Avila St, San Francisco: permits on record
55 home-service permits on record on Avila St since February 25, 2015, 8 of them since October 2, 2024, at 39 addresses. Home-service permits only (roofing, heating and cooling, solar, electrical, plumbing, water heaters); other building permits are kept in the record and not shown. Permits are listed without house numbers; each address has its own page below.
Roofing: 45 permits
From Feb 25, 2015 to Oct 1, 2025. Fewer than 5 roofing permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.
Since October 2, 2024, 4 listed below. Earlier permits, 41, are on their house pages: 2024: 1 · 2023: 6 · 2022: 4 · 2021: 7 · 2020: 1 · 2019: 6 · 2018: 4 · 2017: 4 · 2016: 2 · 2015: 6.
| Issued | Work | Building | Declared value | Contractor as filed | Permit |
|---|---|---|---|---|---|
| Oct 1, 2025 | ReRoof: roofing no hot work | 1 family dwelling | $47,655 | — | 202510016471 |
| Jun 9, 2025 | ReRoof: re-roof. no hot work | 1 family dwelling | $10,000 | — | 202506098197 |
| May 20, 2025 | ReRoof: re-roofing hot works | 1 family dwelling | $16,500 | — | 202505206839 |
| Apr 29, 2025 | ReRoof: reroof, no hot works | 1 family dwelling | $18,600 | — | 202504245153 |
Plumbing: 7 permits
From Dec 14, 2018 to May 7, 2026. Fewer than 5 plumbing permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.
Since October 2, 2024, 4 listed below. Earlier permits, 3, are on their house pages: 2020: 1 · 2019: 1 · 2018: 1.
| Issued | Work | Building | Declared value | Contractor as filed | Permit |
|---|---|---|---|---|---|
| May 7, 2026 | otc alterations permit: remove brick in backyard. digout and prepare substrate 8-10" and grade, replace gas line to bbq island and extend for fire pit. trench for new water line for 3/4" mht hose bib, sperad layer of 3/4" open graded aggregate, compact,and arrange geogird for stabilization. fill with 6 | 1 family dwelling | $38,728 | — | 202605070843 |
| Nov 25, 2025 | otc alterations permit: swimming pool remodel - new tile, plaster, cover, pool equipment and plumbing. shall comply with cf2r-plb-02-e | 1 family dwelling | $72,000 | — | 202511250443 |
| Oct 29, 2025 | otc alterations permit: revision to pa # 2022-921-2892 & 2025-0124-9064: revise layout of primary suite and bathroom. revise steps into main level living room. no plumbing fixtures | 1 family dwelling | $1 | — | 202510288310 |
| Apr 17, 2025 | otc alterations permit: level 1 demo bedroom, bath, closet, new non structural partitions, mech, lighting, power, plumbing, finishes for new bedroom and bath. no structural work. 500 sq ft. no change of conditional space sf | 1 family dwelling | $116,052 | — | 202503263088 |
Water heater: 2 permits
From Mar 9, 2015 to Feb 13, 2019. Fewer than 5 water heater permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.
Since October 2, 2024, 0 listed below. Earlier permits, 2, are on their house pages: 2019: 1 · 2015: 1.
| Issued | Work | Building | Declared value | Contractor as filed | Permit |
|---|
Heating and cooling: 1 permit
From Oct 9, 2018 to Oct 9, 2018. Fewer than 5 heating and cooling permits since October 2, 2024 carry a declared value, so no range is computed; the rows are below.
Since October 2, 2024, 0 listed below. Earlier permits, 1, are on their house pages: 2018: 1.
| Issued | Work | Building | Declared value | Contractor as filed | Permit |
|---|
Addresses on this street with a page
Source
San Francisco Department of Building Inspection, via DataSF, pulled nightly. As of October 2, 2026. Storm dates touching this street will appear here once the hail record is attached.