222 02nd St, San Francisco
66 home-service permits on record at 222 02nd St, San Francisco; the roof was last permitted on Apr 28, 2016 at a declared value of $29,000.
Home-service permits on record at this address
| Issued | Work | Trade | Declared value | Contractor as filed | Status | Permit |
|---|---|---|---|---|---|---|
| Jul 14, 2026 | otc alterations permit: 22nd fl: removal of elevator lobby doors on floor 22. replace with new doors with card reader. ada restroom upgrade. no new or change plumbing fixtures | Plumbing | $20,500 | — | issued | 202606163276 |
| Jul 13, 2026 | otc alterations permit: 21st fl: removal of elevator lobby doors on floor 21. replace with new doors with card reader. ada restroom upgrade. no new or change plumbing fixtures | Plumbing | $32,600 | — | issued | 202606163275 |
| Sep 25, 2025 | otc alterations permit: new non-load bearing interior furred walls. ceiling modification and new floor finish. electrical modification to support new recording studio. ref pa 202404240675 | Electrical | $150,000 | — | Finaled Jan 15, 2026 | 202508273974 |
| May 27, 2025 | additions alterations or repairs: 13/f: fire alarm ti, adding 9 dual pt relay/ monitor modules, 6 relay modules, 1 duct detector, 14 smoke detectors and 42 speaker-strobes to existing nfs2-3030 fire alarm system | Heating and cooling | $62,123 | — | Finaled Jul 21, 2025 | 202504285321 |
| Jan 9, 2025 | otc alterations permit: 13/f: demo existing armovers and return existing fire sprinkler system to core and shall conditions. 13th floor:changeout 88 fire sprinklers per t.i. demo job #24-730 | Heating and cooling | $54,656 | — | Finaled Feb 19, 2025 | 202501098059 |
| Nov 8, 2024 | otc alterations permit: 3rd fl- ref pa #2024-1002-2207 fire alarm ti: adding duct detector to notifier nfs2-3030 fire alarm system | Heating and cooling | $3,280 | — | Finaled Dec 11, 2024 | 202411084648 |
| Jun 28, 2024 | otc alterations permit: addition of supplemental water source heat pump, upsized vav box. work to include duct work, piping, controls, commissioning and air balance. electrical work included | Heating and cooling | $75,000 | — | Finaled Aug 30, 2024 | 202406285475 |
| Apr 30, 2024 | otc alterations permit: 3rd fl - removal of elevator lobby doors; replace with doors with card readers. 20% ada restroom upgrades. new new plumbing fixtures | Plumbing | $50,000 | — | Finaled Jul 15, 2024 | 202404240677 |
| Apr 30, 2024 | otc alterations permit: 14thj fl - removal of elevator lobby doors with card reader; existing restrooms and all gender restroom on the 14th fl will be upgraded to full compliance. no new plumbing fixtures | Plumbing | $50,000 | — | Finaled Jul 15, 2024 | 202404240675 |
| Nov 22, 2023 | otc alterations permit: 4th, 5th and 9th - minor ti demo non load bearing partitions to combine 2 rooms in room at locations. construction of new finishes. mechanical & electrical for total rooms under separate permit | Electrical | $156,200 | — | Finaled Mar 25, 2024 | 202311221285 |
| Aug 18, 2021 | otc alterations permit: 5th floor: add , relocate , per ti, 9th floor add relocate , per ti, 13th floor add 3 relocate changeout 1 per ti, ref pa 202106182800 job# 21-650 | Heating and cooling | $9,000 | — | Finaled Oct 1, 2021 | 202108176604 |
| Nov 4, 2020 | otc alterations permit: floor #26: partial ti with new lighting, electrical, painting, & structural support for owner provided artwork. no new partitions or mech/plumbing scope. structural scope limited to support of artwork | Plumbing | $120,000 | — | Finaled Feb 16, 2023 | 202008282900 |
| Sep 18, 2020 | otc alterations permit: floor #2: retrofitting existing doors at fire fighter vestibule & water heater room with card readers & corresponding hardware. floors #3 - #18: retrofitting existing doors at fire fighter vestibule with new card reader & corresponding hardware. maher n/a | Water heater | $25,000 | — | Finaled Feb 16, 2021 | 202008282898 |
| Feb 19, 2020 | otc alterations permit: fire alarm ti add 1 duct detector 1 relay module and 5 speaker strobes to e notifier nfs2 3030 fire alarm system ref 201911076724 maher not req | Heating and cooling | $7,322 | — | Finaled Dec 14, 2020 | 202002194845 |
| Dec 4, 2019 | otc alterations permit: 26th floor: fire alarm t.i. resubmitting fa permit #201910164648, adding 5 speaker strobes, 1 duct detector with relay and deleting 2 smoke detectors from extg notifier nfs2-3030 fire alarm system. ref. arch app#201909030453 | Heating and cooling | $2,500 | — | Finaled Feb 1, 2020 | 201912048646 |
| Nov 26, 2019 | otc alterations permit: fire alarm ti add 1 duct detector, 1 dual paint monitor module and delay module to e notifier nfs2-3030 fire alarm system | Heating and cooling | $2,500 | — | Finaled Feb 1, 2020 | 201911268249 |
| Nov 25, 2019 | otc alterations permit: fire alarm ti: adding 1 duct detector, 1 duct point monitor module and 1 relay module to existing notifer nfs2-3030 fire alarm system | Heating and cooling | $2,500 | — | Finaled Feb 1, 2020 | 201911258130 |
| Nov 22, 2019 | otc alterations permit: 24/f: partial t.i. for new video production studio; new raised floor system, partitions, ceiling lighting, finishes, plumbing & mecahnical; structural includes lighting grid support, floor system & accoustical glazing | Plumbing | $1,500,000 | — | Finaled Feb 11, 2021 | 201911076724 |
| Nov 8, 2019 | otc alterations permit: fire alarm ti 24th fl: adding 27 speaker strobes, 1 smoke detector, 1 duct detector,2 relay modules, and 1 dual point monitor module to existing notifier nfs2-3030 fa system. ref arch #201906264413.and 1 duct detector | Heating and cooling | $11,724 | — | Finaled Nov 25, 2019 | 201911056497 |
| Jul 19, 2019 | otc alterations permit: 26th flr. partial floor t.i w/ partions, ceilings, finishes, millwork, furniture, lighting, plumbing, mechanical and electrical incl employee cafeteria w/ limited prep w/ mostly pre-packaged food. some prep such as loose dry goods, perishable packaged goods, self-serve drinks | Plumbing | $1,500,000 | — | Finaled Feb 16, 2023 | 201906264415 |
| Jul 19, 2019 | otc alterations permit: 24th flr. partial floor t.i w/ partions, ceilings, finishes, millwork, furniture, lighting, plumbing, mechanical and electrical incl employee cafeteria w/ limited prep w/ mostly pre-packaged food. some prep such as loose dry goods, perishable packaged goods, self-serve drinks | Plumbing | $1,500,000 | — | issued | 201906264413 |
| Jun 19, 2019 | otc alterations permit: 25/f: full floor ti w/new partitions, ceilings, finishes, illwork, furniture, lighting, plumbing, mechanical, electrical including employee cafeteria w/ltd prep | Plumbing | $1,500,000 | — | Finaled Jan 21, 2020 | 201904178182 |
| Jun 19, 2019 | otc alterations permit: 23/f: full floor ti w/new partitions, ceiling, finishes, millwork, furniture, lighting, plumbing, mech, & elec including employee cafeteria w/limited prep/mostly pre-packaged food, some prep such as loose dry goods, packaged good and/or expanded beverage services (drinks & espresso). maher na | Plumbing | $1,500,000 | — | Finaled Jan 21, 2020 | 201904178180 |
| Jun 7, 2019 | otc alterations permit: 3rd fl - partial demo of plumbing, case and rated soffit of single tenant bldg to provide new elevator stop . new furring partitions and soffit to finish new opening. plumbing lines and other infrastructure located inside chase to be reworked | Plumbing | $50,000 | — | issued | 201903276337 |
| Jan 10, 2019 | otc alterations permit: 1st fl. fire alarm speaker/strobes; duct detectors; addressable control relay for audio system shunt | Heating and cooling | $8,000 | — | issued | 201901100030 |
| Dec 19, 2018 | otc alterations permit: 1st floor: installation of wshp to serve small retail space. will tie into cw lines will run duct to serve space, will install ef to serve bathroom fsd's will be added to maintain raiting of spaces, booster pump will be added to help with pump head base | Heating and cooling | $20,000 | — | Finaled Jul 12, 2019 | 201812198704 |
| Sep 18, 2018 | otc alterations permit: 22/f:fire alarm tenant improvement to existing notifier nfs2-3030. add 34 speaker strobes, 1 strobe, 1 duct smoke detector with internal relay. dual module for fsd position stations, 1 remodte led for duct detector. pa #201804237080 | Heating and cooling | $15,032 | — | Finaled Dec 14, 2018 | 201809170420 |
| Sep 18, 2018 | otc alterations permit: 20/f:fire alarm ti existin notifier nfs2-3030. add 30 speaker strobes, 4 speakers, 1 duct smoke detectorwith internal relay, 1 dual monitoring module for fsd position sations and 1 remote led for duct detector. pa201804237079 | Heating and cooling | $14,912 | — | Finaled Dec 14, 2018 | 201809170418 |
| Sep 18, 2018 | otc alterations permit: 21/f: fire alarm ti to e notifier nfs2-3030. add 35 speaker strobes, 1 duct smoke detecord with internal relay, 1 dual monitor module for fsd position status and 1 remote led for duct detector. ref pa201804237078 | Heating and cooling | $15,092 | — | Finaled Dec 14, 2018 | 201809170410 |
| Sep 18, 2018 | otc alterations permit: ref pa# 201804237077; fire alarm t.i. to an notifier nfs2-3030, adding speaker strobes, strobes, duct smoke detector with internal relay, dual monitorning module for fsd positin stations and 1 remote led for duct detector | Heating and cooling | $14,812 | — | Finaled Dec 14, 2018 | 201809140319 |
| Jul 10, 2018 | otc alterations permit: 9/f: partial floor tenant improvement to include new conference, doors & hardware partitions finishes, millwork mechanical electrical & plumbing including life safety under seperate permit | Plumbing | $125,000 | — | issued | 201806010758 |
| Jul 10, 2018 | otc alterations permit: 6 floors - partial floor ti - selective demo, new partitions, electrical, ceilings, doors, finishes. sprinklers and fire alarm, mech sep permit | Electrical | $50,000 | — | issued | 201804176540 |
| Jun 4, 2018 | otc alterations permit: 21st flr - revision to 201605026270 to revise originally approved layout. mechanical and electrical included | Electrical | $75,000 | — | issued | 201804237078 |
| Aug 2, 2016 | otc alterations permit: 21st floor -full floor t.i. including partitions, ceilings, finishes, millwork, furniture, lighting, fixtures, plumbing, mechanical & electrical. ref #200711309386 for new construction. n/a maher ordinance | Plumbing | $1,250,000 | — | issued | 201605026270 |
| Aug 2, 2016 | otc alterations permit: 22nd floor - full floor t.i. including partitions, ceilings, finishes, millwork, furniture, lighting fixtures, plumbing, mechanical & electrical. ref #200711309386 for new construction. n/a maher ordinance | Plumbing | $1,250,000 | — | issued | 201605026264 |
| Apr 28, 2016 | otc alterations permit: build sound barrier on 5th floor roof around exhaust of p.c.u. and mechanical equipment | Roofing | $29,000 | — | Finaled Aug 12, 2016 | 201604064059 |
| Mar 31, 2016 | otc alterations permit: 18th flr: fire alarm add 35 speaker/strobes, one duct detector with relay and one monitoring module on the 18th flr, ref. bldg 201601136958; maher n/a | Heating and cooling | $21,000 | — | Finaled Jun 8, 2016 | 201603313543 |
| Mar 31, 2016 | otc alterations permit: fire alarm add 47 speaker.strobes, 1 duct detector, 1 smoke detector and 2 relays & 1 monitoring module due to a ti on the 15th floor. ref pa 2016-0113-6951. maher na | Heating and cooling | $30,000 | — | Finaled Jun 8, 2016 | 201603303446 |
| Mar 31, 2016 | otc alterations permit: fire alarm add 40 speaker.strobes, 1 duct detector with relay, 1 smoke detector and 1 monitoring module as part of ti on the 16th floor. ref pa 2016-0114-7158 | Heating and cooling | $26,000 | — | Finaled Jun 8, 2016 | 201603303445 |
| Mar 11, 2016 | otc alterations permit: 17th flr: fire alarm: add 1 power supply, 4 smoke detectors, 1 duct detector, 3 monitoring modules & 34 speaker/strobes as part of a ti ref pa 2015 0909 6488 maher na | Heating and cooling | $27,900 | — | Finaled Sep 21, 2016 | 201603111808 |
| Mar 3, 2016 | otc alterations permit: 2nd flr: revision to 2015 0818 4604 - mechanical ducts per inspector | Heating and cooling | $1 | — | Finaled Aug 2, 2016 | 201603031105 |
| Mar 3, 2016 | additions alterations or repairs: 17th floor: full floor leed comm. t.i. for office, food serving and dining facilities consisting of partitions, ceilings, lighting fixutres, mechanical, electrical and plumbing. n/a for maher | Plumbing | $2,000,000 | — | Finaled Sep 2, 2016 | 201509096488 |
| Feb 18, 2016 | additions alterations or repairs: work on 1st-4th fl. fire alarm, add 26 smoke detectors, 11 duct detectors, 94 speaker/strobes, 3 strobes, 1 speaker, 1 beam detector, 10 monitoring modules & 1 power supply to the sysem due to a tenant improvement. ref bldg permits 201508184605,201508184604,201508184602,201506179153 | Heating and cooling | $80,000 | — | Finaled Jun 25, 2016 | 201602179779 |
| Feb 12, 2016 | otc alterations permit: vertical exhaust riser shaft only from floors 1-26. selective demo on slab openings, rated assembly. 850 sq ft. includes duct riser & fsd toilet exhaust riser. n/a for maher | Heating and cooling | $48,000 | — | Finaled Aug 2, 2016 | 201510099317 |
| Jan 25, 2016 | otc alterations permit: pcu exhaust riser shaft terminates of floor 5 roof. 250 sq ft project area. n/a maher | Roofing | $40,000 | — | Finaled Jul 29, 2016 | 201510099314 |
| Jan 15, 2016 | otc alterations permit: 14th fl: fire alarm add 42 speaker/strobes, 6 duct detectors with relays. 1 monitoring module & 2 smoke detectors. ref pa 2015-0826-5350 | Heating and cooling | $30,000 | — | Finaled Apr 14, 2016 | 201601157225 |
| Jan 5, 2016 | otc alterations permit: adding 1 power supply, 62 speaker strobes, 1 speaker, 1 duct detector with relay, 1 dual monitoring mdoule and 1 smoke detector to notifier nfs2-3030 as part of t.i. on 13/f. t.i. pa#201508265351. n/a ordinance #155-13 | Heating and cooling | $32,000 | — | Finaled Apr 7, 2016 | 201601046302 |
| Jan 5, 2016 | additions alterations or repairs: 3rd flr: t.i. for kitchen, dining and restroom facilities consisting of: partitions, ceilings, lighting fixtures, mechanical, electrical & plumbing, maher n/a | Plumbing | $2,500,000 | — | Finaled Sep 2, 2016 | 201508184602 |
| Dec 18, 2015 | additions alterations or repairs: 2nd flr: commercial t.i. including partitions, ceilings, finishes, plumbing, mechanical, electrical & structural; maher n/a | Plumbing | $2,500,000 | — | Finaled Jul 27, 2016 | 201508184604 |
| Oct 13, 2015 | otc alterations permit: 6/f- fire only permit, add 48 speaker/strobes, 2 strobes, 7 duct detectors with relays and one monitoring module as part of a t.i. t.i. pa#201506179204, new bldg.# 200711309386. n/a ordinance #155-13 | Heating and cooling | $34,000 | — | Finaled Mar 14, 2016 | 201509258072 |
| Oct 9, 2015 | otc alterations permit: 4th flr: fire alarm add 51 speaker/strobes,4 speakers,2 duct detectors & 2 monitoring modules as part of a tenant improvement on the 4th flr, ref. 201506179153; maher n/a | Heating and cooling | $32,000 | — | Finaled Mar 15, 2016 | 201510099351 |
| Oct 2, 2015 | otc alterations permit: 13th floor: ti - including partitions, ceiling, lighting, fictures, mechanical, plumbing electrical.maher na | Plumbing | $2,500,000 | — | Finaled Aug 10, 2016 | 201508265351 |
| Oct 2, 2015 | otc alterations permit: 14th floor: ti - including partitions, ceiling, lighting, fictures, mechanical, plumbing electrical.maher na | Plumbing | $2,500,000 | — | Finaled Sep 2, 2016 | 201508265350 |
| Sep 16, 2015 | otc alterations permit: 5th floor: fire only permit. add 49 speaker/strobes, 1 speaker, 3 strobes, 1 duct detector and 1 monitoring module as part of a remodel. ref app#201504267078. n/a for maher | Heating and cooling | $27,100 | — | Finaled Mar 14, 2016 | 201509167103 |
| Sep 15, 2015 | otc alterations permit: fire only. add 46 speaker/strobes, 1 speaker, 1 duct detector, 1 monitoring module due to tenant improvement on the 11th fl maher not req | Heating and cooling | $30,000 | — | Finaled Mar 28, 2016 | 201509157014 |
| Sep 15, 2015 | otc alterations permit: fire only. add 46 speaker/strobes, 1 speaker, 1 duct detector, 1 monitoring module due to tenant improvement on the 12th fl maher not req | Heating and cooling | $30,000 | — | Finaled Apr 7, 2016 | 201509157012 |
| Sep 14, 2015 | otc alterations permit: fire only permit, add 50 speaker/strobes, 1 speakers, 1 duct detector as part of t.i. on 8/f. t.i. pa# 201507101140. n/a ordinance #155-13 | Heating and cooling | $30,000 | — | Finaled Aug 12, 2016 | 201509116741 |
| Sep 14, 2015 | otc alterations permit: fire only permit, add 50 speaker/strobes, 2 speakers, 1 duct detector and 1 monitoring module due to t.i. on 7/f. t.i. pa# 201506179207. n/a ordinance #155-13 | Heating and cooling | $30,000 | — | Finaled Mar 14, 2016 | 201509116740 |
| Sep 11, 2015 | otc alterations permit: fire only permit, add 48 speaker/strobes, 1 speaker, 1 duct detector and 1 monitoring module due to t.i. on 10/f. t.i. pa# 201507131285. n/a ordinance #155-13 | Heating and cooling | $30,000 | — | Finaled Mar 28, 2016 | 201509116743 |
| Sep 11, 2015 | otc alterations permit: fire only permit, add 50 speaker/strobes, 1 speaker, 1 duct detector and 1 monitoring module due to t.i. on 9/f. t.i. pa# 201507131284. n/a ordinance #155-13 | Heating and cooling | $30,000 | — | Finaled Mar 28, 2016 | 201509116742 |
| Sep 4, 2015 | otc alterations permit: revision to pa# 201505267078 5th floor electrical plan: add some lighting, new title 24 forms. n/a ordinance #155-13-clarifying emergency lighting | Electrical | $18,000 | — | Finaled Jul 27, 2016 | 201507212014 |
| Sep 2, 2015 | otc alterations permit: t.i. including ceiling, partitions, furniture, finishes, lighting fixtures, mechanical, plumbing, electrical, fire alarms, selective structural reinforcements. fire sprinklers deferred. n/a ordinance #155-13 | Plumbing | $2,400,000 | — | Finaled Sep 2, 2016 | 201506179153 |
| Aug 31, 2015 | otc alterations permit: 7th flor t.i.: consisting of ceilings, partitions, furniture, finishes, lighting, fixtures, mech, plumbing, elec, selective structural reinforcements. fire alarm, spklrs, sep permits | Plumbing | $2,400,000 | — | Finaled Sep 2, 2016 | 201506179207 |
| Aug 31, 2015 | otc alterations permit: 6th floor ti consisting of ceilings, partitions, furniture, finishes, lighting fixtures, mechaniical, plumbing, electrical, selective structural reinforcement. life safety deferred | Plumbing | $2,408,000 | — | Finaled Jul 27, 2016 | 201506179204 |
| Jul 17, 2015 | otc alterations permit: 10th floor commercial t.i. partitions, fixtures, mechanical, electrical, plmg, selective structual reinforment. n.a for the maher. life safety deferred | Electrical | $2,500,000 | — | Finaled Aug 10, 2016 | 201507131285 |
| Jul 17, 2015 | otc alterations permit: 9th floor commercial t.i. on plumbing, selective structural reinforcment. n/a for maher. life safety deferred | Plumbing | $2,500,000 | — | Finaled Sep 2, 2016 | 201507131284 |
On 02nd St
396 permits on record on 02nd St.
| Trade | Permits | Since Oct 3, 2024 | Median declared | Range | Last |
|---|---|---|---|---|---|
| Roofing | 37 | 7 | $80,000 | $32,380–$480,107 | Oct 29, 2025 |
| Heating and cooling | 143 | 8 | $42,000 | $3,256–$89,236 | May 18, 2026 |
| Electrical | 131 | 15 | $40,000 | $13,100–$162,000 | Sep 10, 2026 |
| Plumbing | 80 | 9 | $200,000 | $19,400–$655,596 | Oct 1, 2026 |
| Solar | 3 | 1 | — | under 5 | Apr 1, 2025 |
| Water heater | 2 | 0 | — | under 5 | Sep 18, 2020 |
Roof replacement cost in San Francisco
Across 5,896 one- and two-family reroof permits since October 3, 2024, most declared values run from $7,650 to $32,000 (the middle 80%); the median is $15,000 and half fall between $10,788 and $21,763. The lowest on record is $1 and the highest $4,315,170. Every permit behind that range.
Furnace, heat pump or air conditioner replacement cost in San Francisco
Across 291 one- and two-family heating and cooling permits since October 3, 2024, most declared values run from $1 to $224,616 (the middle 80%); the median is $25,196 and half fall between $5,000 and $116,433. The lowest on record is $1 and the highest $1,600,000. Every permit behind that range.
Source
San Francisco Department of Building Inspection, via DataSF, pulled nightly; the assessor roll for the property fields. As of October 3, 2026. Owner names are not shown on any page.