Permits Index

Home-service permits on record at this address

IssuedWorkTradeDeclared valueContractor as filedStatusPermit
Mar 13, 2026otc alterations permit: 40/f - unit 4005: remodel kitchen and master bath in kind, no layout change. adding steam unit, change tub to shower in master bathroom. hallway bathroom remodel in kind, no layout change. replace tiles in balcony. update hvac to current code unit 4005Heating and cooling$140,000—issued202603127422
Oct 24, 2025otc alterations permit: 20th flr/ suite 2020. ref arch#: 202509044546. mech and electrical unit 0Electrical$120,000—Finaled May 14, 2026202510177572
Oct 9, 2025otc alterations permit: 7th floor: fire alarm t.i.- demo 1 ceiling speaker, 1 strobe, 5 fsd's, 4 duct detectors. add 3 speaker/strobes, 6 strobes. remove and replace: 3 strobes, 3 speakers, 7 speaker/strobes. ref pa #202505196809 and 202505015646 unit 0Heating and cooling$17,579—issued202507251595
Aug 13, 2025otc alterations permit: fire alarm tenant improvement 10th fl. demo 27 speakers, 32 strobes, 2 speaker strobes, 3 smokes, add 30 speaker/strobes, 10 strobes, 2 smokes, 2 ducts, 5 relay. remove and replace 1 nac power supply, 2 batteries arch 202503313402Heating and cooling$41,900—issued202508132904
Aug 6, 2025otc alterations permit: 21st fl restroom upgrades. new interior restroom finishes,lighting, fixtures, stall partiions,drinking fountain. electrical and plumbing will be sep permit ref 202308305609Plumbing$110,000—Finaled Mar 3, 2026202412056265
Jul 25, 2025otc alterations permit: 19th floor: mechanical and electrical work for t.i. ref pa#202503252995Electrical$30,000—Finaled Oct 21, 2025202505287352
Jul 18, 2025otc alterations permit: 11/f: rev 202506118423: replace plumbing drawings with the correct set of plumbing drawingsPlumbing$1—Finaled Aug 28, 2025202507181176
Jul 10, 2025otc alterations permit: 11th floor: fire alarm t.i. to demo 31 ceiling speaker, 24 strobe, 5 speaker strobes. install 23 speaker/strobes, 1 strobe, 1 smoke detector, 1 duct detector, 1 dual module, 1 relay module, 3 relays. ref arch #202504114196Heating and cooling$26,118—Finaled Aug 4, 2025202507020032
Jun 6, 2025otc alterations permit: existing fire sprinkler system-tenant improvements. add 33 upright sprinklers, add 6 pendent, 26 relocate upright sprinklers, relocate pendent sprinklers 85. relocate and changeout pendents sprinklers -30. apn #202503313402Heating and cooling$58,086—Finaled Nov 5, 2025202506068166
May 9, 2025otc alterations permit: 7th fl suite 775: revision to pa 2025-0219-0619 install new water source heat pump for idf roomHeating and cooling$10,000—Finaled Aug 7, 2025202504033616
Mar 10, 2025otc alterations permit: 7th/f, suite 775: mech & electrical & plumbing. ref t.i. pa 202409261645Plumbing$193,735—Finaled Aug 1, 2025202502190619
Feb 6, 2025otc alterations permit: unit 3804: remodel primary bathroom in-kind, new plumbing fixtures, new shower pan. living room: install 3 lights, raises 7 light switches. current light switches are too low for the customer unit 3804Plumbing$24,000—Finaled May 13, 2025202502069812
Nov 15, 2024otc alterations permit: 15/fl-install air distribiution and duct work for new layout relocate t-stat and vav boxes new power and signal devices throughout the space new 2022 title 24 compliant lighting and controls. deferred portion of pa# 202409050103Heating and cooling$125,000—Finaled Feb 25, 2025202411054453
Jun 3, 2024otc alterations permit: 4/f: construction of new phone rooms in existing office. mechanical, electrical, life safety, and sprinkler will be separate permit. no change to occupancy or egress. path of travel approved under pa 202308305609. restrooms approved under pa 202002144567Electrical$35,000—issued202404039216
Nov 1, 2022otc alterations permit: 8th fl - project consists of demolition of all interior paritions, glazing, millwork, doors, ceilings and finishes. floor is current unopccupied. existing mechanical, electrical and sprinkler system modificaiton is under separate permit. path of travel/accessibility scope not required per ab-017Electrical$50,000—Finaled Nov 30, 2022202209162581
Nov 1, 2022otc alterations permit: 8th/f restroom upgrades. new restroom finishes, lightings, fixtures, partitions, add drinking fountains=. electric & plumbing will be trade permit only. path of traval ref to 2014 0214 4567Plumbing$85,000—Finaled Jan 30, 2023202209132340
Nov 1, 2022otc alterations permit: restroom upgrades replacin interior restroom finishes, new lighting, new toilet partitions, sink and finishes. new drinking fountain. electrical and plumbing will be trade permit path of travel approved per pa 202002144567Plumbing$80,000—Finaled Jan 30, 2023202205265099
Sep 22, 2021otc alterations permit: 25th fl, ste 2500 - new lighting & t24 controls throughout. additional circuits for new heat pump & appliances. provide & install new heat pump, vav & distribution as needed. ref pa 2021-0812-6332Heating and cooling$150,000—issued202109228944
Dec 17, 2020otc alterations permit: ref p/a 2020-0214-4567. f/a/ modification on 4f: remove smk det. & spkr/strbs; install spkr/strb; strbs; smk det.; contrl relays; aux relays; duct det.; emergency door relays; 2-way call box; strb power supply; replace with new pull stations;Heating and cooling$52,000—Finaled Mar 9, 2021202012080528
Dec 3, 2020otc alterations permit: ref p/a 2020-0806-1209. 31st floor f/a modification: remove spkr/strbs; spkr; strobe. add spkr/strbs; spkrs; smoke detectos; control relays; aux relays; duct detector; 2-way call station; door holders; door release; replace pull stations;Heating and cooling$33,540—Finaled Dec 23, 2020202011199307
Nov 8, 2019otc alterations permit: 24th floor: as built plans for fire alarm pa# 2019-0712-5719: add 2 duct detectors, 2 control relays, 2 rib relays for existing fsp per sffd comments unit 0Heating and cooling$4,880—Finaled Feb 14, 2022201911086830
Jul 12, 2019otc alterations permit: ref 201905019396 f/a modification on 24thflr - add 1 smk det, 14 splr.strobes, 3 strobes, 1 control relay, 1 rib relay, 1 duct det, 2 control modulesHeating and cooling$13,820—Finaled Aug 29, 2019201907125720
Jul 1, 2019otc alterations permit: 18th floor: demo of e partitoins, doors, electrical, plumbing, millwork and finishesPlumbing$140,000—Finaled Sep 26, 2019201906274544
Jul 1, 2019otc alterations permit: 17th floor: demo of e paritions, doors, elec, plumbing, millwork, finishesPlumbing$140,000—Finaled Sep 26, 2019201906274543
Jul 1, 2019otc alterations permit: 16th floor: demo of e partitions, pours, electrical, plumbing, millwork, and finishes unit 0Plumbing$140,000—Finaled Sep 26, 2019201906274542
Jun 26, 2019otc alterations permit: mechanical, elec, plumbing for tenant improvement on the 32nd flPlumbing$175,000—Finaled Jan 8, 2020201906193830
Jun 13, 2019otc alterations permit: 22nd flr fire alarm modification. remove 1 duct smoke detector, 10 strobes, 9 speakers, 6 door holders. install 11 speaker strobes, 8 strobes, 1 2-way call stationHeating and cooling$12,620—Finaled Oct 16, 2019201906133302
Jun 5, 2019otc alterations permit: 23rd:remove:1 smoke detector/30 nal devices/1 mon module. install:32 sprinkler/strobs/16 sprinklers;1 smoke detectros/4 duct detec.1 control relay/17 rib relays;2 emergency door release; 2-2way call stations. replace:4 pull stationry;12 smoke detec;3 control relays;2 mon module;2 control mod; 2stobs unit 0Heating and cooling$36,400—Finaled Feb 9, 2022201906052519
May 15, 2019otc alterations permit: 20th fl: install new duct work and grilles install new vav boxesHeating and cooling$132,000—Finaled Jul 25, 2019201905150658
Apr 16, 2019otc alterations permit: 29th flr. mechanical, electrical and plumbing for tenant improvement; ref pa#201812057507Plumbing$200,000—Finaled Dec 31, 2019201902203312
Mar 15, 2019otc alterations permit: ref t.i. 201812208894; f/a modification on 30th fl; add new smoke detectors, sprkr/strobes, control relays & duct detector, remove & replace f/a addressable devices with new, add call stations & emergency door release from two way comm requirementsHeating and cooling$30,000—issued201903155327
Mar 15, 2019otc alterations permit: ref t.i. 201812057508; f/a modification on 29th fl; add new smoke detectors, sprkr/strobes,control relays & duct detector, remove & replace f/a addressable devices with new, add call stations & emergency door release from two way comm requirements unit 3801Heating and cooling$33,840—Finaled Oct 2, 2019201903155318
Mar 15, 2019otc alterations permit: ref t.i. 201812057508; f/a modification on 28th fl; add new smoke detectors, sprkr/strobes,control relays & duct detector, remove & replace f/a addressable devices with new, add call stations & emergency door release from two way comm requirements unit 3801Heating and cooling$31,960—Finaled Oct 2, 2019201903155317
Mar 15, 2019otc alterations permit: ref t.i. 201811296942; f/a modification on 27th fl; add new smoke detectors, sprkr/strobes, control relays & duct detector, remove & replace f/a addressable devices with new, add call stations & emergency door release from two way comm requirementsHeating and cooling$27,700—Finaled Oct 2, 2019201903155315
Mar 15, 2019otc alterations permit: f/a modification on 26th fl; install new 31 cic cabless for survivability level 3 req; modify f/a software to combine 26th-29th fl due to interconnecting stairs; install speaker/strobes, new smokes & duct det. for tenant space, remove & replace devices w/ new, install call boxes for two way communHeating and cooling$30,400—Finaled Oct 25, 2019201903155313
Mar 11, 2019otc alterations permit: 28th flr. mechanical, electrical and plumbing for tenant improvement. ref 201812057508Plumbing$200,000—Finaled Feb 7, 2020201902203313
Mar 11, 2019otc alterations permit: 30th flr. mechanical, electrical and plumbing for tenant improvement. ref 201812208894Plumbing$200,000—Finaled Dec 31, 2019201902203311
Mar 11, 2019otc alterations permit: 27th flr. tenant improvement incl mechanical, electrical and plumbing. ref pa 201811296942Plumbing$200,000—Finaled Dec 31, 2019201902203307
Mar 11, 2019otc alterations permit: mechanical, electrical & plumbing for ti on the 26th floor. ref 2018-1129-6941Plumbing$150,000—Finaled Dec 31, 2019201902132775
Nov 8, 2018otc alterations permit: 38/f: ref pa# 201810183524; electrical & lighting modifications & t24 upgrades as required for new office configuration, hvac modifications to include new vav & adjustment to duct layout unit 3801Heating and cooling$100,000—issued201811085341
Dec 13, 2017otc alterations permit: 32/f: ste 3225 tenant improvement: non-structural elements including interior partitions & doors. construction consists of interior partitions, doors, finishes, celing lighting, electrical outlets & switches.r/r vav's in the hvac system,add one vav & exhaust fan. maher n/a unit 0Heating and cooling$210,000—Finaled Feb 8, 2018201712045338
Sep 26, 2017otc alterations permit: ref pa 2017-0811-4554 fa modification on 25th floor - 6 duct detectors; 22 speaker/strobes; 1 strobe power supply; 1 smoke detector; 2 monitor modules; 4 control relay; 4 rib relay; 2 speakers; demo 14 strobes and 8 speakers, 1 smoke detectorHeating and cooling$25,200—issued201709269525
Aug 29, 2017otc alterations permit: 25th floor: partial floor t.i. included drywall, ceilings, finishes, mechanical, electrical and lightingElectrical$986,000—Finaled Aug 16, 2018201708114554
Jul 17, 2017otc alterations permit: 14/f #1480- interior demo of non structural elements, partitions, doors, finishes, ceilings, lighting, mechanical, electrical outlets & switches. mep. separate permitElectrical$243,648—Finaled Aug 23, 2017201705045738
Jul 13, 2017otc alterations permit: lobby, f/s ti: relocate & change out fire sprinkler per t.i. ref. #201703232221Heating and cooling$5,175—Finaled Nov 13, 2017201707131784
May 2, 2017otc alterations permit: new freestanding benches to be added to plaza. all paving, stairs, ramp, handrails and planters to remain. all electrical and plumbing work to be done under sep permitPlumbing$113,000—Finaled Mar 7, 2018201702159478
Mar 21, 2017otc alterations permit: 27th floor: title 24 mechanical and electrical to demo ductwork and relocate mech. equipment and add new lighting and power. ref app#201612195369 for t.i. work unit 0Electrical$97,000—Finaled Jun 29, 2017201703141409
Feb 8, 2017otc alterations permit: 1st floor fire alarm modification: install spkrs/strobes; rps; smoke detector; control relays; control module; rib relays; duct detectors; analog loop card; relocate mps; demo mps; demo spkr/strbs; demo smoke detector; demo rrs. ref #201612296224Heating and cooling$20,046—Finaled Apr 14, 2017201702088956
Feb 3, 2017otc alterations permit: 1st & svc level-f/a ti @ 1st fl: install 1 smoke det; 3 duct det; 9 spkr/strobes; 4 strobes; 3 spkrs; 1 rps; 2 control module, 4 rib; demo 1 smoke det; 2 speaker/strobes; 1 speaker & 2 door holders. for svc level: 1 spks/storbe & relocate smoke det & rps. ref #201611213217,201612165134,201701127004Heating and cooling$18,900—Finaled Apr 5, 2017201702038558
Jan 30, 2017otc alterations permit: ste 101: change of use under bpa 201610120045; removal of mezz hvac platform & ceiling framing,relocating hvac unit,relocate water heater,decrease #of showers & sinks in both men's & women changing rms,all interior and no exterior workWater heater$100,000—Finaled May 9, 2017201612296224
Jan 19, 2017otc alterations permit: provide power & lighting ti to fitness center. provide new wshp's & hvac distribution throughout new fitness center. ref pa 2016-1121-3217Heating and cooling$1—Finaled Apr 26, 2017201701127004
Jan 5, 2017otc alterations permit: 29th floor: mechanical and electrical for ref app#201611011636 unit 0Electrical$130,000—Finaled Mar 1, 2017201701046456
Nov 18, 2016otc alterations permit: 1st flr: ti for fitness work space. work to include: partitions, millwork, finishes, electrical & lighting, plumbing & hvac & acoustical ceiling for studio. life safety deferred. change of use, frontage to ensure 60% of transparencyHeating and cooling$750,000—Finaled May 9, 2017201610120045
Oct 19, 2016otc alterations permit: 1st floor f/a addition: install expansion facp to existing network. new facp to be used for future expansion. install smoke detector; duct detectors at fsd's control relay for fsd control & rib relay ti 2016-0908-7040Heating and cooling$7,500—Finaled Oct 24, 2016201610180532
Oct 18, 2016otc alterations permit: mechanical & electrical work for new fire rated wall partition and door ref 201609087040Electrical$5,000—issued201610120008
Oct 18, 2016sign - erect: erect electric, ground, double faced, signElectrical$2,200—issued201608306311
Sep 16, 2016otc alterations permit: modification in the basement, 5th and 6th fl. install 2 monitor modules, 2 duct detectors, 2 control relays, 2 rib relays per high rise inspector unit 1Heating and cooling$4,112—issued201609167937
Jun 14, 2016otc alterations permit: unit #3803 - re-route existing plumbing vent supporting the kitchen sink & remove & repalce five incandiscent recessed can s with led recessed cansPlumbing$2,450—issued201606149891
May 6, 2016otc alterations permit: #101 & 102- demolition of all interior partitions, glazing, millwork, plumbing, column furring and doors. demo per ab-017Plumbing$25,000—Finaled Jul 5, 2016201604285907
Feb 22, 2016otc alterations permit: mechanical & electrical work for ti on the 32nd floor. ref pa 2015-1124-3441Electrical$20,000—issued201602190039
Feb 17, 2016otc alterations permit: f.a. modification on 33rd & 34th flrs: 201510210355/201510210353 . 33rd: 4 speakers, 31 speaker strobes, 8 smoke det, 8 duct det, 1 strobe pwr supply, 3 control relays, 4 pilot relay, 2 dr holders, 8 replace smoke det. with nw. 34th: 2 speakers, 34 speakers/strobes, 14 smoke det, 10 duct detHeating and cooling$73,088—Finaled Nov 4, 2016201512225733
Dec 23, 2015otc alterations permit: unit #3903: demo minimal interior partition walls. move plumbing in kitchen. move plumbing in bath, new shower. reconfigure space at bath/kitchen/closet as shown on plans. finish as needed unit 3903Plumbing$100,000—Finaled May 24, 2017201512225747
Dec 21, 2015otc alterations permit: 32nd floor, alarm modification: install speaker/strobes; smoke detectors; duct detectors; strobe power supply; control relay pilot relays. ref pa 2015-1110-2225Heating and cooling$12,400—issued201512215591
Nov 19, 2015otc alterations permit: 32/f: partial ti on 32nd floor to include new drywall, door, ceiling work, millwork, finishes electrical and mechanical workElectrical$789,360—issued201511102225
Oct 27, 2015otc alterations permit: 33rd floor: mechanical and electrical work associated with 201510079067. fire sprinklers and life safety under seperate permitElectrical$600,000—issued201510210355
Aug 10, 2015otc alterations permit: 23rd floor: ti includes the building new non-structural partitions. all or revised hvac, elect & life safety work under sep permitHeating and cooling$4,500—Finaled Oct 21, 2015201508073710
Jul 29, 2015sign - erect: erect non-electrical one wall signElectrical$11,580—Finaled Oct 7, 2015201507292839
Jul 29, 2015sign - erect: erect non-electrical 2 blade signElectrical$9,600—Finaled Oct 7, 2015201507292836
Jul 24, 2015otc alterations permit: 15th floor: mechanical and electrical only for app#2015-0604-8072 unit 0Electrical$38,215—Finaled Sep 23, 2015201506290132
Jun 8, 2015otc alterations permit: 15th floor: interior office tenant improvements at 15th floor space to include new partitions, doors, windows, millwork, lighting, electrical and finishes. mep, fire sprinklers and life safety under separate permitsElectrical$430,000—Finaled Sep 11, 2015201506048072
Apr 2, 2015otc alterations permit: demolition of e non structural partitions, doors/frames, millwork, plumbing, ceiling and floor finishes on 32nd fl. demo of e interconnecting stairs btw 32nd and 33rd fl and refill slabs as req to separate floors. flr 32 to 34 are currently unoccupied. ab-017. life safety deferredPlumbing$150,000—Finaled Oct 27, 2015201503171125

On Bush St

451 permits on record on Bush St.

TradePermitsSince Oct 3, 2024Median declaredRangeLast
Roofing12929$25,000$9,780–$200,000Aug 7, 2026
Heating and cooling11012$38,350$14,916–$138,500Mar 13, 2026
Electrical10916$25,000$5,870–$150,000Aug 20, 2026
Plumbing9510$57,150$1–$181,374May 15, 2026
Solar41—under 5May 15, 2026
Water heater40—under 5May 24, 2024

Roof replacement cost in San Francisco

Across 5,896 one- and two-family reroof permits since October 3, 2024, most declared values run from $7,650 to $32,000 (the middle 80%); the median is $15,000 and half fall between $10,788 and $21,763. The lowest on record is $1 and the highest $4,315,170. Every permit behind that range.

Furnace, heat pump or air conditioner replacement cost in San Francisco

Across 291 one- and two-family heating and cooling permits since October 3, 2024, most declared values run from $1 to $224,616 (the middle 80%); the median is $25,196 and half fall between $5,000 and $116,433. The lowest on record is $1 and the highest $1,600,000. Every permit behind that range.

Source

San Francisco Department of Building Inspection, via DataSF, pulled nightly; the assessor roll for the property fields. As of October 3, 2026. Owner names are not shown on any page.