303 02nd St, San Francisco
96 home-service permits on record at 303 02nd St, San Francisco; the roof was last permitted on Aug 13, 2025 at a declared value of $950,000.
Home-service permits on record at this address
| Issued | Work | Trade | Declared value | Contractor as filed | Status | Permit |
|---|---|---|---|---|---|---|
| Aug 4, 2026 | otc alterations permit: 5th fl: mechanical and electrical for pa#202604038836 | Electrical | $46,400 | — | issued | 202608035975 |
| Jun 12, 2026 | sign - erect: suite 105: install 1 electric, wall, single faced sign "freshroll", 9'7" x 24", white led channel letter 3" dept | Electrical | $4,000 | — | issued | 202606112992 |
| Nov 12, 2025 | otc alterations permit: #105: interior tenant improvement including renovation of non bearing interiror partitoins and finishes,modification to the lighting, modiifcation to the electrical and data,modification to the plumbing and fixtures,new kitchen equipment, with no change to building envelope or shear bracing walls | Plumbing | $778,778 | — | issued | 202507211257 |
| Aug 13, 2025 | ReRoof: roofing: no hot work. sure-flex pvc white solar reflectance .87 thermal remit .89 sir 110 | Roofing | $950,000 | — | Finaled Oct 8, 2025 | 202508132968 |
| Apr 1, 2025 | otc alterations permit: suite 400 interior ti: upgrade door hardware. upgrade analog video intercom to a new video digital system and door operator at/for the suite main entry, power supply, back up battery, all associated hardware, conduit & cabling & software installation | Solar | $32,104 | — | Finaled Aug 27, 2025 | 202503101928 |
| May 13, 2024 | otc alterations permit: #s135: hood and duct fire system installation ref pa 202310319879 | Heating and cooling | $5,670 | — | Finaled Aug 9, 2024 | 202405131965 |
| May 1, 2024 | ReRoof: re-roofing | Roofing | $479,729 | — | Finaled Mar 31, 2025 | 202405011139 |
| Jul 20, 2023 | otc alterations permit: convert parking stalls into van accessible ev charging stall & standard ev charging stall. new type-3 ev chargers provided at each stall per sf ordinance 244-19 | Electrical | $350,000 | — | Finaled Mar 12, 2024 | 202212158430 |
| Jan 24, 2023 | ReRoof: reroofing | Roofing | $1,314,937 | — | Finaled May 31, 2023 | 202301230569 |
| Jun 13, 2022 | otc alterations permit: ste n401 & n450: mechanical & electrical work for tenant improvement. ref arch pa# 202203109672 | Electrical | $20,000 | — | Finaled Sep 8, 2022 | 202206075734 |
| Jun 13, 2022 | otc alterations permit: 5th fl - mechanical and electrical for ti at suite n550 ref pa 2022-0114-6043 | Electrical | $15,000 | — | Finaled Sep 8, 2022 | 202206075732 |
| Oct 18, 2021 | otc alterations permit: mechanical and electrical work for ti on 6th fl ref 201907186225 | Electrical | $45,000 | — | Finaled Jan 31, 2022 | 202110140463 |
| Aug 10, 2021 | otc alterations permit: 7/f: mechanical, electrical and plumbing for t.i. ref arch 202101273430 | Plumbing | $1 | — | issued | 202105200714 |
| Jun 4, 2021 | otc alterations permit: 6th fl - mechanical, electrical and plumbing for tenant improvement. ref pa 2021-0127-3427 | Plumbing | $1 | — | issued | 202105240893 |
| Jan 25, 2021 | otc alterations permit: 3rd fl fire alarm ti: adding power supply, smoke detectors, duct detectors, relay module, monitor modules, speaker and speaker-strobe to existing notifier nfs2-3030 fire alarm system. arch & mech 2020-0624-9087 | Heating and cooling | $42,000 | — | Finaled Feb 12, 2021 | 202101122515 |
| Dec 30, 2020 | otc alterations permit: demo and replace closed circuit cooling tower, condenser water pumps, expansion tank & control panel | Heating and cooling | $250,000 | — | Finaled Sep 2, 2021 | 202010277544 |
| Dec 21, 2020 | otc alterations permit: 10th fl fire alarm ti: adding smoke detectors, duct detectors, monitor modules, and speaker-strobes to existing notifier nfs2-3030 fire alarm system. adding call station to existing cornell 2-way comm system. ref ti 2020-0624-9094 | Heating and cooling | $61,000 | — | Finaled Feb 12, 2021 | 202012090609 |
| Dec 17, 2020 | otc alterations permit: fire alarm ti: adding loop control module, smoke detectors, duct detectors, relay modules, monitor modules and speaker-strobes to existing notifier nfs2-3030 fa system. arch ref 2020-0701-9450. two-way comm | Heating and cooling | $31,444 | — | Finaled Feb 12, 2021 | 202011068449 |
| Dec 7, 2020 | otc alterations permit: fire alarm ti: adding power supplies, speaker-strobes, strobe, duct detectors, smoke detectors and relay modules to existing notifier nfs2-3030 fire alarm system | Heating and cooling | $17,966 | — | Finaled Dec 14, 2020 | 202012020083 |
| Nov 6, 2020 | otc alterations permit: 3rd fl: mechanical, electrical & plumbing for ti. ref pa# 202002265504 | Plumbing | $220,000 | — | Finaled Mar 26, 2021 | 202009194534 |
| Oct 3, 2020 | otc alterations permit: restroom upgrades on 3/f scope of work includes new stall partitions, reinstalling plumbing fixtures & restroom accessories, or providing new as required. scope of work to be barrier removal only | Plumbing | $75,000 | — | Finaled Jan 28, 2021 | 202009124020 |
| Jul 13, 2020 | otc alterations permit: replace window with door for 5th fl. roof terrace, suite 500s. interior landing & steps | Roofing | $180,000 | — | Finaled May 20, 2022 | 201911086833 |
| Feb 19, 2020 | otc alterations permit: fire alar ti add 1 duct detector , 1 relay module, relocate 1 sprinkler strobe to e notifier nfs2 3030 fire alarm system ref 201912189855 | Heating and cooling | $6,746 | — | Finaled Aug 10, 2020 | 202002194844 |
| Feb 6, 2020 | otc alterations permit: suite #401 4th floor: new construction of non-structural wall. new millwork, addition of power and data and replaceing light fixtures in suite #401. no structural work inlcuded in scope. no increase in area. no change in occupancy or use. fire/life safety, mech, elec, plumbing separate permit | Plumbing | $600,000 | — | issued | 201911127095 |
| Feb 6, 2020 | otc alterations permit: #401 4th floor: demo of existing non-structural demising wall in suite 401. no increase in area. no change in occupancy or use. mech, electrical, and fire/life safety scopes are not part of project work. remodel per pf #201911127095 | Electrical | $30,000 | — | issued | 201911127093 |
| Nov 14, 2019 | otc alterations permit: occupant load calculation only room 504a circulation, 504b commons, 505 coffee #570 roof deck #506 x-large training. ref pa 2019-1101-6211. maher n/a | Roofing | $1 | — | issued | 201911147290 |
| Nov 14, 2019 | otc alterations permit: fire alarm ti add 1 power supply, 39 speaker strobes, 6 duct det, 1 smoke det, 1 relay module to exist notifier nfs2 3030 fa system | Heating and cooling | $9,000 | — | Finaled Feb 1, 2020 | 201911127065 |
| Nov 5, 2019 | otc alterations permit: mechanical and electrical work ti on 5th fl ref 201909232430. maher n/a | Electrical | $416,000 | — | Finaled Jun 2, 2022 | 201911016213 |
| Oct 30, 2019 | otc alterations permit: 2nd fl - fire alarm ti adding 40, speaker-strobes & 5 duct detectors to existing notifier nfs2-3030 fa system. ref pa 2019-0807-8121 & 2019-0509-0218 | Heating and cooling | $13,424 | — | issued | 201910225240 |
| Oct 30, 2019 | otc alterations permit: 8th fl - fire alarm ti - add 2 poiwer supplies, 87 speaker-strobes, 5 duct dtectors, 2 smoke detectors, 2 relays to e9) notifier nfs2-3030 fa system. ref pa 2019-0807-8127 and 2019-0612-3172 | Heating and cooling | $13,424 | — | issued | 201910225238 |
| Oct 24, 2019 | otc alterations permit: all gender rr accessibility improvements on the ground fl: scope of work includes new door and jamb signage, new lavatory and existing plumbing fixtures and accessories to be compliant | Plumbing | $10,000 | — | Finaled Nov 13, 2019 | 201905039668 |
| Oct 23, 2019 | otc alterations permit: fire alarm ti adding 2 power supplies 44 speaker strobes, 1 speaker, 4 duct detectors, 1 smoke detector and 1 relay to e notifier nfs2-3030 fire alarm system maher not req | Heating and cooling | $13,424 | — | issued | 201910235374 |
| Oct 17, 2019 | otc alterations permit: 4/f: demolish ductwork to accommadte reloction of vav boxes. install new water source heat pump. ref t.i. pa201907317423 | Heating and cooling | $12,000 | — | Finaled Mar 30, 2021 | 201909161702 |
| Oct 16, 2019 | otc alterations permit: 6th floor: renovate of partial tenant space includes non-structural wall demo, finishes and lighting. electrical under separate permit | Electrical | $70,036 | — | Finaled Jan 27, 2020 | 201910023297 |
| Sep 13, 2019 | otc alterations permit: deferred electrical 201906193897 scope includes improvement to suite on 4th fl suite 450 n consturction of non structural partitions, ceilings, light fixtures, millwork, finishes | Electrical | $100,000 | — | Finaled Jan 31, 2020 | 201909101104 |
| Aug 8, 2019 | otc alterations permit: 8th flr. electrical, mech and plumb for tenant improvement. ref arch 201906123172 | Plumbing | $150,000 | — | issued | 201908078127 |
| Aug 8, 2019 | otc alterations permit: 7th flr. electrical, mech and plumb for tenant improvement | Plumbing | $150,000 | — | issued | 201908078124 |
| Jul 12, 2019 | otc alterations permit: 10th flr restroom upgrades. new stall partitions, re-installing the plumbing fixtures and accessories to be code compliant | Plumbing | $15,000 | — | Finaled Jul 23, 2019 | 201906274588 |
| May 16, 2019 | otc alterations permit: install 2 new floor mounted heatpumps and install condenser water piping | Heating and cooling | $10,000 | — | Finaled Oct 21, 2019 | 201905150663 |
| May 10, 2019 | otc alterations permit: revision to pa 201812178495. update to plan at roof terrace to reflect path to both doors & furniture at terrace & break room per sfdbi request | Roofing | $1 | — | issued | 201905019384 |
| Apr 8, 2019 | otc alterations permit: 9th floor: mechanical demo ductwork. install 3 new fan coil units. install 1 new rooftop condenser unit. intall dx piping per plans. n/a for maher | Heating and cooling | $198,000 | — | issued | 201904057238 |
| Apr 1, 2019 | otc alterations permit: electrical t-24 4th flr bmp ref 201810123050 maher na | Electrical | $1,500 | — | issued | 201904016725 |
| Apr 1, 2019 | otc alterations permit: electrical t-24all gender restroom 4th floor ref 201901039518 maher na | Electrical | $1,500 | — | issued | 201904016723 |
| Jan 7, 2019 | otc alterations permit: 4th floor: revision to app#201711022937 and 201809281699. scope of work includes demolition of extg plumbing fixtures and finishes. construction includes new non structural partitions, finishes, plmg fixtures, lighting, and ceiling. n/a for maher | Plumbing | $150,000 | — | Finaled May 29, 2019 | 201901039518 |
| Dec 27, 2018 | otc alterations permit: 5th floor: replace window with door for roof terrace, in suite 500n. remodel interior ramp at door. n/a for maher | Roofing | $209,000 | — | Finaled May 7, 2019 | 201812178495 |
| Nov 21, 2018 | otc alterations permit: ref pa# 201806071277; fire alarm whole fl. t.i. to nfs2-3030 adding strobe power supplly ; 120 s[ealer strobes, 4 speakers, 9 smoke detectors, 11 duct detectors, 5 control relays and 1 monitor module | Heating and cooling | $86,301 | — | Finaled Nov 28, 2018 | 201811206356 |
| Nov 19, 2018 | otc alterations permit: 6th fl - revision to pa 2018-0323-4421, 2018-0607-1277 and 2018-0410-5918 to revise layout including mechanical and electrical | Electrical | $1 | — | Finaled Feb 11, 2019 | 201811196226 |
| Nov 16, 2018 | additions alterations or repairs: 6th fl - revision to pa 2018-0323-4421 to add horizontal exit and change open office area to assembly all hands space. work includes mechanical and electrical revisions | Electrical | $200,000 | — | Finaled Jan 3, 2020 | 201806071277 |
| Oct 19, 2018 | otc alterations permit: ste: 400n: revision to app#2017-11-02-2937. scope includes unoccupied suite on 4th floor. construction of new non-structural demising wall and accessibility upgrades. demolition of no-structural partitions and plumbing fixtures | Plumbing | $25,000 | — | Finaled Apr 16, 2019 | 201809281699 |
| Oct 10, 2018 | otc alterations permit: north tower: 5th flr - ref 201806273171 fire alarm ti to nfs-3030 addining 1 smk det, 80 speaker/strobes and 1 duct det maher na | Heating and cooling | $13,364 | — | Finaled Jan 29, 2019 | 201810092674 |
| Oct 10, 2018 | otc alterations permit: 7th floor:roof terrace: replace the extg waterproofing at roof surfacing. add planters and build in seating. new landscape | Roofing | $600,000 | — | cancelled | 201809129836 |
| Jul 12, 2018 | otc alterations permit: suite 900 -mep only in ref to 201802020269. demo diffusers in revised office areas, install new diffusersa in new ceiling and duct as shown maher na | Heating and cooling | $47,000 | — | issued | 201806252865 |
| Jun 12, 2018 | otc alterations permit: ref pa#201711295063 fire alarm t.i. to existing notifier nfs2-3030 on plaza level of south tower, adding new speakers/strobes, and new duct smoke detectors for new heat pumps | Heating and cooling | $7,226 | — | Finaled Jun 27, 2018 | 201806121593 |
| Jun 1, 2018 | otc alterations permit: ref #201803234421 mechanical and electrical work on the 6th floor. n/a for maher | Electrical | $250,000 | — | Finaled Feb 11, 2019 | 201804105918 |
| Apr 10, 2018 | otc alterations permit: install new wall, doors, floor penetrations, case work eq, furniture, wall floor finishes, ceiling, light fix, restrooms, outdoor furniture. demo ex walls, provide new mech ducts maher not req | Heating and cooling | $350,000 | — | Finaled Jan 24, 2019 | 201711295063 |
| Apr 6, 2018 | otc alterations permit: t-24 electrical for work done under ref 201802141238; n/a maher | Electrical | $7,000 | — | Finaled Nov 13, 2018 | 201804065712 |
| Apr 6, 2018 | otc alterations permit: t-24 electrical for work done under ref 201802141238; n/a maher | Electrical | $7,000 | — | Finaled Nov 13, 2018 | 201804065708 |
| Mar 29, 2018 | otc alterations permit: 6th floor: t.i. to include new partitions, doors, frames, hardware glazing millwork addition unisex ada restrooms, electrical, mech, and plmg deferred. n/a for maher | Electrical | $4,927,604 | — | Finaled Jan 3, 2020 | 201803234421 |
| Sep 20, 2017 | otc alterations permit: 8/f: electrical & plumbing work for tenant improvement. ref #201707182110. maher na | Plumbing | $2,500 | — | issued | 201708164961 |
| Jul 31, 2017 | otc alterations permit: 5th fl, suite 525: new electrical - lighting power & signal, title 24. ref 20170526-7751. n/a ordinance #155-13 | Electrical | $1 | — | issued | 201707121659 |
| Apr 25, 2017 | otc alterations permit: 6th floor fire alarm scope: speakers/strobes, duct detectors. ref pa #201703151499 | Heating and cooling | $7,500 | — | issued | 201704254810 |
| Mar 16, 2017 | otc alterations permit: 6/f-interior t.i. to include a new corridor, drywall & finishes. mech. & electrical under seperate permit. n/a ordinance #155-13 | Electrical | $79,680 | — | Finaled May 9, 2018 | 201703151499 |
| Mar 13, 2017 | otc alterations permit: 5/f- mechanical work ref. to pa#201702109138, duct work, new cooling vav's, new vav's with reheat coil, new exhaust, new heat pumps. n/a ordinance #155-13 | Heating and cooling | $1,000,000 | — | Finaled Feb 13, 2018 | 201703030598 |
| Mar 6, 2017 | otc alterations permit: 5th floor: electrical: all new power and lighting. reference #201702109138 n/a for maher | Electrical | $1 | — | Finaled Feb 13, 2018 | 201702240052 |
| Jan 18, 2017 | otc alterations permit: #950n- demolition of existing non-structural partitions, ceiling, lighting, floor finishes and any associated mechanical, electrical & plumbing in an unoccupied tenant suite per ab-017. n/a ordinance #155-13 | Plumbing | $100,000 | — | Finaled May 10, 2017 | 201609137556 |
| Jan 18, 2017 | otc alterations permit: #400n- demolition of existing non-structural partitions, ceiling, lighting, floor finishes and any associated mechanical, electrical & plumbing in an unoccupied tenant suite per ab-017. n/a ordinance #155-13 | Plumbing | $100,000 | — | Finaled May 10, 2017 | 201609137553 |
| Jan 12, 2017 | otc alterations permit: 9th floor: seperating to tenant spaces & ti - partitions, minor elect, minor plumb. mep/fire/life safety deffered. maher na | Plumbing | $319,485 | — | Finaled Mar 11, 2019 | 201509106566 |
| Dec 5, 2016 | otc alterations permit: suite 750: mechanical and electrical work for ti ref pa 2016-1108-2280. maher na | Electrical | $4,000 | — | Finaled May 18, 2017 | 201612054101 |
| Oct 17, 2016 | otc alterations permit: mechanical and electrical title 24 to add new equipment and fixtures on the 4th fl. ref 201610049503 | Electrical | $11,000 | — | Finaled Mar 27, 2017 | 201610170480 |
| Sep 26, 2016 | otc alterations permit: 3rd fllor - suite 300b: minor non structural renovation to office space. selective demo, minor electrical and finishes, no changes to suspended ceiling system ref ti 201609097195 | Electrical | $45,000 | — | Finaled Dec 9, 2016 | 201609268748 |
| Sep 9, 2016 | otc alterations permit: partial remodel selective demo, non-structural partitions designated demising wall, relocation of casework electrical outlets and light fixture. maher na | Electrical | $65,000 | — | Finaled Dec 9, 2016 | 201609097195 |
| Aug 15, 2016 | otc alterations permit: new new load bearing walls, suspended ceilings and headers in select areas, 1 new toielet room , new floor and wall finishes. add 4 exhaust fans and type 2 vapor hood. upgrade elec lighting to comply with t24. upgrade plumbing systems maher not req | Plumbing | $175,000 | — | Finaled Dec 20, 2016 | 201607253274 |
| Jul 12, 2016 | sign - erect: 2 electric single faced wall signs. n/a ordinance #155-13 | Electrical | $8,000 | — | issued | 201607081831 |
| Jun 22, 2016 | otc alterations permit: ground floor: mechanical and electrical for work done under app#201603182448. n/a for maher | Electrical | $58,000 | — | Finaled Jul 28, 2016 | 201606149897 |
| Jun 15, 2016 | otc alterations permit: ground floor: mechanical and electrical for work done under app#201603182443. n/a for maher | Electrical | $119,000 | — | Finaled Jul 28, 2016 | 201606149894 |
| Jun 14, 2016 | sign - erect: erect projecting signs for hook & scissor and motus non-electric signs, maher na | Electrical | $15,000 | — | issued | 201606149851 |
| Jun 14, 2016 | sign - erect: erect wall signs for hook & scissor and motus electric signs, maher na | Electrical | $20,000 | — | issued | 201606149848 |
| Nov 10, 2015 | otc alterations permit: 7th floor: reference building pa 2015-0318-1202. electrical lighting | Electrical | $136,000 | — | issued | 201510301217 |
| Oct 26, 2015 | otc alterations permit: suite 1000 - remove old computer room air conditioner & replace with new of same size | Heating and cooling | $43,000 | — | issued | 201510210374 |
| Oct 21, 2015 | otc alterations permit: 4th floor: mechanical & electrical work for ti ref pa 2015 0915 6943. n/a for maher | Electrical | $200,000 | — | Finaled Jun 6, 2016 | 201510200237 |
| Oct 16, 2015 | otc alterations permit: 6th floor suite 650 & 660, north tower t.i. fire alarm - scope of work - smoke detector, duct detectors, speaker/strobes, strobe. reference ti 2015.0929.8310 n/a maher ordinance | Heating and cooling | $35,000 | — | Finaled Oct 30, 2015 | 201510169946 |
| Sep 30, 2015 | otc alterations permit: 6th floor, mechanical & electrical work for ti improvement at suite 650/660. ref pa 2015-0722-2145 & 2015-0916-7083 | Electrical | $200,000 | — | Finaled May 25, 2016 | 201509298310 |
| Sep 2, 2015 | otc alterations permit: 5th floor:fire alarm permit: add 4 duct detectors and 4 relays due to the addition of 4 new heat pumps. no associated arch permit. ref mech permit is app#201507282603. n/a for maher | Heating and cooling | $5,500 | — | Finaled Sep 30, 2015 | 201509025919 |
| Jul 29, 2015 | otc alterations permit: suite #520: installation of four water cooled heat pumps for supplemental cooling in an extg office tenant. n/a for the maher | Heating and cooling | $50,000 | — | issued | 201507282603 |
| Jul 27, 2015 | otc alterations permit: suite 450, 4th floor - mechanical & electrical work for tenant improvement, ref #2015.0512.6883. n/a maher ordinance | Electrical | $58,715 | — | Finaled Oct 8, 2015 | 201506169057 |
| Jul 27, 2015 | otc alterations permit: suite 460, 4th floor - mechanical & electrical work for tenant improvement, ref #2015.0512.6887, relcoate thermostates & vav box, new lighting. n/a maher ordinance | Electrical | $50,000 | — | Finaled Oct 13, 2015 | 201506169052 |
| Jun 10, 2015 | otc alterations permit: 7th flr : add 5 speaker/strobes ,2 strobes,2 duct detectors & one plenum smoke detector & relocate 3 speaker/strobes & one strobe as part of a ti ref.bldg 201503181202; maher n/a | Heating and cooling | $7,000 | — | Finaled Oct 30, 2015 | 201506108605 |
| Jun 2, 2015 | otc alterations permit: #460- t.i. include demo of non-structural partitions and building new non-structural partitions, all or revised hvac, electrical, plumbing and life safety work under seperate permit. building is fully sprinklered. n/a ordinance #155-13 | Heating and cooling | $198,614 | — | Finaled Oct 13, 2015 | 201505216887 |
| Jun 2, 2015 | otc alterations permit: #450- t.i. include demo of non-structural partitions and building, new non-structural partitions, all or revised hvac, electrical, plumbing and life safety work will be submitted for permit seperately. building is fully sprinklered. n/a ordinance #155-13 | Heating and cooling | $262,440 | — | Finaled Oct 13, 2015 | 201505216883 |
| May 14, 2015 | otc alterations permit: roof, building improvement include the demo of portions of existing roof guard rail & installing new roof guardrail at area using window washing equipment ; maher n/a | Roofing | $150,000 | — | Finaled Aug 19, 2016 | 201409297514 |
| May 14, 2015 | otc alterations permit: 4th flr: t.i. includes demo of non-structural partitions and building non structural partitions. all new or revised hvac, elec, plmbg & l/s work will be designed built and permit separately maher n/a | Heating and cooling | $265,700 | — | issued | 201406309958 |
| May 13, 2015 | otc alterations permit: add amplifier, 96 speaker strobes, 3 strobes, 3 smoke detectors, 6 duct detec tors, 3 relays, 2 modules to existing fire alarm system due to a tenant improvement on the 7th fl of north bldg. ref 201306189803 ref mech 201503171146 | Heating and cooling | $67,000 | — | Finaled Jun 17, 2015 | 201505126068 |
| May 13, 2015 | otc alterations permit: 5th floor north tower suite #520: t.i. include the bldg of new non structural partitions. all new or revised hvac, electrical, plmg, & life safety work will be design build and submitted seperately. . n/a for the maher | Heating and cooling | $198,000 | — | issued | 201503171061 |
| Mar 30, 2015 | otc alterations permit: 7th floor - new non-structural common corridor & demising walls. all new or revised hvac, electrical, plumbing & life safety/sprinklers will be design build & submitted for permit separately. . n/a maher ordinance | Heating and cooling | $370,000 | — | Finaled Mar 30, 2016 | 201503181202 |
| Mar 25, 2015 | otc alterations permit: mech & ele work associated w/approved pa # 2015 0223 9019 including lighting & hvac/ life safety under seperate permit maher- not req'd | Heating and cooling | $1,408,000 | — | Finaled Apr 27, 2017 | 201503171146 |
| Mar 2, 2015 | otc alterations permit: 13 evacuation plan maps floors 1-4 & roof maher - not req'd | Roofing | $3,900 | — | Finaled May 1, 2015 | 201502279491 |
On 02nd St
396 permits on record on 02nd St.
| Trade | Permits | Since Oct 3, 2024 | Median declared | Range | Last |
|---|---|---|---|---|---|
| Roofing | 37 | 7 | $80,000 | $32,380–$480,107 | Oct 29, 2025 |
| Heating and cooling | 143 | 8 | $42,000 | $3,256–$89,236 | May 18, 2026 |
| Electrical | 131 | 15 | $40,000 | $13,100–$162,000 | Sep 10, 2026 |
| Plumbing | 80 | 9 | $200,000 | $19,400–$655,596 | Oct 1, 2026 |
| Solar | 3 | 1 | — | under 5 | Apr 1, 2025 |
| Water heater | 2 | 0 | — | under 5 | Sep 18, 2020 |
Roof replacement cost in San Francisco
Across 5,896 one- and two-family reroof permits since October 3, 2024, most declared values run from $7,650 to $32,000 (the middle 80%); the median is $15,000 and half fall between $10,788 and $21,763. The lowest on record is $1 and the highest $4,315,170. Every permit behind that range.
Furnace, heat pump or air conditioner replacement cost in San Francisco
Across 291 one- and two-family heating and cooling permits since October 3, 2024, most declared values run from $1 to $224,616 (the middle 80%); the median is $25,196 and half fall between $5,000 and $116,433. The lowest on record is $1 and the highest $1,600,000. Every permit behind that range.
Source
San Francisco Department of Building Inspection, via DataSF, pulled nightly; the assessor roll for the property fields. As of October 3, 2026. Owner names are not shown on any page.