Permits Index

Home-service permits on record at this address

IssuedWorkTradeDeclared valueContractor as filedStatusPermit
Sep 24, 2024otc alterations permit: 20th floor- fire alarm: 1 duct detector, 2 relay modules - av shutdown and hvac shudder and 1 ceiling speaker strobe to be added. pa ref#: 202408138510Heating and cooling$4,840—Finaled Jan 8, 2025202409241461
Sep 12, 2024otc alterations permit: lobby-ref 201902011833- fire alarm as built to show additional duct detectors and 3 additional relay module for fsdHeating and cooling$9,837—issued202409100412
Jun 14, 2024otc alterations permit: 12th/fl- office ti to include upgrades to ceo office , mech and electrical upgrades, non structural work, soft demoElectrical$184,000—Finaled Sep 25, 2024202406134353
Sep 13, 2023otc alterations permit: interior tenant improvement basement floor. demo & construction of non-structural partitions, ceilings, finishes, lighting, mechanical & electricalElectrical$391,000—Finaled Sep 3, 2024202204293259
Jun 16, 2022otc alterations permit: roof: replace cooling tower and pumps or roofRoofing$300,000—issued202010297709
Jul 1, 2021otc alterations permit: install new water source heat pump unitHeating and cooling$20,000—issued202107013598
Jun 21, 2021otc alterations permit: fire alarm project on 1st floor 2 duct detectors 2 relays 1 monitor module 7 strobesHeating and cooling$9,800—Finaled Aug 23, 2021202105190614
Jun 8, 2021otc alterations permit: modify existing fire alarm system, new devices added for proper coverage: duct detectors, monitor module, relay modules, strobes , speaker/strobes; ref ti # 2019 1121 7838Heating and cooling$6,018—issued202105039701
Mar 23, 2021otc alterations permit: fire alarm asbuilt; asbuilts to show 2 added devices and relocation of devices per the field. all new and existing devices to be connected to existing facu. 45 new strobes, 2 weather proof strobes, 13 ceiling strobe, 7 relay module, 1 control module, 2 duct detector, 1 nac panel. permit referenceHeating and cooling$1—Finaled May 7, 2021202102184962
Dec 31, 2020otc alterations permit: fire alarm; 1 duct detector to be added to existing facuHeating and cooling$500—Finaled Mar 9, 2021202010237297
Jul 6, 2020otc alterations permit: 23rd floor: fire alarm 45 ceiling speaker strobes, 2 weatherproof ceiling strobes, 13 ceiling strobes, and 2 duct detectors to be added to extg facuHeating and cooling$31,000—Finaled Apr 8, 2021202006309414
Jun 23, 2020otc alterations permit: 5th fl - installing duct and hvac as shown 5m2.1Heating and cooling$5,000—issued202003167114
Oct 16, 2019sign - erect: install electric single faced wall sign "equinox"Electrical$4,000—issued201907196384
Oct 16, 2019sign - erect: install electric double faced projecting sign "equinox"Electrical$7,000—issued201907196383
Oct 10, 2019otc alterations permit: 3/f: fire alarm: 1 duct detector, 1 ceiling-speaker strobe to be added to existing facuHeating and cooling$1,500—Finaled Dec 31, 2020201910104099
May 10, 2019otc alterations permit: 3rd floor: 3 return air smoke detectors, 1 duct detector, 28 ceiling mount speaker/srobes, 5 ceiling mount strobes. t.i app#201903145206 n/a for maherHeating and cooling$18,500—Finaled Jul 19, 2019201905100302
Apr 10, 2019otc alterations permit: 3/f: mechanical, electrical & plumbing plans for pa201903145206. maher n/aPlumbing$1—Finaled Oct 4, 2019201903215880
Feb 19, 2019otc alterations permit: 10th fl - plumbing work for related mep and ti ref pa 2018-1016-3352 and 2018-1031-4645Plumbing$1—issued201901220844
Feb 11, 2019otc alterations permit: 3rd floor: demo of existing partitions, doors, millwork, electrical, plumbing, ceiling light, 4 finishes, new demising partisions, doors & finishes no structural work to be performed - maher n/aPlumbing$450,000—Finaled Sep 26, 2019201901301581
Jan 16, 2019otc alterations permit: exterior "living wall" project w/ associated electrical, plumbing and structural steel framePlumbing$26,000—issued201811065071
Sep 20, 2018otc alterations permit: revision to 201806252791. demolition of concrete pads, curbs, and struc slab infill. new partitions added to electrical room floor current unoccupied ti life safety and sprinkler modification under sep permit per ab-017Electrical$20,000—Finaled Apr 2, 2019201809139932
Aug 21, 2018otc alterations permit: ground fl: change out fire sprinklers per tenant improvements. #18-690. ref #201807134497Heating and cooling$15,075—Finaled Aug 27, 2018201807265665
Aug 13, 2018otc alterations permit: 2nd fl; ref pa#201806252791; change out fire sprinklers per t.iHeating and cooling$3,375—Finaled Nov 8, 2022201808137144
Aug 13, 2018otc alterations permit: 3rd fl: change out fire sprinklers per t.i. bpa#201806252793Heating and cooling$13,050—Finaled Nov 8, 2022201808137142
May 25, 2018otc alterations permit: 10th floor: demolition of non-structural partitions, ceiling, lighting, finishes, and any associated plumbing, mechanical and electrical. additions include new paint finish, elect. fixtures, & accessibility upgrades in restrooms. n/a for maherPlumbing$400,000—Finaled Oct 12, 2018201805239965
May 11, 2018otc alterations permit: 8th fl: mechanical and electrical for pa #201803063023.& pa 201805027980 maher naElectrical$1—Finaled Sep 24, 2018201804257363
Jan 31, 2018otc alterations permit: 5th floor: demo of partitions and associated electrical and ceiling work construction of new partitions, doors, sink, finishes, electrical within ext full floor tenant suite. mep, sprinkler and life safety system under seperate permit. n/a for maherElectrical$250,000—Finaled Oct 16, 2018201801309850
Dec 2, 2016otc alterations permit: 4th flr: construction of new partitions, doors, finishes, electrical and lighting relocation. electrical, mechanical and sprinkler upgrades under seperate permit mahr naElectrical$90,000—Finaled Aug 23, 2018201611213282
Nov 30, 2016otc alterations permit: 8th & 9th floors: demo of non structural partitions, ceiling, lighting, millwork, finih\shes, elect fixtures, plumb fixtures and mechanical maher na, tenant improvement under separate permit per ab-017Plumbing$350,000—Finaled Mar 6, 2017201611233450
Nov 17, 2016otc alterations permit: 7th floor: demo non structural partitions, ceilings, lighting, millwork, finishes, electrical fixtures, plmg fixtures, mechanical construction. non-structural partitions, ceilings, lighting, electrical fixtures and mechanical. n/a for maher. core & shell work unfinish floor onlyElectrical$650,000—Finaled Mar 6, 2017201611072160
Nov 1, 2016additions alterations or repairs: as-built revision to pa #201506048143, revised battery calcs and fire alarm devices from basement ti addedSolar$1—issued201603141964
Oct 12, 2016otc alterations permit: 13/ f - relocate light fixtures for new rr & misc. outlets with minor hvac supply changes to mother's room and restroom. t.i. ref pa#201609228495. n/a ordinance #155-13Heating and cooling$23,000—Finaled Mar 9, 2017201610119890
Oct 6, 2016otc alterations permit: 13/f- new all gender/unisex accessible restroom & mother's room. includes new plumbing, finishes & acceosries and electrical. ceiling system to remain & relocate light fixtures. relocate millwork, sink & faucet from 12th floor to 13/f. n/a ordinance #155-13Plumbing$100,000—Finaled Mar 9, 2017201609228495
Apr 20, 2016otc alterations permit: basement: t-24 electrical for work done under bpa#201601278085Electrical$22,700—Finaled Feb 2, 2018201604184995
Feb 2, 2016otc alterations permit: commercial t.i. consisting of demolition of finishes and electrical, power/data, construction of new non-structural partitions, electrical fixtures, plumbing, millwork, doors/frames/hardware and associated mechanical. mep. deferred. n/a ordinance #155-13Plumbing$210,000—Finaled Oct 4, 2016201601278085
Aug 17, 2015additions alterations or repairs: new voluntary, 1 for 1 fire alarm sys replacement in bldg to incl 1 face,1 smoke control panel,1 voice panel,2 annunciators,27 monitor modules,45 dual monitor modules,11 relay modules,25 control modules,111 pule stations,299 smoke detectors,84 duct detectors,36 fire fighter phone jacks.maher n/aHeating and cooling$350,000—issued201506048143
Aug 11, 2015otc alterations permit: 4th flr: t-24 electrical for work done under pa 201504214167; maher n/aElectrical$7,575—issued201508113889
Aug 11, 2015otc alterations permit: electrical t-24 for work done under pa 201502249127; maher n/aElectrical$24,270—Finaled Jun 6, 2016201508113886
Jul 22, 2015otc alterations permit: electrical work for t.i. pa#201506027789. n/a ordinance# 155-13Electrical$355,725—Finaled Jan 6, 2016201507222100
Jul 21, 2015otc alterations permit: fire alarm ti on 6 fl: remove 11 speaker/strobes and 1 smoke detector, upgrade 9 speake/strobes and 1 strobe booster, 44 speaker/strobes, 1 control module, 6 rib relay, 2 door holders, 2 emergency release buttons, 3 duct detectors, 3 control relays. ref 2015-0520-6795Heating and cooling$32,896—Finaled Jan 6, 2016201507211992
Jul 21, 2015otc alterations permit: fire alarm ti on 11th fl: remove 12 speaker/strobes, 4 strobes, upgrade 1 strobe booster, 48 speaker/strobes, install 1 control module, 13 rib relay, 12, duct detectors, 2 control relays. ref 2015-0602-7789Heating and cooling$34,952—Finaled Jan 6, 2016201507211991
Jul 21, 2015otc alterations permit: 11th floor: mechanical and electrical work for t.i. ref app#2015-0602-7789. compliance with maher ordinance no 155-13 not requiredElectrical$1,000,000—Finaled Jan 6, 2016201507080898
Jul 9, 2015otc alterations permit: 6th floor: electrical and lighting work for t.i. ref app#201505206795. n/a for the maherElectrical$400,000—Finaled Jan 6, 2016201507080899
Jun 18, 2015otc alterations permit: 4th floor: demolition of partitions and associated electrical, doors and finishes. constructionof new partitions, finishes, electrical and doors/lighting relocation/ electrical upgrades under separate permit. mechanical, plumnbing or sprinkler work is not required. maher n/aElectrical$60,000—Finaled Sep 21, 2015201504214167
Apr 2, 2015otc alterations permit: 12th & 13th flr fire alarm- 12th fl:add 35 speaker/strobes,1 smoke detector.replace 1 strobe power supply,9 smoke det,1 strobe module,6 door holders. 13th fl:add 37 speaker/strobe,2 duct det,3 control relays,3 pilot relays,3 monitor modules.replace 1 storbe power supply,9 smoke det, strobe moduleHeating and cooling$60,000—Finaled May 8, 2015201503261920
Mar 13, 2015otc alterations permit: 12th and 13th floors: electrical distribution to plugs and lights, wshp. ref app#201502208872 and 201502208865. n/a for the maher ordinanceElectrical$500,000—Finaled May 8, 2015201503100415
Mar 13, 2015otc alterations permit: install 3 heat pumps, 2 fans, 9 variable air volume boxesHeating and cooling$1—Finaled May 11, 2015201501165922
Feb 3, 2015otc alterations permit: 12 th fl replace heat pump 2 fans, 2 boxes, 6 201411242376 maher not reqHeating and cooling$218,077—Finaled May 11, 2015201501165920

On Beale St

106 permits on record on Beale St.

TradePermitsSince Oct 3, 2024Median declaredRangeLast
Roofing70—under 5Jan 26, 2023
Electrical371—under 5Feb 14, 2025
Heating and cooling370—under 5Sep 24, 2024
Plumbing241—under 5Apr 30, 2025
Solar10—under 5Nov 1, 2016

Roof replacement cost in San Francisco

Across 5,896 one- and two-family reroof permits since October 3, 2024, most declared values run from $7,650 to $32,000 (the middle 80%); the median is $15,000 and half fall between $10,788 and $21,763. The lowest on record is $1 and the highest $4,315,170. Every permit behind that range.

Furnace, heat pump or air conditioner replacement cost in San Francisco

Across 291 one- and two-family heating and cooling permits since October 3, 2024, most declared values run from $1 to $224,616 (the middle 80%); the median is $25,196 and half fall between $5,000 and $116,433. The lowest on record is $1 and the highest $1,600,000. Every permit behind that range.

Source

San Francisco Department of Building Inspection, via DataSF, pulled nightly; the assessor roll for the property fields. As of October 3, 2026. Owner names are not shown on any page.