08th St, San Francisco: permits on record
68 home-service permits on record on 08th St since May 21, 2015, 13 of them since October 2, 2024, at 24 addresses. Home-service permits only (roofing, heating and cooling, solar, electrical, plumbing, water heaters); other building permits are kept in the record and not shown. Permits are listed without house numbers; each address has its own page below.
Roofing: 19 permits
From Dec 12, 2016 to May 7, 2026. Across 5 roofing permits since October 2, 2024, most declared values run from $14,931 to $275,012 (the middle 80%); the median is $50,000 and half fall between $35,000 and $110,029. The lowest on record is $1,552 and the highest $385,000.
Since October 2, 2024, 5 listed below. Earlier permits, 14, are on their house pages: 2023: 1 · 2022: 5 · 2021: 1 · 2019: 2 · 2018: 1 · 2017: 3 · 2016: 1.
| Issued | Work | Building | Declared value | Contractor as filed | Permit |
|---|---|---|---|---|---|
| May 7, 2026 | otc alterations permit: partial tenant improvement at 4/f suite, equipment at idf & mdf rooms, fence @ mdf room, remove & replace card readers, mechanical units for idf and mdf @ roof. accessibility upgrades @ all gender room, 1st flr entry and roof parking | office | $110,029 | — | 202604099181 |
| Apr 14, 2026 | otc alterations permit: comply with nov 202652635- to repair glass on guardrail in kind like for like located on roof | apartments | $1,552 | — | 202604149391 |
| Apr 6, 2026 | ReRoof: re-roofing. hot works | office | $35,000 | — | 202604038888 |
| Mar 31, 2026 | ReRoof: reroofing no hot works | power plant | $385,000 | — | 202603318581 |
| Jun 2, 2025 | ReRoof: reroofing- install class a modified bitumen roofing system 3800 sq ft. | apartments | $50,000 | — | 202506027670 |
Electrical: 30 permits
From May 21, 2015 to Jul 28, 2026. Fewer than 5 electrical permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.
Since October 2, 2024, 4 listed below. Earlier permits, 26, are on their house pages: 2023: 2 · 2022: 2 · 2020: 2 · 2019: 8 · 2018: 1 · 2017: 1 · 2016: 9 · 2015: 1.
| Issued | Work | Building | Declared value | Contractor as filed | Permit |
|---|---|---|---|---|---|
| Jul 28, 2026 | otc alterations permit: 4/f: revision to pa# 202604099181- revised scope to include converting an existing conference room and open office area into a work room with fenced area for new equipment. occupant load is decreasing as part of the scope. revised electrical and structrual included | office | $50,000 | — | 202607064547 |
| Jun 5, 2026 | otc alterations permit: to pge substation building including int renovations to 1700 sf for a new ocarea, hddlbreak area and rrs. upgrades to mechanical, electrical, and break area, rrs. upgrades to mep. ext improvements include replacement ofoverhead garage door, accessible entry and pot and van access parking | power plant | $1,200,000 | — | 202606052614 |
| Jun 3, 2026 | additions alterations or repairs: fleet charge station/parking lot: demo of pavement and structures 2 site grading,storm draining, paving, desiment and erosion control.housekeeping pad and fountain design of structure & equiment site lighting,electrical service and comm infrastructure.install 8ft fence & shade canopies,gate open | parking lot | $3,361,665 | — | 202510248111 |
| Dec 9, 2024 | sign - erect: install electric sign e01 "wells fargo" | lending institution | $10,000 | — | 202411124774 |
Heating and cooling: 12 permits
From May 21, 2015 to Aug 6, 2025. Fewer than 5 heating and cooling permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.
Since October 2, 2024, 1 listed below. Earlier permits, 11, are on their house pages: 2024: 1 · 2023: 2 · 2021: 1 · 2020: 1 · 2019: 1 · 2017: 1 · 2016: 3 · 2015: 1.
| Issued | Work | Building | Declared value | Contractor as filed | Permit |
|---|---|---|---|---|---|
| Aug 6, 2025 | otc alterations permit: fire alarm t.i. on 2nd flr - replace 3 conventional smake def w/addressable, add 6 smoke det. revised 1 monitoring module and power supply. replace 3 h/s add 1 h/s, add 1 duct def w/relay for heat pump and remove 1 frame det. ref#: 202505287353 | school | $12,144 | — | 202508012134 |
Plumbing: 5 permits
From Jul 26, 2018 to Mar 26, 2026. Fewer than 5 plumbing permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.
Since October 2, 2024, 2 listed below. Earlier permits, 3, are on their house pages: 2019: 2 · 2018: 1.
| Issued | Work | Building | Declared value | Contractor as filed | Permit |
|---|---|---|---|---|---|
| Mar 26, 2026 | otc alterations permit: tenant improvement including non-structural wall partitions, plumbing, lighting, mechanical, and finishes | office | $2,140,000 | — | 202602266604 |
| Jan 20, 2026 | additions alterations or repairs: submittal to plumbing inspection division for adminstrative review of stormwater control plans associated with sfpuc storm water control plan | parking lot | $1 | — | 202504285362 |
Solar: 2 permits
From Jan 24, 2022 to Jul 2, 2026. Fewer than 5 solar permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.
Since October 2, 2024, 1 listed below. Earlier permits, 1, are on their house pages: 2022: 1.
| Issued | Work | Building | Declared value | Contractor as filed | Permit |
|---|---|---|---|---|---|
| Jul 2, 2026 | otc alterations permit: installation of a new tier 3 standby generator on a new concrete pad at the exterior and replacement of light fixtures w/ new light fixtures w/ battery backup | power plant | $120,000 | — | 202607024476 |
Addresses on this street with a page
Source
San Francisco Department of Building Inspection, via DataSF, pulled nightly. As of October 2, 2026. Storm dates touching this street will appear here once the hail record is attached.