Permits Index
5
Permits, 24 months
97 on record
18
Roofing permits
Aug 13, 2026
Last permit issued
16
Addresses with a page

Roofing: 18 permits

From Sep 29, 2015 to Jun 12, 2019. Fewer than 5 roofing permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 2, 2024, 0 listed below. Earlier permits, 18, are on their house pages: 2019: 5 · 2018: 3 · 2017: 3 · 2016: 6 · 2015: 1.

IssuedWorkBuildingDeclared valueContractor as filedPermit

Plumbing: 31 permits

From Jan 16, 2015 to Jul 29, 2026. Fewer than 5 plumbing permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 2, 2024, 2 listed below. Earlier permits, 29, are on their house pages: 2024: 2 · 2023: 2 · 2022: 1 · 2021: 1 · 2020: 2 · 2019: 2 · 2018: 11 · 2017: 3 · 2015: 5.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Jul 29, 2026otc alterations permit: unit #2602: kitchen remodel- replace cabinets, countertop, interior painting. 2 bathrooms remodel- replace electrical and plumbing fixture and replace tile. interior painting for unit. no wall relocation. new lighting shall comply with cec 150.0 3 and 5apartments$90,000—202607295725
Oct 9, 2025otc alterations permit: primary bathroom remodel in-kind no structural changes. new plumbing fixtures, 1 shower pan, install one light. guest bathroom: retiel the shower and 1 shower panapartments$45,000—202510097040

Heating and cooling: 31 permits

From Jan 16, 2015 to Aug 12, 2025. Fewer than 5 heating and cooling permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 2, 2024, 1 listed below. Earlier permits, 30, are on their house pages: 2024: 2 · 2023: 1 · 2020: 6 · 2019: 4 · 2018: 9 · 2017: 4 · 2016: 2 · 2015: 2.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Aug 12, 2025otc alterations permit: project consists of the replacement of 1 chiller, chilled waterpump and condenser water pump in the basement. mechanical and electrical capacity will match the existing equipment. weight of the new equipmet are equal or less in weight than the existing equipmentoffice$856,000—202507211251

Electrical: 16 permits

From Oct 15, 2015 to Aug 13, 2026. Fewer than 5 electrical permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 2, 2024, 2 listed below. Earlier permits, 14, are on their house pages: 2024: 1 · 2022: 1 · 2021: 1 · 2019: 2 · 2018: 2 · 2017: 2 · 2016: 3 · 2015: 2.

IssuedWorkBuildingDeclared valueContractor as filedPermit
Aug 13, 2026otc alterations permit: replace bathtub tile, bath vanity, vanity light, kitchen counter tops. all in kind, like for like. install 2 new electrical boxes for pendent lights at kitchen sink area. compliance w/ chapter 1134aapartments$8,800—202608136511
Mar 11, 2026sign - erect: errect 2 single face electric wall signs . same size front and backoffice$5,000—202603117363

Water heater: 1 permit

From Feb 7, 2018 to Feb 7, 2018. Fewer than 5 water heater permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.

Since October 2, 2024, 0 listed below. Earlier permits, 1, are on their house pages: 2018: 1.

IssuedWorkBuildingDeclared valueContractor as filedPermit

Addresses on this street with a page

Source

San Francisco Department of Building Inspection, via DataSF, pulled nightly. As of October 2, 2026. Storm dates touching this street will appear here once the hail record is attached.