100 home-service permits on record at 185 Berry St, San Francisco; the roof was last permitted on May 17, 2024 at a declared value of $20,000.
Home-service permits on record at this address
| Issued | Work | Trade | Declared value | Contractor as filed | Status | Permit |
|---|---|---|---|---|---|---|
| Sep 14, 2026 | otc alterations permit: renovation of suite 350, for new lab space. demo select partitions and doors. installation of new lab equipment and new lab furniture system. rated doors and new sinks and existing finishes to be patched where applicable. minor modification to existing electrical, mechanical, plumbing systems | Plumbing | $500,000 | — | issued | 202512111564 |
| Jun 12, 2026 | otc alterations permit: provide mechanincal and electrical for pa#2025-1208-1164 | Electrical | $90,000 | — | issued | 202606092838 |
| Feb 26, 2026 | otc alterations permit: 1/fl- ste 150. deferred mechanical and electrical for office suite demising wall ti. ref 202511139547 | Electrical | $10,000 | — | Finaled Jun 9, 2026 | 202602266550 |
| Oct 8, 2025 | otc alterations permit: #4000 mechanical demo & revise existing ductwork furnish & install 1 new duct & diffusers, rebalance existing terminal units ref pa 202507221346 | Heating and cooling | $15,000 | — | Finaled Feb 5, 2026 | 202509105024 |
| Sep 24, 2025 | otc alterations permit: #3000 mechanical demo & revise existing ductwork furnish & install 1 new duct & diffusers, rebalance existing terminal units ref pa 202507231432, new lighting in open office 108 and 111 only | Heating and cooling | $15,000 | — | Finaled Feb 5, 2026 | 202509105026 |
| Aug 5, 2025 | otc alterations permit: #3000: 3rd floor, consists of interior construction. mechanical, electrical, fls, and fire sprinkler work is limited to what is required based on new lighting layout. scope does not affect plumbing fixture quantities, occupant load calculations, or path of travel | Plumbing | $131,148 | — | Finaled Feb 5, 2026 | 202507231432 |
| Aug 5, 2025 | otc alterations permit: suite 1600 - ref ti 202506279624- mech demo revise ductwork and diffusers furnish and install new duct, rebalance terminal. electrical track lighting fixtures, and circuiting controls | Heating and cooling | $25,000 | — | Finaled Nov 26, 2025 | 202507221320 |
| Jul 1, 2025 | otc alterations permit: 1/f suite 1600 interior demolition of non structural elements including but not limited to partition, doors, finishes, ceilings, lighting, mechanical and electrical outlets and switches w/patch repair to match exisiting ref pa# 2019-0614-3465 & ref pa# 2025-0604-7929 | Electrical | $92,432 | — | Finaled Nov 26, 2025 | 202506279624 |
| Jun 26, 2025 | otc alterations permit: ste 4807: l4-furnish & install new duct and diffuser to accomodate new floor plan. demo & revise existing ductwork. office tenant retrofit: lighting fixtures and associated circuting/control, power and signal devices and assoicated wiring. mep permit in ref to #202506047929 | Heating and cooling | $17,532 | — | Finaled Aug 21, 2025 | 202506259469 |
| Jun 6, 2025 | otc alterations permit: replacement of hvac rooftop unit on roof including new structural support structure | Heating and cooling | $100,000 | — | issued | 202506068118 |
| Oct 24, 2024 | otc alterations permit: 6th flr suite 6800. fire alarm: 2 smoke detectors, 3 duct detectors, 5 relay modules, 25 ceiling horn strobes, and 13 strobes to be added to provde paper coverage. permit ref 202406285548 | Heating and cooling | $43,975 | — | Finaled Dec 24, 2024 | 202410243601 |
| Jul 11, 2024 | otc alterations permit: 6/f: interior construction of non structural elements including interior partitions, doors, finishes, ceilings, and lighting. mep deferred. no exterior work proposed. scope of work does not affect plumbing fixture quantities occupany load calcs or path of travel | Plumbing | $2,258,182 | — | Finaled Feb 10, 2025 | 202406285548 |
| May 17, 2024 | additions alterations or repairs: revision to pa# 202206075745. structural portion to change infill details on the roof. added gfrp to add additional structural support | Roofing | $20,000 | — | Finaled Aug 26, 2024 | 202310239259 |
| Mar 7, 2024 | otc alterations permit: ste 5000 - interior demolition of non structural to include partitions, doors, finishes, ceilings, lighting and hvac. ab-017 ref 202403057074 | Heating and cooling | $10,000 | — | Finaled Mar 28, 2024 | 202403067212 |
| Feb 15, 2024 | otc alterations permit: revision to tmobile site pa# 2021-0129-3677. revise electrical scope only. no change to antennas or batteries | Electrical | $1 | — | Finaled Nov 18, 2024 | 202402135790 |
| Oct 5, 2023 | otc alterations permit: 6/f: fire alarm - duct detectors and 2 relay modules will be added to unoccupied floor with minimal coverage | Heating and cooling | $6,600 | — | Finaled Jun 17, 2024 | 202310058101 |
| Sep 28, 2023 | otc alterations permit: suite 1800: fire alarm. 1 remote power supply, 1 smoke detector, 13 duct detectors, 1 control module, 14 relay modules, 9 ceiling strobes, 12 ceiling horn strobes to be added to provide proper coverage. pa#: 202308184755 | Heating and cooling | $10,000 | — | Finaled Oct 30, 2023 | 202309287647 |
| Sep 7, 2023 | otc alterations permit: deferred mechanical, plumbing and electrical plans for first floor suite 1800 tenant improvement. reference permit 202306069337 | Plumbing | $200,000 | — | Finaled May 21, 2024 | 202308184755 |
| Aug 28, 2023 | otc alterations permit: 1/f ste 180b & 190: fire alarm, 5-duct detectors, 5-relay modules, 2-ceiling strobes and 1-ceiling horn strones to be added to provide coverage, ref pa# 2022-0719-8833 | Heating and cooling | $18,431 | — | Finaled May 9, 2024 | 202308083969 |
| Jul 18, 2023 | otc alterations permit: cell site/roof: to abate planninig code violation #2021-001672enf, to legalize, as built conditions | Roofing | $1 | — | Finaled Jul 27, 2023 | 202306210474 |
| Jul 7, 2023 | otc alterations permit: t-mobile is vacating their 9,400 sq ft lease space in the 6th floor of 185 berry street. they will remove: all telecom equipment & electrical conduit serving it. the 4" thick concrete topping slab installed to level the floor. all walls & doors in lease space, ceiling light fixtures, ab-017 | Electrical | $1,400,000 | — | Finaled Aug 26, 2024 | 202206075745 |
| Sep 13, 2022 | otc alterations permit: fire alarm as builts to show 3 added duct detectors. ref permit 202110130354 | Heating and cooling | $1 | — | Finaled Oct 4, 2022 | 202209132343 |
| Aug 24, 2022 | otc alterations permit: demo and replacement of boiler equipment on the roof. wharfside bldg. addition of vfds for e pumps in street side bldg, basement , boiler rm. new equip to be reconnected to e mcc. new panels for 120/240 v controls, circulating pumps. arch ref 202206156409 | Roofing | $95,000 | — | issued | 202208160627 |
| Aug 23, 2022 | otc alterations permit: demo of hot water heat exchanger in basement. install hydronic hot water boilers involves piping from boiler rooms on roof thru telecom vloset at all levels to basement into boiler room | Roofing | $5,000 | — | Finaled Aug 26, 2024 | 202206156409 |
| May 25, 2022 | otc alterations permit: ste 1500: fire alarm this is an addition to the existing fire alarm system. 2 duct detectors, 2 relay modules, 2 ceiling strobes, and y ceiling horn strobes to be added to provide proper coverage pa reference 202205164314 | Heating and cooling | $4,000 | — | Finaled Oct 4, 2022 | 202205254966 |
| May 17, 2022 | otc alterations permit: suite 4815: mechanical, electrical drawings. ref. bpa 202202228467 | Electrical | $95,000 | — | Finaled Dec 13, 2022 | 202205164316 |
| May 17, 2022 | otc alterations permit: suite 1500: mechanical, electrical drawings. ref. bpa 202203149901 | Electrical | $145,000 | — | Finaled Dec 13, 2022 | 202205164314 |
| Apr 25, 2022 | otc alterations permit: ste 6500: non structural demo of interior partition, flooring, casement, drop ceiling, new wall infill. relocate door, existing hvac and lighting systems to remain | Heating and cooling | $6,500 | — | Finaled Oct 6, 2022 | 202204252911 |
| Feb 23, 2022 | additions alterations or repairs: suite 180c: demo of int. partitions, & int. drywall layer & selected furring channels of demising partition & ext. walls, flooring & ceiling systems & unused me systems. construction of complete int. ti to house 2 mri, equip. rm control rm, staff break rm, & modification to mep, plumb & elec | Plumbing | $2,200,000 | — | issued | 202108096037 |
| Nov 4, 2021 | otc alterations permit: 3/f: mechanical and electrical for t.i. under pa 202108236896 | Electrical | $55,000 | — | Finaled Oct 6, 2022 | 202111031730 |
| Sep 20, 2021 | otc alterations permit: new steel duct supports. no site, landscapging, use or parking changes | Heating and cooling | $500,000 | — | Finaled Jun 6, 2022 | 202109208755 |
| Aug 25, 2021 | otc alterations permit: mech - install new wshp, install new duct work, grilles and louver connecting to new and existing wshps, elec - new lighting and branch circuiting to existing panel ref pa# 2020-1113-8822 | Heating and cooling | $1 | — | issued | 202103196945 |
| May 20, 2021 | otc alterations permit: wharfside bldg - 1st fl, suite 1050: remodel of existing office space. scope of work to include selective minor demolition, floor, finishes, painting, ceiling and minor modification to existing mech, elec, fire alarm & plumbing | Plumbing | $150,000 | — | Finaled Nov 29, 2021 | 201911127077 |
| Feb 24, 2021 | otc alterations permit: fire alarm. 4 duct detectors to be added to ahv l-3. to be added to existing facu | Heating and cooling | $10,600 | — | Finaled Nov 4, 2021 | 202101213091 |
| Feb 11, 2021 | otc alterations permit: fire alarm; 1 duct detector to be added to ahv-4 to provide proper coverage to be added to existing facu. permit reference # 2020-10-17-6719 | Heating and cooling | $1,000 | — | Finaled Nov 9, 2021 | 202101142734 |
| Feb 10, 2021 | otc alterations permit: ste 170: title 24. electrical & mechanical work under pa# 202010076109 | Electrical | $115,000 | — | issued | 202101213053 |
| Jan 11, 2021 | otc alterations permit: 3/f: mechanical & electrical for t.i. on 3/f: ref pa202006299310. maher n/a | Electrical | $275,000 | — | Finaled Mar 12, 2021 | 202010237291 |
| Jan 6, 2021 | otc alterations permit: remodel and replacement of air handling systems includ associated electrical & support struct & footings. no site, landscaping, use or parking changes are proposed | Electrical | $5,000,000 | — | Finaled Dec 10, 2021 | 202011209437 |
| Dec 22, 2020 | otc alterations permit: replace supply and return fans for ahu-4. add osa monitoring station. no change to extg main service. one new panel board wall be scried from an motor control counter | Electrical | $1,470,000 | — | Finaled Apr 1, 2022 | 202010176719 |
| Nov 5, 2020 | otc alterations permit: selected demo, new partitions, doors, frames, hardware, power, data, light fixtures, patching and repairing existing finishes and ceiling grid. mech - install 1 new vav box, revise duct work for new floor plan. elec. - wiring and controls | Heating and cooling | $750,000 | — | Finaled Dec 30, 2020 | 202009194523 |
| Jul 10, 2020 | otc alterations permit: 3rd fl - added 7 sprinklers, relocated 101 sprinklers, change out 120 sprinklers, removed 30 sprinklers. total 228 sprinklers | Heating and cooling | $22,500 | — | Finaled Oct 15, 2020 | 202007089826 |
| Dec 23, 2019 | otc alterations permit: removal & infill of service elevator & market ready the suite where the elevator is located for lease to tenants, remove all mechanincal, elec, & plumbing system, and cap off the ceiling at the wall boundiary n/a maher | Plumbing | $657,000 | — | Finaled Aug 16, 2021 | 201911157440 |
| Oct 1, 2019 | otc alterations permit: 1st & 2nd fl - ti includes demo of non-structural partitions and build back non-structural partitions. mechanical & electrical included | Electrical | $1,069,000 | — | Finaled Jan 22, 2020 | 201908219459 |
| Aug 1, 2019 | otc alterations permit: title 24 electrical, add new breaker to e em panel, new 200 a fm panel | Electrical | $3,000 | — | issued | 201908017552 |
| May 22, 2019 | otc alterations permit: project consists of selective demo of power, light fixtures + upper cabinets millwork. construction of new ceiling soffit new and relocated power, new lighting fixture and relocation of millwork, suiteis currently occupied. electrical, life safety+ fire protection under separate permit | Electrical | $40,000 | — | Finaled Jun 5, 2019 | 201904248789 |
| May 10, 2019 | otc alterations permit: mechanical and electrical for tenant iprovement at suite 550 ref 201901099891 | Electrical | $40,000 | — | Finaled Jul 16, 2019 | 201905080081 |
| May 7, 2019 | otc alterations permit: suite 6600. mechanical and electrical for tenant improvement. ref arch 201902203315 | Electrical | $80,000 | — | Finaled Jul 16, 2019 | 201905069768 |
| May 6, 2019 | otc alterations permit: fire alarm t.i. 6 relay mods, 6 duct detectors, 28 ceiling mount horn / strobes, 24 ceiling mount strobes, 5 wall mount horn / strobes, 6 wall mount strobes. to be added to system. facu. ref pa 201902072314 | Heating and cooling | $37,500 | — | issued | 201905069777 |
| Mar 14, 2019 | otc alterations permit: 4th flr. mech and electric for tenant improvement. ref pa 201902062172 and 201808278369 | Electrical | $50,000 | — | Finaled Jun 27, 2019 | 201903044259 |
| Oct 17, 2018 | otc alterations permit: 3rd flr. mechanical and electrical work for tenant improvement. ref arch 201808278367. maher n/a | Electrical | $95,000 | — | Finaled Jan 30, 2019 | 201810163327 |
| Jun 13, 2018 | otc alterations permit: fire alarm roof-install 1 rps, 1 smoke detector and 4 horn strobes to be connected to existing fa panel | Roofing | $4,000 | — | issued | 201806131731 |
| May 15, 2018 | otc alterations permit: ti - 5 smk det, 2 rps, 9 moduals, 31 duct det, and 103 audiovisual devices to be hooked up to system. ref 201802201675 maher na | Heating and cooling | $30,000 | — | Finaled Jun 27, 2018 | 201805159080 |
| Mar 5, 2018 | otc alterations permit: install power at 3 new car chargers. electrical drawings only ref pa 2017-0727-3111 | Electrical | $19,500 | — | issued | 201803052803 |
| Feb 22, 2018 | otc alterations permit: barrier removal project work includes: restroom upgrades for finishes and fixtures per 2016 cbc. 1 pair of restrooms at the wharfside building. lobby 1 no mechanical or sprinkler upgrades. electrical and life safety upgrades will be submitted under sep. permit. maher na | Electrical | $70,000 | — | Finaled Mar 13, 2019 | 201802161513 |
| Feb 22, 2018 | additions alterations or repairs: construct an expansion to mechanical penthouse to accomodate the pumps for new cooling towers & part of central plant upgrade for building. new mech penthouse will be same hight as mech penthouse. ** maher: n/a ** | Roofing | $4,037,000 | — | Finaled Mar 20, 2019 | 201710060646 |
| Feb 22, 2018 | otc alterations permit: parking: intallation of new evcs charges; modification of two existing ada parking stalls to become evc stations per 2016 cbc 11b-228.3 and 11b-812 requirements. electrical/electrical mods will be submited under sep permits | Electrical | $12,000 | — | issued | 201707273111 |
| Jan 16, 2018 | otc alterations permit: demolish existing per ab-017. demo walls, doors, casework, handwash sinks, e column to remain. safe off mep, remove e electrical equp, device, luminaries. pre balanace before removing piping and equip. maher na | Electrical | $70,000 | — | Finaled Mar 14, 2018 | 201801168716 |
| Dec 11, 2017 | otc alterations permit: berry st building: electrical - lighting upgrades for restrooms: restrooms total: level 3 - lobby 4 & lobby 6, level 2 - lobby 4 and lobby 6, level 1 - lobby 2, 4 & 6. ref ti #201705176865. maher na | Electrical | $115,000 | — | issued | 201712085897 |
| Dec 11, 2017 | otc alterations permit: wharf side building: electrical - restrooms upgrade - replace light fixtures with new in the following restrooms: in 6th fl lobby #1 and in 6th fl lobby #3. ref ti #201705176861. maher na | Electrical | $35,000 | — | issued | 201712085896 |
| Oct 31, 2017 | otc alterations permit: wharf bldg: like for like grille change out in 4 restrooms. ref pa #201705176861. maher na | Heating and cooling | $25,000 | — | issued | 201710312790 |
| Oct 31, 2017 | otc alterations permit: berry bldg: like for like grille change out in 14 restrooms. ref pa #201705176865. maher na | Heating and cooling | $50,000 | — | issued | 201710312788 |
| Oct 26, 2017 | otc alterations permit: 5/f- mechanical and electrical for tenant improvement on the 5th fl ref pa#201708164958. maher not req | Electrical | $95,000 | — | Finaled Aug 14, 2018 | 201710121030 |
| Sep 22, 2017 | otc alterations permit: roof, elevator machine room- fire alarm t.i. add relay modules for alt recall and firefighters hat activation. n/a ordinance #155-13 | Roofing | $4,000 | — | Finaled Oct 31, 2017 | 201709229303 |
| Sep 21, 2017 | otc alterations permit: change out sprinkler heads to new as part of restroom renovation ref 201705176861. n/a for maher | Heating and cooling | $2,500 | — | Finaled Jan 9, 2020 | 201709219245 |
| Sep 21, 2017 | otc alterations permit: change out sprinkler heads to new as part of restroom renovation ref 201705176865. n/a for maher | Heating and cooling | $8,500 | — | Finaled Jan 9, 2020 | 201709219243 |
| Sep 12, 2017 | sign - erect: single faced electric sign | Electrical | $5,000 | — | Finaled Mar 27, 2018 | 201709117463 |
| Sep 6, 2017 | otc alterations permit: berry st bldg: restroom upgrades for finishes and fixtures per 2016 cbc. 7 pairs of restrooms total, lobby 5,6,7 . no mechanical or sprinkler upgrades. electrical and life safety upgrades will be submitted under seperate permit | Electrical | $325,000 | — | Finaled May 5, 2020 | 201705176865 |
| Sep 6, 2017 | otc alterations permit: wharfside bldg: restroom upgrades for finishes & fixtures per 2016 cbc. 2 pairs of restrooms total, lobby 1 and lobby 3 no mechanical or sprinkler upgrades. electrical and life safety upgrades will be submitted under seperate permit | Electrical | $325,000 | — | Finaled May 5, 2020 | 201705176861 |
| Aug 23, 2017 | otc alterations permit: 1st floor: add 1 return air grille. add 2 supply air grilles to extg water source heat pump. add one return air grille to extg water source heat pump | Heating and cooling | $2,000 | — | issued | 201708235687 |
| May 9, 2017 | otc alterations permit: ste. #4805: demo of partitions, lights, doors/frames. construction of partitions doors/frames, power data, lighting, ceiling, finishes. plumbing, ls, and fire protection deferred. maher not req | Plumbing | $203,190 | — | Finaled Aug 10, 2017 | 201703242326 |
| Apr 6, 2017 | otc alterations permit: 4th floor suite 4801 - project consists of demo of partitions, lights, doors/frames. construction of interior tenant partitions, doors/frames, power/data, lighting, ceiling + finishes. plumbing, life safety + fire protection modification will be under separate deferred permit. n/a maher ordinance | Plumbing | $203,190 | — | Finaled Aug 10, 2017 | 201703282565 |
| Apr 6, 2017 | otc alterations permit: 6th floor suite 6700 - project consists of demo of partitions, lights, doors/frames. construction of partitions, doors/frames, power/data, lighting, ceiling + finishes. plumbing, life safety + fire protection modification will be under separate deferred permit | Plumbing | $203,190 | — | Finaled Aug 10, 2017 | 201703282561 |
| Apr 6, 2017 | otc alterations permit: demo of partitions, lights, door frames. new partitions, doors/frames, power data, lighting, ceiling, finishes, plumbing, l/s fire protection modifications under sep permit | Plumbing | $203,191 | — | Finaled Aug 10, 2017 | 201703242328 |
| Mar 28, 2017 | otc alterations permit: mechanical and electrical for tenant improvement on the 5th floor. ref pa 2016-1207-4365 | Electrical | $120,000 | — | Finaled Oct 17, 2017 | 201702159473 |
| Jan 4, 2017 | otc alterations permit: 3rd floor: mechanical, electrical and plumbing for ti ref 201609087051 maher na | Plumbing | $325,000 | — | Finaled Jan 5, 2018 | 201612296177 |
| Dec 7, 2016 | otc alterations permit: 6th fl: mechanical and electrical for project 201611021673. maher not req | Electrical | $27,000 | — | issued | 201611152677 |
| Aug 24, 2016 | otc alterations permit: 6th floor - ti for single; addition of demising wall and relocation of door. ceiling and light fixtures to remain. no new mech. electrical under separate permit if needed. no change in life safety. n/a maher | Electrical | $14,000 | — | Finaled Sep 21, 2016 | 201607192662 |
| Jun 7, 2016 | otc alterations permit: mechanical t 24 for existing space to demo ductwork, install new vav and ducts on 5th fl, new ac unit on roof | Heating and cooling | $135,000 | — | Finaled Oct 12, 2016 | 201605268510 |
| Jun 1, 2016 | otc alterations permit: t-24 electrical to install new lighting and power in existing tenant space. maher na | Electrical | $38,000 | — | Finaled Oct 12, 2016 | 201606018833 |
| Jun 1, 2016 | otc alterations permit: t-24 electrical to install new equipment and relocate existing equipment on 4th floor. ref pa 2016-0516-7510 mechanical under sep permit | Electrical | $25,000 | — | Finaled Oct 12, 2016 | 201605238092 |
| Feb 9, 2016 | otc alterations permit: mechanical work - install vav's install vac, install duct work, install heating not water. maher na | Heating and cooling | $190,000 | — | Finaled Oct 28, 2016 | 201601147072 |
| Feb 1, 2016 | otc alterations permit: scope of project for electrical work - ti work consists of connecting power to new or relocated light fixtures, power outlets and tenant equipment - all work consists of making connections to base bldg. existing panels. no change have been made to the existing base bldg electrical system. maher na | Electrical | $1 | — | Finaled Jan 11, 2017 | 201602018460 |
| Jan 22, 2016 | otc alterations permit: electrical scope: demo out some extg relocate some extg data outlet. ref bldg permit #201511041707. n/a for maher | Electrical | $150,000 | — | Finaled Jul 7, 2016 | 201601197293 |
| Jan 19, 2016 | otc alterations permit: 2nd & 3rd fl: new fire alarm devices added to ti in existing building to include 1 relay module, 1 pull station, 1 smoke detector, 1 duct detector, 19 horn strobes, 1 strobe. ref ti 2015-1211-4823 | Heating and cooling | $11,500 | — | issued | 201601197348 |
| Jan 19, 2016 | otc alterations permit: revision to permit # 201511041707 sheet # a.2.0, mechanical & electrical under separate permit | Electrical | $1 | — | Finaled Jun 15, 2016 | 201601126842 |
| Jan 19, 2016 | otc alterations permit: unit #2400 hvac only: new duct work vav's. upgrade to title 24. ref app#201511041707. n/a maher | Heating and cooling | $75,000 | — | Finaled Jul 7, 2016 | 201512285937 |
| Dec 9, 2015 | otc alterations permit: #6600- construction of new partitions and minor mechancial, electrical, plumbing, fire sprinkler & fire alarm work. mep & fire alarm under seperate permit. n/a ordinance #155-13 | Plumbing | $430,500 | — | Finaled Jan 11, 2017 | 201510230657 |
| Nov 5, 2015 | otc alterations permit: 1st floor suite 1200 - mech/electrical for pa #201510058799. n/a maher ordinance | Electrical | $300,000 | — | Finaled Feb 10, 2016 | 201510301221 |
| Oct 5, 2015 | otc alterations permit: #6850 - china basin on 6th floor - construct of new partitions and minor mechanical, electrical, plumbing, fire alarm work and fire sprinkler. mep and fire alarm are to be submitted under separate permit. n/a ordinance #155-13 | Plumbing | $775,000 | — | Finaled Jul 22, 2016 | 201509258063 |
| Sep 3, 2015 | otc alterations permit: 2nd flr: (t.i. combine existing office space 200 & 220) ref. 201508275430, demo existing vav, duct & grilles, install new vav, duct & grille; maher n/a | Heating and cooling | $200,000 | — | Finaled May 6, 2016 | 201509036075 |
| Jul 21, 2015 | otc alterations permit: 5th fl: new fire alarm devices for phase 2 of tenant improvement in existing building to include 4 smoke detectors, 5 duct detectors, 3 relay modules, 24 horn/strobes, 8 strobes 5th fl. ref 2015-0318-1235, 2015-0501-5154. compliance with maher ordinance no 155-13 not required | Heating and cooling | $16,000 | — | Finaled Sep 11, 2015 | 201507212024 |
| Jul 1, 2015 | otc alterations permit: suite #1050 ground floor - consist of partial demo work & construction of new walls & doors of wharfside building in china basin. demo consists of door & partial ceiling removal. new construction consists of new doors & partitions & lighting & electrical. n/a maher ord. life safety deferred | Electrical | $135,000 | — | Finaled Jul 8, 2016 | 201506259932 |
| Jun 1, 2015 | otc alterations permit: revision of as builts 201409176522. addition of 3 modules, 9 horns, 2 duct detectors, demo of 4 smoke detectors, 2 horn strobes | Heating and cooling | $350 | — | Finaled Jul 9, 2015 | 201505287358 |
| May 1, 2015 | otc alterations permit: 5th flr: new fire alarm device for a tenant improvement to an bld to include: 1 power supply, 4 smoke det, 13 duct det, 12 relay modules, 1 monitor module, 1 pull station, 44 horn/strobes, 12 strobes, 2 door holders. majher na | Heating and cooling | $14,375 | — | Finaled Aug 25, 2015 | 201505015154 |
| Apr 27, 2015 | otc alterations permit: ste, 5200: mechanical and electrical for ti including mechanical units and lighting fixtures and power outlets. mep only. arch permit under separate 201504153705. n/a maher ord. #155-13 | Electrical | $175,000 | — | Finaled Sep 10, 2015 | 201504274668 |
| Apr 16, 2015 | additions alterations or repairs: 5th fl. installation of mechanical and plumbing and elec systems for in office ti. demo and arch under sep permits maher not req | Plumbing | $2,000,000 | — | Finaled Dec 1, 2015 | 201503302229 |
| Feb 23, 2015 | otc alterations permit: ste 130: minor demo of existing space and construct primary care clinic, upgrade mechanical, plumbing and electrical; maher n/a | Plumbing | $740,000 | — | Finaled Jul 23, 2015 | 201501276741 |
| Feb 19, 2015 | otc alterations permit: fire alarm ti- devices added to ti in existing building to include 1 power supply, 2 smoke detectors, 32 duct detectors, 33 relay modules, 1 control module, 1 control module 1 monitor module, 40 horn strobes, 3 strobes 2 door holder-n/a for maher | Heating and cooling | $38,550 | — | Finaled Mar 20, 2015 | 201502188650 |
| Jan 29, 2015 | otc alterations permit: mechanical, elecrical and plumbinb work for tenant improvement ref 201412314772, 201412194129; demo, architectural and f.s. under separate permit. compliance with maher ordinance no 155-13 not required | Plumbing | $1,100,000 | — | Finaled Sep 10, 2015 | 201501226347 |
| Jan 5, 2015 | additions alterations or repairs: work on ste#6800. t-i within space . suite to be demised into two separate ste. scope of work includes the demolition & construction of partitions doors & finishes. mechnical, electrical of fire protection system work included | Electrical | $1,800,000 | — | Finaled Jul 6, 2015 | 201409085769 |
On Berry St
123 permits on record on Berry St.
| Trade | Permits | Since Oct 3, 2024 | Median declared | Range | Last |
|---|---|---|---|---|---|
| Roofing | 11 | 1 | — | under 5 | Mar 24, 2026 |
| Electrical | 49 | 4 | — | under 5 | Jun 12, 2026 |
| Heating and cooling | 37 | 6 | $21,266 | $15,000–$71,988 | Oct 8, 2025 |
| Plumbing | 25 | 2 | — | under 5 | Sep 14, 2026 |
| Solar | 1 | 0 | — | under 5 | Oct 6, 2017 |
Roof replacement cost in San Francisco
Across 5,896 one- and two-family reroof permits since October 3, 2024, most declared values run from $7,650 to $32,000 (the middle 80%); the median is $15,000 and half fall between $10,788 and $21,763. The lowest on record is $1 and the highest $4,315,170. Every permit behind that range.
Furnace, heat pump or air conditioner replacement cost in San Francisco
Across 291 one- and two-family heating and cooling permits since October 3, 2024, most declared values run from $1 to $224,616 (the middle 80%); the median is $25,196 and half fall between $5,000 and $116,433. The lowest on record is $1 and the highest $1,600,000. Every permit behind that range.