235 02nd St, San Francisco
12 home-service permits on record at 235 02nd St, San Francisco; no roofing permit on record.
Home-service permits on record at this address
| Issued | Work | Trade | Declared value | Contractor as filed | Status | Permit |
|---|---|---|---|---|---|---|
| Apr 1, 2026 | otc alterations permit: ground floor ti for suite 1500 to include restroom on 1st floor of an 6 story building. non structural demo, partitions, and act ceiling tile and lighting fixtures, and modified millwork and plumbing fixtures unit 0 | Plumbing | $525,000 | — | Finaled Sep 21, 2026 | 202603177749 |
| Apr 28, 2025 | otc alterations permit: ground floor-ti 202410314101 and 202502261170- deferred mechanical and electrical. ref ti 202410314101 unit 0 | Electrical | $150,000 | — | issued | 202504224999 |
| Apr 28, 2025 | otc alterations permit: 5th/f: deferred mep & electrical for t.i. 202412237311 unit 0 | Electrical | $80,000 | — | Finaled Oct 3, 2025 | 202504224986 |
| Mar 7, 2023 | otc alterations permit: 4/f: install 1 wall mount horn-strobes, install 48 ceiling mount strobes. 35 ceiling mount horn strobes,install 3 smoke detectors.4 duct detectors, 4 control relay modules. arch 202209273191 mech, 202211025727 unit 0 | Heating and cooling | $73,648 | — | Finaled Apr 10, 2023 | 202303073127 |
| Nov 6, 2018 | otc alterations permit: fire alarm tenant improvement for basement- construction plan 201809186437, mechanical- 2018-0820-7739. add 1 duct smoke detector, 1 area smoke detector, 2 relays, 14 strobes, 9 horn strobes, 1 power supply and new batteries. n/a for maher unit 0 | Heating and cooling | $30,000 | — | Finaled Nov 13, 2018 | 201811024834 |
| Sep 21, 2016 | otc alterations permit: 6th floor: scope of work to include demo of ti , demo to include walls, doors, plumbing, ceiling, lighting, millwork and interior finsihes. new ti to include new partition walls, doors, finishes and ceiling assemblies mechanical, av and fire sprinkler layouts to be reconfigured maher na unit 0 | Plumbing | $4,000,000 | — | Finaled Mar 10, 2017 | 201608084427 |
| Sep 16, 2016 | otc alterations permit: 4th floor: scope of work to include demo of ti , demo to include walls, doors, plumbing, ceiling, lighting, millwork and interior finsihes. new ti to include new partition walls, doors, finishes and ceiling assemblies mechanical, av and fire sprinkler layouts to be reconfigured maher na unit 0 | Plumbing | $4,000,000 | — | Finaled Sep 15, 2017 | 201608084429 |
| Apr 25, 2016 | otc alterations permit: 1st flr: ti from office to new food service. new food perp partition wall, case work, interior lighting, plumbing and electrical. maher na unit 0 | Plumbing | $109,320 | — | Finaled Jul 26, 2016 | 201604154863 |
| Apr 14, 2016 | otc alterations permit: electrical work for ti on the 2nd floor, new light, new receptacles outlets. ref 201510260733 unit 0 | Electrical | $373,136 | — | issued | 201604064080 |
| Apr 14, 2016 | otc alterations permit: 3/f: electrical work for ti on the 3rd floor, new light, control system, new receptacles outlets. ref 2016-0113-6939. compliance with maher ordinance no 155-1 not required unit 0 | Electrical | $548,640 | — | issued | 201604064079 |
| Apr 1, 2016 | otc alterations permit: 3rd floor: demo all lowside duct, vav boxes, grilles, duct mains & hw piping. install new duct mains, vav boxes, water source, heat pumps and lowside duct on 3rd flr . install new hw condesner water & condensate piping. install 2 new fsd. ref pa 2016 0113 6939 maher na unit 0 | Heating and cooling | $500,000 | — | issued | 201604013676 |
| Jan 7, 2016 | otc alterations permit: demo all low side duct, vav boxes, and diffusers on 2nd floor. demo duct mains & hot water piping as shown on demo plan. install new duct, vavs, water source heat pumps & low side ductwork on 2nd floor. install new hot water, condensor water & condensate drain piping on 2nd floor. maher na unit 0 | Heating and cooling | $850,462 | — | issued | 201601076514 |
On 02nd St
396 permits on record on 02nd St.
| Trade | Permits | Since Oct 3, 2024 | Median declared | Range | Last |
|---|---|---|---|---|---|
| Roofing | 37 | 7 | $80,000 | $32,380–$480,107 | Oct 29, 2025 |
| Heating and cooling | 143 | 8 | $42,000 | $3,256–$89,236 | May 18, 2026 |
| Electrical | 131 | 15 | $40,000 | $13,100–$162,000 | Sep 10, 2026 |
| Plumbing | 80 | 9 | $200,000 | $19,400–$655,596 | Oct 1, 2026 |
| Solar | 3 | 1 | — | under 5 | Apr 1, 2025 |
| Water heater | 2 | 0 | — | under 5 | Sep 18, 2020 |
Roof replacement cost in San Francisco
Across 5,896 one- and two-family reroof permits since October 3, 2024, most declared values run from $7,650 to $32,000 (the middle 80%); the median is $15,000 and half fall between $10,788 and $21,763. The lowest on record is $1 and the highest $4,315,170. Every permit behind that range.
Furnace, heat pump or air conditioner replacement cost in San Francisco
Across 291 one- and two-family heating and cooling permits since October 3, 2024, most declared values run from $1 to $224,616 (the middle 80%); the median is $25,196 and half fall between $5,000 and $116,433. The lowest on record is $1 and the highest $1,600,000. Every permit behind that range.
Source
San Francisco Department of Building Inspection, via DataSF, pulled nightly; the assessor roll for the property fields. As of October 3, 2026. Owner names are not shown on any page.