Permits Index

Home-service permits on record at this address

IssuedWorkTradeDeclared valueContractor as filedStatusPermit
Sep 18, 2024Bldg-Alter/Repair: **LAX**Deferred Submittal/Supplemental Permit to Permit #22016-10000-28938 for two catwalk platforms to access AHUs at the Level 5 Roof. Scope includes W8x10 & C8x11.5 framing with HSS 4x0.313 posts, metal bar grating , HSS 1 1/2" diameter tube handrails, and access ladders with C8x11.5 stringers and metal bar grating treads. Existing roof framing and AHU framing is per the base permit #22016-10000-28938. PVC insulation and AHU equipment is by othersRoofing$501—Finaled Nov 20, 202422016-10002-28938
May 6, 2024Bldg-Alter/Repair: **LAX**Deferred submittal for permit number 22016-10000-28938 : Cold metal framing at the roof , framing low curb at mechanical penetrations, Framing an exterior soffit dropRoofing$501—Finaled Nov 14, 202422016-10003-28938
Apr 18, 2024Bldg-Alter/Repair: **LAX**Project Under Construction** Deferred Submittal to Permit #22016-10000-28938 for the Jib Crane Anchorage only at the Level 03 Roof. Jib crane and support framing for the jib craneRoofing$501—Finaled Nov 20, 202422016-10001-28938
Jan 18, 2024Bldg-Alter/Repair: **LAX PROJECT**THE TERMINAL 5 CTX RECAPITALIZATION PROJECT INCLUDES IMPROVEMENTS TO THE BHS SYSTEM CONSISTING OF REPLACEMENT OF 4 EDS MACHINES, ADDITION/RECONFIGURATION OF THE BHS LINES FOR EDS LOAD BALANCING, HVAC FOR BHS CBIS SPACEHeating and cooling$3,065,124—Finaled Mar 19, 202522016-10000-28938
Sep 28, 2023Bldg-Alter/Repair: **LAX** Structural support details for electrical busway routingElectrical$1,280,000—Finaled Jan 21, 202523016-10000-29288
Oct 27, 2022Bldg-Alter/Repair: **LAX-LAMP Project**Plumbing Pipe Hanger supports for new plumbing pipe in Terminal 5Plumbing$35,000—Finaled Dec 9, 202422016-10000-21282
Feb 21, 2020Bldg-Alter/Repair: SUPPLEMENTAL PERMIT TO 18014-10000-04184. REVISE STRUCTURAL DUE TO FIELD CONDITIONS: ADD NEW FOOTING; ADD STEEL HAUNCH TO AVOID DUCT WORKHeating and cooling$501—Finaled Nov 1, 202018014-10006-04184
Jan 10, 2020Bldg-Alter/Repair: THE PROJECT CONSISTS OF FINALIZING THE TERMINAL 5 MOAT LEVEL AA EMPLOYEE LEASE SPACE, WHICH IS APPROXIMATELY 8625 SF.THE SPACE WILL BE REDESIGNED AND RECONFIGURED TO MEET THE CURRENT AA EMPLOYEE SPACE STANDARDS, WHILE MODIFYING THE HVAC AND ELECTRICAL SYSTEMS TO ACCOMODATE THE AMERICAN AIRLINE DEPARTMEN REQUIREMENTSHeating and cooling$1,638,750—Finaled Mar 4, 202019016-10000-03465

On World Way

198 permits on record on World Way.

TradePermitsSince Oct 4, 2024Median declaredRangeLast
Roofing3711$501$501–$501Nov 13, 2025
Electrical7124$501$501–$35,500Sep 15, 2026
Heating and cooling618$12,500$501–$6,887,200Jun 18, 2026
Plumbing290—under 5May 13, 2024

Roof replacement cost in Los Angeles

Across 20,614 one- and two-family reroof permits since October 4, 2024, most declared values run from $2,000 to $13,000 (the middle 80%); the median is $5,200 and half fall between $3,600 and $7,800. The lowest on record is $19 and the highest $570,000. Every permit behind that range.

Furnace, heat pump or air conditioner replacement cost in Los Angeles

Across 5,315 one- and two-family heating and cooling permits since October 4, 2024, most declared values run from $501 to $39,031 (the middle 80%); the median is $4,251 and half fall between $1,250 and $15,000. The lowest on record is $1 and the highest $1,800,000. Every permit behind that range.

Source

Los Angeles Department of Building and Safety, via the city open-data portal, pulled nightly; the assessor roll for the property fields. As of October 4, 2026. Owner names are not shown on any page.