Permits Index
4
Permits, 24 months
12 on record
10
Roofing permits
Mar 18, 2026
Last permit issued
10
Addresses with a page

Roofing: 10 permits

From Apr 15, 2020 to Mar 18, 2026. Fewer than 5 roofing permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 2, 2024, 4 listed below. Earlier permits, 6, are on their house pages: 2024: 3 · 2023: 2 · 2020: 1.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Mar 18, 2026Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing 30 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 2BDwelling - Single Family$18,000—26016-10000-05792
Jul 31, 2025Bldg-Alter/Repair: Remove existing roof tiles, apply new underlayment and reset roof tilesDwelling - Single Family$30,000—25016-20000-22483
Jun 11, 2025Bldg-Alter/Repair: Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over new solid sheathing_15_Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone . For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council . Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141 2BDwelling - Single Family$3,000—25016-10000-18277
Apr 1, 2025Bldg-Alter/Repair: Remove existing roof tiles, apply new underlayment and reset roof tilesDwelling - Single Family$9,500—25016-20000-09171

Heating and cooling: 2 permits

From Apr 25, 2022 to Sep 6, 2022. Fewer than 5 heating and cooling permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 2, 2024, 0 listed below. Earlier permits, 2, are on their house pages: 2022: 2.

IssuedWorkBuildingDeclared valueContractor as filedPermit

Addresses on this street with a page

Source

Los Angeles Department of Building and Safety, via the city open-data portal, pulled nightly. As of October 2, 2026. Storm dates touching this street will appear here once the hail record is attached.