46 home-service permits on record at 55 02nd St, San Francisco; no roofing permit on record.
Home-service permits on record at this address
| Issued | Work | Trade | Declared value | Contractor as filed | Status | Permit |
|---|---|---|---|---|---|---|
| May 30, 2024 | otc alterations permit: fire only for the "alston and bird" remodel on floor 21; additions are 1 smoke detector, 1 duct detectors, 2 modules, 24 speakers, 15 speaker/strobes, and 2 strobes, 2 speaker/strobes are being relocated, ref pa# 202403117504 unit 0 | Heating and cooling | $66,800 | — | Finaled Jul 9, 2024 | 202405303253 |
| Jan 3, 2023 | otc alterations permit: 19th and 21st floor restroom remodel including removal of non-structural partitions, finishes, light fixtures, plumbing fixtures and accesories. electrical drawings included unit 0 | Plumbing | $118,289 | — | issued | 202212148250 |
| Dec 13, 2022 | otc alterations permit: 20/f: electrical work for t.i. ref to bpa#202210184541 unit 0 | Electrical | $3,000 | — | issued | 202211216953 |
| Nov 22, 2022 | otc alterations permit: ste 1975 mechanical and electrical scope under office tenant improvement project reference permit 202210063900 unit 0 | Electrical | $44,000 | — | Finaled Apr 5, 2023 | 202211156572 |
| Sep 26, 2022 | otc alterations permit: 23rd fl - hvac modifications to support interior ti ref pa 2022-0615-6443 unit 0 | Heating and cooling | $37,000 | — | Finaled Jul 17, 2023 | 202209212828 |
| Sep 15, 2022 | otc alterations permit: fire only work for the "energy foundation" remodel on fl 24 additions are 14 duct detectors, 9 speakers/strobes, and the relocation of 3 speaker/strobes, ref pa# 202206166472 unit 0 | Heating and cooling | $31,000 | — | Finaled Dec 16, 2022 | 202209152474 |
| Sep 2, 2022 | otc alterations permit: 20/f: "a,v, & r llp" remodel, addition of smoke detectors, duct detectors, modules, speaker/strobes, strobe, & 2-way comm stations. ref bpa#202205124059 unit 0 | Heating and cooling | $48,054 | — | Finaled Sep 1, 2023 | 202209021784 |
| Sep 1, 2022 | otc alterations permit: 24/f: revision to pa# 202206166472 for non structural revisions to men's and all gender restrooms. scope of work: partitions, relocate plumbing fixtures, lights and hvac venting in restroom area only unit 0 | Heating and cooling | $8,000 | — | Finaled May 19, 2023 | 202208301544 |
| Aug 4, 2022 | otc alterations permit: 23rd fl - tenant improvement: removal of non structural partitions and finishes, millwork and plumbing fixtures; mep,fire life safety and sprinkler under separate permit unit 0 | Plumbing | $250,000 | — | Finaled Jul 17, 2023 | 202206156443 |
| Apr 21, 2022 | otc alterations permit: 4: fire only work for the "intercom" remodel. additions and replacement s are 12 smoke detectors, 2 duct detectors, 11 modules, 51 speakers / strobes, & 8 strobes. ref pa# 202201045364 unit 0 | Heating and cooling | $48,500 | — | Finaled Jun 9, 2022 | 202204212662 |
| Apr 1, 2022 | otc alterations permit: floors 1,3,16,17: title 24 electrical compliances to add lighting and power to restrooms. ref t.i. pa202203220555. maher n/a unit 0 | Electrical | $39,000 | — | Finaled Dec 27, 2022 | 202204011370 |
| Apr 1, 2022 | otc alterations permit: floors 1,3,16,17: t.i., removal of nonstructural partitions finishes, light fixtures, plumbing & accessores, upgrades to 1,3,16&17 floors, core restrooms. mep & fire life safety under separate permit unit 0 | Plumbing | $450,000 | — | Finaled Dec 27, 2022 | 202203220555 |
| Jan 11, 2022 | otc alterations permit: fire only for the intercom canteen remodel on floor 5; additions are 3 duct detectors, 1 module, 1 speaker/strobes, and 4 strobes. ref pa# 202012221525 unit 0 | Heating and cooling | $18,400 | — | Finaled Mar 24, 2022 | 202201115711 |
| Aug 26, 2021 | otc alterations permit: demo of only e non structural partitons, associated power and telecome outlets, plumbing and finishes per ab-017 per ab-017 unit 0 | Plumbing | $65,000 | — | Finaled Jul 6, 2022 | 202107295363 |
| Dec 2, 2020 | otc alterations permit: hvac upgrades with new vav's for a spec suite on the 24th fl. ref pa #201912119252. maher na unit 0 | Heating and cooling | $85,000 | — | Finaled May 10, 2021 | 202007079753 |
| Oct 6, 2020 | otc alterations permit: hvac upgrades with new vavs ref 201912119253 unit 0 | Heating and cooling | $85,000 | — | Finaled May 19, 2021 | 202007079708 |
| Jul 19, 2020 | otc alterations permit: suite #1950; hvac modifications for new spec suite ref pa# 201912300972 unit 0 | Heating and cooling | $80,000 | — | Finaled May 10, 2021 | 202007079746 |
| Jul 15, 2020 | otc alterations permit: concrete saw cutting for new plumbing work ref 201912119253 unit 0 | Plumbing | $125,000 | — | Finaled May 19, 2021 | 202007079715 |
| Jan 29, 2020 | otc alterations permit: basement: demolition of existing chain link fence & construction of new non-structural partitions, doors, frames, ceilings, lighting, plumbing & finishes for gym, bike storage & locker area. new single use shower/toilet rooms. deferred: life safety, fire sprinklers, fire alarm, mep. maher na unit 0 | Plumbing | $1,100,000 | — | Finaled May 19, 2021 | 201912119253 |
| May 28, 2019 | sign - erect: electric wall sign unit 0 | Electrical | $5,000 | — | Finaled Aug 28, 2019 | 201905201067 |
| May 24, 2019 | otc alterations permit: 1st floor: fire alarm work for "suite 150" remodel on floor 1; addition is 1 duct detector to replace an existing one at a heat pump. ref pa 2019-0128-1445 unit 0 | Heating and cooling | $1,585 | — | Finaled Jun 14, 2019 | 201905241600 |
| May 3, 2019 | otc alterations permit: mep title 24 to install new lighting, power, hvac systems with plumbing ref 201902153100 on 5th fl. maher not req unit 0 | Heating and cooling | $342,480 | — | Finaled Sep 13, 2022 | 201904228605 |
| Feb 7, 2019 | otc alterations permit: 26th fl - mep to install mechanical and plumbintg systems, lighting and power to 26th floor ti. update architectural sheet to revise non-infringement statement. please refer to pa 2018-1213-8240 for ti work unit 0 | Plumbing | $324,000 | — | Finaled Jun 24, 2022 | 201902072366 |
| Feb 7, 2019 | otc alterations permit: 25th fl - mep to install mechanical and plumbintg systems, lighting and power to 25th floor ti. update architectural sheet to revise non-infringement statement. please refer to pa 2018-1213-8239 for ti work unit 0 | Plumbing | $324,000 | — | Finaled Jun 24, 2022 | 201902072364 |
| Oct 11, 2018 | otc alterations permit: new electrical, mechanical , and security devices, luminaires and lighting control devices/ add 1 fan powered box, add 1 exhaust fan, add ceiling diffusers rework duct districbution and air balance unit 0 | Heating and cooling | $100,000 | — | issued | 201808207765 |
| Oct 10, 2018 | otc alterations permit: 19th fl - fire alarm work for permit #2 on the suite 1925. additions are 4 duct detectors at fau-powered boxes. fa permit #1 was done work app 2018-0725-5459 and 2018-0716-4654 unit 0 | Heating and cooling | $6,340 | — | Finaled Dec 11, 2018 | 201810102709 |
| Oct 9, 2018 | otc alterations permit: fire alarm work for ultimate software remodel on floor 23, additions are 2 smoke detectors, 16 duct detectors, 1 strobe power supply, 27 speaker strobes, 2 strobes unit 0 | Heating and cooling | $46,430 | — | Finaled Jan 25, 2019 | 201810052373 |
| Oct 9, 2018 | otc alterations permit: fire alarm work for the ultimate software remodel floor 22, additions are 8 smoke detectors,12 duct detectors, 1 strobe power supply, 30 speak/strobes unit 0 | Heating and cooling | $44,650 | — | Finaled Jan 25, 2019 | 201810052369 |
| Jul 23, 2018 | otc alterations permit: spec suite 1925 on 19th fl: ti includes building new non-structural partitions. all new or revised hvac, electrical, plumbing, and life safety work will be design build under separate permit. building is "fully sprinklered". maher na unit 0 | Heating and cooling | $384,692 | — | Finaled Nov 7, 2018 | 201807164654 |
| May 8, 2018 | otc alterations permit: 2nd flr -t-24 mechanical to install new lighting mechanical, and plumbing systems on 2nd flr. installing 2 heat pumps, 10 vav boxes, low pressure duct work and condesor water piping. ref 201804095852 maher na unit 0 | Heating and cooling | $697,928 | — | issued | 201805078364 |
| Nov 28, 2017 | otc alterations permit: 5/f -mechanical & electrical work for tenant imnprovement; ref #201710110935 unit 0 | Electrical | $5,000 | — | issued | 201711174222 |
| Oct 31, 2017 | otc alterations permit: ref app# 201710030279 to install pressure duct work. install 2 new supply grill. rebalance the valves. n/a for maher unit 0 | Heating and cooling | $20,000 | — | Finaled Nov 22, 2017 | 201710302593 |
| Oct 6, 2017 | otc alterations permit: selective demo of light fixture, construct of non-load structural partition. relocate 2 supply register and 3 return register. no title 24 required.electrical: install 2 new walls seconces in office 106. no title 24 required. n/a for maher unit 0 | Electrical | $35,000 | — | Finaled Jan 17, 2018 | 201710030279 |
| Aug 2, 2017 | otc alterations permit: fire alarm work for the "arent fox" remodel on floor 20; additions are 5 duct detectors, 1 module, 4 speaker/strobes and the relocation of 4 speaker/strobes. ref pa 2017-0614-9292. maher na unit 0 | Heating and cooling | $5,350 | — | Finaled Oct 12, 2017 | 201708023601 |
| Jun 29, 2017 | otc alterations permit: electrical revision to pa 2017-0425-4878 & mep permit 2017-0214-9322. alter description of light fixtures & delete fixtures, ref pa 2016-1130-3736 unit 0 | Electrical | $1 | — | issued | 201706290747 |
| Jun 29, 2017 | otc alterations permit: t-24 electrical to relocate and replace lighting fixture on floors 19,22,23,25, & 26. please refer to app#201704204443 for t.i. work unit 0 | Electrical | $150,000 | — | Finaled Apr 12, 2018 | 201706098960 |
| Apr 25, 2017 | otc alterations permit: electrical revision to mep pa 2017-0214-9322. alter description of light fixtures ref pa 2016-1130-3736. n/a for maher unit 0 | Electrical | $1 | — | issued | 201704254878 |
| Mar 2, 2017 | otc alterations permit: mechanical & electrical for ti on the 5th floor. ref pa 2016-1130-3736 unit 0 | Electrical | $98,000 | — | Finaled Aug 24, 2017 | 201702149322 |
| Jan 10, 2017 | otc alterations permit: 0n 6th floor - fire alarm work for kpmg remodel. additions are 6 smoke detectors, 3 duct detectors, 1 strobe power supply, 33 speaker/strobes, 6 strobes unit 0 | Heating and cooling | $27,420 | — | Finaled Apr 21, 2017 | 201701106796 |
| Feb 1, 2016 | otc alterations permit: 1/f:fire alarm work for spmf care center ti project on floor 1, additions are 1 smoke det, 1 duct detector,21 speaker strobes, and 4 strobes unit 0 | Heating and cooling | $13,700 | — | Finaled Jun 13, 2016 | 201602018426 |
| Nov 20, 2015 | otc alterations permit: interior renovations at ground floor level. full demo of tenant space. all new partitions, finishes, flooring , doors, ceilings, casework and new mechanical, electrical, & plumbing. 2 new bathrooms. deferred submittal for structural flooring system unit 0 | Plumbing | $800,000 | — | Finaled Jun 21, 2016 | 201509237786 |
| Oct 29, 2015 | otc alterations permit: fire alarm work for the "monster" ti remodel on floor 3; additions are 1 smoke detector, 2 duct detectors, 2 modules, 16 speaker/strobes, and 4 speakers. ref pa 2015-0916-7144. maher na unit 0 | Heating and cooling | $12,800 | — | Finaled Dec 2, 2015 | 201510291092 |
| Oct 7, 2015 | otc alterations permit: 3rd floor: provide cubicles, add two offices, provide i.t. room. minor lighting modifications, install 2 water cooled heat pump, provide power to servers. maher na unit 0 | Heating and cooling | $190,000 | — | Finaled Apr 1, 2016 | 201509167144 |
| Feb 27, 2015 | otc alterations permit: fire alarm work for the floor 8"kpmg" ti remodel, additions are 7 smoke detectors, 5 duct detectors, 3 speakers, 32 speaker/strobes and 8 strobes maher - not req'd unit 0 | Heating and cooling | $27,250 | — | Finaled May 28, 2015 | 201502279486 |
| Feb 27, 2015 | otc alterations permit: fire alarm work for the floor 7"kpmg" ti remodel, additions are 4 smoke detectors, 5 duct detectors, 4 speakers, 36 speaker/strobes and 13 strobes maher - not req'd unit 0 | Heating and cooling | $31,500 | — | Finaled May 28, 2015 | 201502279485 |
| Jan 7, 2015 | otc alterations permit: 3rd floor: interior demo of extg ceiling grid and tile , extg flex hvac ducting, extg lighting fixtures, carpet, vct etc unit 0 | Heating and cooling | $15,000 | — | Finaled May 14, 2015 | 201411191934 |
On 02nd St
395 permits on record on 02nd St.
| Trade | Permits | Since Oct 2, 2024 | Median declared | Range | Last |
|---|---|---|---|---|---|
| Roofing | 37 | 7 | $80,000 | $32,380–$480,107 | Oct 29, 2025 |
| Heating and cooling | 143 | 8 | $42,000 | $3,256–$89,236 | May 18, 2026 |
| Electrical | 131 | 15 | $40,000 | $13,100–$162,000 | Sep 10, 2026 |
| Plumbing | 79 | 8 | $323,125 | $28,970–$670,993 | Aug 5, 2026 |
| Solar | 3 | 1 | — | under 5 | Apr 1, 2025 |
| Water heater | 2 | 0 | — | under 5 | Sep 18, 2020 |
Roof replacement cost in San Francisco
Across 5,921 one- and two-family reroof permits since October 2, 2024, most declared values run from $7,700 to $32,000 (the middle 80%); the median is $15,000 and half fall between $10,800 and $21,770. The lowest on record is $1 and the highest $4,315,170. Every permit behind that range.
Furnace, heat pump or air conditioner replacement cost in San Francisco
Across 292 one- and two-family heating and cooling permits since October 2, 2024, most declared values run from $1 to $224,154 (the middle 80%); the median is $25,098 and half fall between $5,000 and $115,240. The lowest on record is $1 and the highest $1,600,000. Every permit behind that range.