Permits Index

Home-service permits on record at this address

IssuedWorkTradeDeclared valueContractor as filedStatusPermit
Jul 17, 2023otc alterations permit: relocate existing kitchen from 1st flr to 2nd flr, remodel existing kitchen space into guest bathroom and laundry room, remodel existing bathroom to include new shower and vanity, all light fitures, replace interior doors, upgrade electrical panelsElectrical$82,575—Finaled Jul 3, 2025202307061579

On Broadway

308 permits on record on Broadway.

TradePermitsSince Oct 2, 2024Median declaredRangeLast
Roofing14114$72,237$21,170–$485,500Sep 14, 2026
Plumbing6714$60,000$11,900–$513,167Aug 26, 2026
Electrical498$64,156$2,300–$675,000Sep 21, 2026
Heating and cooling346$65,000$5,001–$542,638Jul 16, 2026
Solar112—under 5Jul 30, 2026
Water heater61—under 5Jun 12, 2026

Roof replacement cost in San Francisco

Across 5,921 one- and two-family reroof permits since October 2, 2024, most declared values run from $7,700 to $32,000 (the middle 80%); the median is $15,000 and half fall between $10,800 and $21,770. The lowest on record is $1 and the highest $4,315,170. Every permit behind that range.

Furnace, heat pump or air conditioner replacement cost in San Francisco

Across 292 one- and two-family heating and cooling permits since October 2, 2024, most declared values run from $1 to $224,154 (the middle 80%); the median is $25,098 and half fall between $5,000 and $115,240. The lowest on record is $1 and the highest $1,600,000. Every permit behind that range.

Source

San Francisco Department of Building Inspection, via DataSF, pulled nightly; the assessor roll for the property fields. As of October 2, 2026. Owner names are not shown on any page.