or B roof covering material weighting less than 6 lbs per sq. ft over existing solid sheathing squares. class A roof covering is required within very high fire hazard severity zone . Cool roof may be required for non-residential buildings per title 24, part b, section 141 2BCommunity Center operated by governmental agency$150,000—25016-30000-10751
Sep 5, 2025Bldg-Alter/Repair: ePlan: Structural repairs to existing autorepair garage due to vehicle impact damage. Repair portion of exterior wall. Repair roof beams and columns."Comply with department order. Permit to expire 30 days from issuance date."Office$8,200—25016-10000-14776
Jun 12, 2025Bldg-Alter/Repair: eplan: interior Alteration for an existing retail unit to change floor lay out and add new partions. exterior alteration to add new mechanical equipment on the roofRetail$250,000—23016-10000-13925
Jun 4, 2025Bldg-Alter/Repair: Application of an approved coating to an existing roofCondominium$3,880—25016-90000-17992
May 21, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 4 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BRetail Store or Business$800—25016-90000-16704
Apr 23, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 16 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BBeauty Shop or Parlor$3,200—25016-90000-12866
Apr 21, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over new solid sheathing Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roofing Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BMiscellaneous Bldg/Structure$35,000—25016-20000-12437
Mar 6, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 13 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$2,600—25016-90000-06242
Mar 6, 2025Bldg-Alter/Repair: EPLAN CHANGE OF USE 1ST FLOOR FROM RETAIL/MEDICAL OFFICE TO VETERINARY CLINIC NEW FIRST FLOOR TI FOR NEW VETERINARY CLINIC ; WITH 111 SF ENCLOSE UNDER EXISTING ROOF LINE AT STORE FRONT; NEW ASPHALT SHINGLE ROOF; NEW EXTERIOR FACADE AND WINDOW UPGRADES; NEW STAIRS AND LANDING; NO CHANGE TO PARKINGVeterinary Clinic$300,000—24016-10000-13475
Jan 2, 2025Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 50 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BCommercial$10,000—25016-90000-00006
Dec 6, 2024Bldg-Alter/Repair: Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 11 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDuplex$2,200—24016-90000-38620
Oct 16, 2024Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing _8_Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141 2BApartment$2,500—24016-30000-33025

Heating and cooling: 28 permits

From Sep 29, 2021 to Sep 14, 2026. Across 13 heating and cooling permits since October 4, 2024, most declared values run from $501 to $9,900 (the middle 80%); the median is $2,501 and half fall between $501 and $3,446. The lowest on record is $501 and the highest $11,500.

Since October 4, 2024, 13 listed below. Earlier permits, 15, are on their house pages: 2023: 6 · 2022: 6 · 2021: 3.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Sep 14, 2026Bldg-Alter/Repair: ePlan. Deferred submittal - Supplemental permit to # 22010-10000-05268 for changes to the approved Level 1 through 3 Duct Seismic bracing (under permit # 22010-10012-05268). Changes to the level 1 duct: - Transverse bracing added to LADWP ductwork in L1 zone D3. - Updated seismic locations on kitchen exhaust ductwork in zones E2 & E3Office$2,501—22010-10019-05268
Sep 9, 2026Bldg-Alter/Repair: ePlan. Supplemental permit to # 22010-10000-05268 for Phase 2 Level 3 thru 5 Mechanical HVAC Pipe Seismic deferred submittalOffice$2,501—22010-10020-05268
Aug 24, 2026Bldg-Alter/Repair: ePlan. Deferred submittal supplemental to permit # 22010-10002-05268 for changes to seismic bracing of duct risersOffice$2,501—22010-10014-05268
Aug 21, 2026Bldg-Alter/Repair: Supplemental permit to permit no. 22010-10013-05268 to capture changes: A portion of the roof duct will be raised in elevation to allow another trade to perform waterproofing scope on the roof deck. See detail #2/SBM 3.1 for updated duct elevations. The updated detail and corresponding shop drawing locations have been clouded in red for review. All other seismic details and calculations are approved in Plan Check Submittal # 22010-10013-05268Miscellaneous Bldg/Structure$501—22010-10015-05268
Jun 11, 2026Bldg-Alter/Repair: 2- Window change-out (same size & type) for residential buildings. Dual glazing, labeled and certified byNational Fenestration Rating Council , is required for doors and windows replaced in all residentialbuildings, three stories or less, per Section 150.2 1B of Title 24Condo-Multi Family$3,446—26016-10000-15514
Jun 4, 2026Bldg-Alter/Repair: Deferred approval for Roof Duct and Pipe Seismic Supports supplemental to permit # 22010-10000-05268Miscellaneous Bldg/Structure$501—22010-10013-05268
May 7, 2026Bldg-Alter/Repair: ePlan. Supplemental permit to # 22010-10002-05268 for seismic bracing of ducts and pipe risers deferred submittalOffice$501—22010-10011-05268
Apr 22, 2026Bldg-Alter/Repair: ePlan. Supplemental permit to # 22010-10002-05268 for phase 2 Levels 1 through 3 ducts seismic bracing deferred submittalOffice$2,501—22010-10012-05268
Nov 11, 2025Bldg-Alter/Repair: Add new structural rooftop equipment platform for new HVACMiscellaneous Bldg/Structure$501—24016-10002-13797
Sep 23, 2025Bldg-Alter/Repair: Window change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council , is required for doors and windows replaced in all residential buildings, three stories or less, per Section 150.2 1B of Title 24Apartment$9,500—25016-10000-21729
Jun 18, 2025Bldg-Alter/Repair: Window change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council , is required for doors and windows replaced in all residential buildings, three stories or less, per Section 150.2 1B of Title 24Apartment$10,000—25016-10000-19491
Dec 3, 2024Bldg-Alter/Repair: 11 window . Window and door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council , is required for doors and windows replaced in all residential buildings, three stories or less, per Title 24, Part 6, Section 150.2 1BDuplex$2,750—24016-90000-38126
Nov 20, 2024Bldg-Alter/Repair: 3 bathroom .Bathroom remodel for residential buildings .6 door . Window and door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council , is required for doors and windows replaced in all residential buildings, three stories or less, per Title 24, Part 6, Section 150.2 1B.Kitchen remodel for residential buildingsDuplex$11,500—24016-90000-37064

Plumbing: 7 permits

From Feb 28, 2020 to Aug 26, 2025. Fewer than 5 plumbing permits since October 4, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 4, 2024, 1 listed below. Earlier permits, 6, are on their house pages: 2021: 1 · 2020: 5.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Aug 26, 2025Bldg-Alter/Repair: Eplan. Ground-floor commercial tenant improvement and change of use from retail to retail and cafe . Scope includes the installation of new non-load-bearing partitions, interior doors, and openings, replacement, and/or adjustment of existing fire-rated doors. Work also includes the construction of new non-rated suspended ceilings and soffits, installation of fixed millwork, new flooring, and ceiling finishes. New plumbing fixtures, appliances, and equipment. Existing fire sprinkler system will be modified as required, and new fire-life safety devices will be installed. No exterior improvements, no added square footage, andRetail$179,550—25016-10000-03928

Solar: 6 permits

From Jan 10, 2020 to Dec 29, 2025. Fewer than 5 solar permits since October 4, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 4, 2024, 4 listed below. Earlier permits, 2, are on their house pages: 2020: 2.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Dec 29, 2025Bldg-Alter/Repair: ePlan. T-Mobile proposes to modify the existing rooftop wireless facility. Scope of work includes:-Remove 7 panel antennas and add 3 panel antennas on existing mounts. Final count of 3 antennas.-Keep 3 RRU radios, remove 3 RRU radios, and add 3 RRU radios. Final count of 6 RRUs.-Remove 6 DC power cables and 3 hybrid cables. Add 2 hybrid cables. Final count of 2 cables.-Remove 1 RBS equipment cabinet on rooftop screened platform. Add 1 equipment cabinet and 1 battery cabinet. Final count of 2 cabinetsTelecommunication Transmitter - wireless$5,400—25016-10000-27020
Jul 1, 2025Bldg-Alter/Repair: ePlan. Supplemental permit to # 22010-10000-05268 to include minor revisions to add vestibule to the battery storage roomOffice$20,000—22010-10002-05268
Jun 19, 2025Bldg-Alter/Repair: Install PV System at the Roof of a Commercial BldgStorage Building$66,256—23016-10000-25929
Jun 2, 2025Bldg-Alter/Repair: Review of rooftop photovoltaic system use of ballast roof mounting 97 kwSchool Building$60,000—25016-30000-13498

Electrical: 2 permits

From Sep 9, 2020 to Apr 17, 2026. Fewer than 5 electrical permits since October 4, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 4, 2024, 1 listed below. Earlier permits, 1, are on their house pages: 2020: 1.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Apr 17, 2026Nonbldg-Alter/Repair: Re-plaster existing swimming pool (a separate express mechanical permit for new skimmer and a separate express electrical permit for new pool luminaire is required, when applicable, except for one and two-family dwellings). The subject pool shall comply with the Swimming Pool safety act, according to Health and Safety Code 115920-115929 through Senate Bill 552Pool/Spa - Private$4,000—26026-20000-00057

Addresses on this street with a page

Source

Los Angeles Department of Building and Safety, via the city open-data portal, pulled nightly. As of October 4, 2026. Storm dates touching this street will appear here once the hail record is attached.