333 Bush St, San Francisco
71 home-service permits on record at 333 Bush St, San Francisco; no roofing permit on record.
Home-service permits on record at this address
| Issued | Work | Trade | Declared value | Contractor as filed | Status | Permit |
|---|---|---|---|---|---|---|
| Mar 13, 2026 | otc alterations permit: 40/f - unit 4005: remodel kitchen and master bath in kind, no layout change. adding steam unit, change tub to shower in master bathroom. hallway bathroom remodel in kind, no layout change. replace tiles in balcony. update hvac to current code unit 4005 | Heating and cooling | $140,000 | — | issued | 202603127422 |
| Oct 24, 2025 | otc alterations permit: 20th flr/ suite 2020. ref arch#: 202509044546. mech and electrical unit 0 | Electrical | $120,000 | — | Finaled May 14, 2026 | 202510177572 |
| Oct 9, 2025 | otc alterations permit: 7th floor: fire alarm t.i.- demo 1 ceiling speaker, 1 strobe, 5 fsd's, 4 duct detectors. add 3 speaker/strobes, 6 strobes. remove and replace: 3 strobes, 3 speakers, 7 speaker/strobes. ref pa #202505196809 and 202505015646 unit 0 | Heating and cooling | $17,579 | — | issued | 202507251595 |
| Aug 13, 2025 | otc alterations permit: fire alarm tenant improvement 10th fl. demo 27 speakers, 32 strobes, 2 speaker strobes, 3 smokes, add 30 speaker/strobes, 10 strobes, 2 smokes, 2 ducts, 5 relay. remove and replace 1 nac power supply, 2 batteries arch 202503313402 | Heating and cooling | $41,900 | — | issued | 202508132904 |
| Aug 6, 2025 | otc alterations permit: 21st fl restroom upgrades. new interior restroom finishes,lighting, fixtures, stall partiions,drinking fountain. electrical and plumbing will be sep permit ref 202308305609 | Plumbing | $110,000 | — | Finaled Mar 3, 2026 | 202412056265 |
| Jul 25, 2025 | otc alterations permit: 19th floor: mechanical and electrical work for t.i. ref pa#202503252995 | Electrical | $30,000 | — | Finaled Oct 21, 2025 | 202505287352 |
| Jul 18, 2025 | otc alterations permit: 11/f: rev 202506118423: replace plumbing drawings with the correct set of plumbing drawings | Plumbing | $1 | — | Finaled Aug 28, 2025 | 202507181176 |
| Jul 10, 2025 | otc alterations permit: 11th floor: fire alarm t.i. to demo 31 ceiling speaker, 24 strobe, 5 speaker strobes. install 23 speaker/strobes, 1 strobe, 1 smoke detector, 1 duct detector, 1 dual module, 1 relay module, 3 relays. ref arch #202504114196 | Heating and cooling | $26,118 | — | Finaled Aug 4, 2025 | 202507020032 |
| Jun 6, 2025 | otc alterations permit: existing fire sprinkler system-tenant improvements. add 33 upright sprinklers, add 6 pendent, 26 relocate upright sprinklers, relocate pendent sprinklers 85. relocate and changeout pendents sprinklers -30. apn #202503313402 | Heating and cooling | $58,086 | — | Finaled Nov 5, 2025 | 202506068166 |
| May 9, 2025 | otc alterations permit: 7th fl suite 775: revision to pa 2025-0219-0619 install new water source heat pump for idf room | Heating and cooling | $10,000 | — | Finaled Aug 7, 2025 | 202504033616 |
| Mar 10, 2025 | otc alterations permit: 7th/f, suite 775: mech & electrical & plumbing. ref t.i. pa 202409261645 | Plumbing | $193,735 | — | Finaled Aug 1, 2025 | 202502190619 |
| Feb 6, 2025 | otc alterations permit: unit 3804: remodel primary bathroom in-kind, new plumbing fixtures, new shower pan. living room: install 3 lights, raises 7 light switches. current light switches are too low for the customer unit 3804 | Plumbing | $24,000 | — | Finaled May 13, 2025 | 202502069812 |
| Nov 15, 2024 | otc alterations permit: 15/fl-install air distribiution and duct work for new layout relocate t-stat and vav boxes new power and signal devices throughout the space new 2022 title 24 compliant lighting and controls. deferred portion of pa# 202409050103 | Heating and cooling | $125,000 | — | Finaled Feb 25, 2025 | 202411054453 |
| Jun 3, 2024 | otc alterations permit: 4/f: construction of new phone rooms in existing office. mechanical, electrical, life safety, and sprinkler will be separate permit. no change to occupancy or egress. path of travel approved under pa 202308305609. restrooms approved under pa 202002144567 | Electrical | $35,000 | — | issued | 202404039216 |
| Nov 1, 2022 | otc alterations permit: 8th fl - project consists of demolition of all interior paritions, glazing, millwork, doors, ceilings and finishes. floor is current unopccupied. existing mechanical, electrical and sprinkler system modificaiton is under separate permit. path of travel/accessibility scope not required per ab-017 | Electrical | $50,000 | — | Finaled Nov 30, 2022 | 202209162581 |
| Nov 1, 2022 | otc alterations permit: 8th/f restroom upgrades. new restroom finishes, lightings, fixtures, partitions, add drinking fountains=. electric & plumbing will be trade permit only. path of traval ref to 2014 0214 4567 | Plumbing | $85,000 | — | Finaled Jan 30, 2023 | 202209132340 |
| Nov 1, 2022 | otc alterations permit: restroom upgrades replacin interior restroom finishes, new lighting, new toilet partitions, sink and finishes. new drinking fountain. electrical and plumbing will be trade permit path of travel approved per pa 202002144567 | Plumbing | $80,000 | — | Finaled Jan 30, 2023 | 202205265099 |
| Sep 22, 2021 | otc alterations permit: 25th fl, ste 2500 - new lighting & t24 controls throughout. additional circuits for new heat pump & appliances. provide & install new heat pump, vav & distribution as needed. ref pa 2021-0812-6332 | Heating and cooling | $150,000 | — | issued | 202109228944 |
| Dec 17, 2020 | otc alterations permit: ref p/a 2020-0214-4567. f/a/ modification on 4f: remove smk det. & spkr/strbs; install spkr/strb; strbs; smk det.; contrl relays; aux relays; duct det.; emergency door relays; 2-way call box; strb power supply; replace with new pull stations; | Heating and cooling | $52,000 | — | Finaled Mar 9, 2021 | 202012080528 |
| Dec 3, 2020 | otc alterations permit: ref p/a 2020-0806-1209. 31st floor f/a modification: remove spkr/strbs; spkr; strobe. add spkr/strbs; spkrs; smoke detectos; control relays; aux relays; duct detector; 2-way call station; door holders; door release; replace pull stations; | Heating and cooling | $33,540 | — | Finaled Dec 23, 2020 | 202011199307 |
| Nov 8, 2019 | otc alterations permit: 24th floor: as built plans for fire alarm pa# 2019-0712-5719: add 2 duct detectors, 2 control relays, 2 rib relays for existing fsp per sffd comments unit 0 | Heating and cooling | $4,880 | — | Finaled Feb 14, 2022 | 201911086830 |
| Jul 12, 2019 | otc alterations permit: ref 201905019396 f/a modification on 24thflr - add 1 smk det, 14 splr.strobes, 3 strobes, 1 control relay, 1 rib relay, 1 duct det, 2 control modules | Heating and cooling | $13,820 | — | Finaled Aug 29, 2019 | 201907125720 |
| Jul 1, 2019 | otc alterations permit: 18th floor: demo of e partitoins, doors, electrical, plumbing, millwork and finishes | Plumbing | $140,000 | — | Finaled Sep 26, 2019 | 201906274544 |
| Jul 1, 2019 | otc alterations permit: 17th floor: demo of e paritions, doors, elec, plumbing, millwork, finishes | Plumbing | $140,000 | — | Finaled Sep 26, 2019 | 201906274543 |
| Jul 1, 2019 | otc alterations permit: 16th floor: demo of e partitions, pours, electrical, plumbing, millwork, and finishes unit 0 | Plumbing | $140,000 | — | Finaled Sep 26, 2019 | 201906274542 |
| Jun 26, 2019 | otc alterations permit: mechanical, elec, plumbing for tenant improvement on the 32nd fl | Plumbing | $175,000 | — | Finaled Jan 8, 2020 | 201906193830 |
| Jun 13, 2019 | otc alterations permit: 22nd flr fire alarm modification. remove 1 duct smoke detector, 10 strobes, 9 speakers, 6 door holders. install 11 speaker strobes, 8 strobes, 1 2-way call station | Heating and cooling | $12,620 | — | Finaled Oct 16, 2019 | 201906133302 |
| Jun 5, 2019 | otc alterations permit: 23rd:remove:1 smoke detector/30 nal devices/1 mon module. install:32 sprinkler/strobs/16 sprinklers;1 smoke detectros/4 duct detec.1 control relay/17 rib relays;2 emergency door release; 2-2way call stations. replace:4 pull stationry;12 smoke detec;3 control relays;2 mon module;2 control mod; 2stobs unit 0 | Heating and cooling | $36,400 | — | Finaled Feb 9, 2022 | 201906052519 |
| May 15, 2019 | otc alterations permit: 20th fl: install new duct work and grilles install new vav boxes | Heating and cooling | $132,000 | — | Finaled Jul 25, 2019 | 201905150658 |
| Apr 16, 2019 | otc alterations permit: 29th flr. mechanical, electrical and plumbing for tenant improvement; ref pa#201812057507 | Plumbing | $200,000 | — | Finaled Dec 31, 2019 | 201902203312 |
| Mar 15, 2019 | otc alterations permit: ref t.i. 201812208894; f/a modification on 30th fl; add new smoke detectors, sprkr/strobes, control relays & duct detector, remove & replace f/a addressable devices with new, add call stations & emergency door release from two way comm requirements | Heating and cooling | $30,000 | — | issued | 201903155327 |
| Mar 15, 2019 | otc alterations permit: ref t.i. 201812057508; f/a modification on 29th fl; add new smoke detectors, sprkr/strobes,control relays & duct detector, remove & replace f/a addressable devices with new, add call stations & emergency door release from two way comm requirements unit 3801 | Heating and cooling | $33,840 | — | Finaled Oct 2, 2019 | 201903155318 |
| Mar 15, 2019 | otc alterations permit: ref t.i. 201812057508; f/a modification on 28th fl; add new smoke detectors, sprkr/strobes,control relays & duct detector, remove & replace f/a addressable devices with new, add call stations & emergency door release from two way comm requirements unit 3801 | Heating and cooling | $31,960 | — | Finaled Oct 2, 2019 | 201903155317 |
| Mar 15, 2019 | otc alterations permit: ref t.i. 201811296942; f/a modification on 27th fl; add new smoke detectors, sprkr/strobes, control relays & duct detector, remove & replace f/a addressable devices with new, add call stations & emergency door release from two way comm requirements | Heating and cooling | $27,700 | — | Finaled Oct 2, 2019 | 201903155315 |
| Mar 15, 2019 | otc alterations permit: f/a modification on 26th fl; install new 31 cic cabless for survivability level 3 req; modify f/a software to combine 26th-29th fl due to interconnecting stairs; install speaker/strobes, new smokes & duct det. for tenant space, remove & replace devices w/ new, install call boxes for two way commun | Heating and cooling | $30,400 | — | Finaled Oct 25, 2019 | 201903155313 |
| Mar 11, 2019 | otc alterations permit: 28th flr. mechanical, electrical and plumbing for tenant improvement. ref 201812057508 | Plumbing | $200,000 | — | Finaled Feb 7, 2020 | 201902203313 |
| Mar 11, 2019 | otc alterations permit: 30th flr. mechanical, electrical and plumbing for tenant improvement. ref 201812208894 | Plumbing | $200,000 | — | Finaled Dec 31, 2019 | 201902203311 |
| Mar 11, 2019 | otc alterations permit: 27th flr. tenant improvement incl mechanical, electrical and plumbing. ref pa 201811296942 | Plumbing | $200,000 | — | Finaled Dec 31, 2019 | 201902203307 |
| Mar 11, 2019 | otc alterations permit: mechanical, electrical & plumbing for ti on the 26th floor. ref 2018-1129-6941 | Plumbing | $150,000 | — | Finaled Dec 31, 2019 | 201902132775 |
| Nov 8, 2018 | otc alterations permit: 38/f: ref pa# 201810183524; electrical & lighting modifications & t24 upgrades as required for new office configuration, hvac modifications to include new vav & adjustment to duct layout unit 3801 | Heating and cooling | $100,000 | — | issued | 201811085341 |
| Dec 13, 2017 | otc alterations permit: 32/f: ste 3225 tenant improvement: non-structural elements including interior partitions & doors. construction consists of interior partitions, doors, finishes, celing lighting, electrical outlets & switches.r/r vav's in the hvac system,add one vav & exhaust fan. maher n/a unit 0 | Heating and cooling | $210,000 | — | Finaled Feb 8, 2018 | 201712045338 |
| Sep 26, 2017 | otc alterations permit: ref pa 2017-0811-4554 fa modification on 25th floor - 6 duct detectors; 22 speaker/strobes; 1 strobe power supply; 1 smoke detector; 2 monitor modules; 4 control relay; 4 rib relay; 2 speakers; demo 14 strobes and 8 speakers, 1 smoke detector | Heating and cooling | $25,200 | — | issued | 201709269525 |
| Aug 29, 2017 | otc alterations permit: 25th floor: partial floor t.i. included drywall, ceilings, finishes, mechanical, electrical and lighting | Electrical | $986,000 | — | Finaled Aug 16, 2018 | 201708114554 |
| Jul 17, 2017 | otc alterations permit: 14/f #1480- interior demo of non structural elements, partitions, doors, finishes, ceilings, lighting, mechanical, electrical outlets & switches. mep. separate permit | Electrical | $243,648 | — | Finaled Aug 23, 2017 | 201705045738 |
| Jul 13, 2017 | otc alterations permit: lobby, f/s ti: relocate & change out fire sprinkler per t.i. ref. #201703232221 | Heating and cooling | $5,175 | — | Finaled Nov 13, 2017 | 201707131784 |
| May 2, 2017 | otc alterations permit: new freestanding benches to be added to plaza. all paving, stairs, ramp, handrails and planters to remain. all electrical and plumbing work to be done under sep permit | Plumbing | $113,000 | — | Finaled Mar 7, 2018 | 201702159478 |
| Mar 21, 2017 | otc alterations permit: 27th floor: title 24 mechanical and electrical to demo ductwork and relocate mech. equipment and add new lighting and power. ref app#201612195369 for t.i. work unit 0 | Electrical | $97,000 | — | Finaled Jun 29, 2017 | 201703141409 |
| Feb 8, 2017 | otc alterations permit: 1st floor fire alarm modification: install spkrs/strobes; rps; smoke detector; control relays; control module; rib relays; duct detectors; analog loop card; relocate mps; demo mps; demo spkr/strbs; demo smoke detector; demo rrs. ref #201612296224 | Heating and cooling | $20,046 | — | Finaled Apr 14, 2017 | 201702088956 |
| Feb 3, 2017 | otc alterations permit: 1st & svc level-f/a ti @ 1st fl: install 1 smoke det; 3 duct det; 9 spkr/strobes; 4 strobes; 3 spkrs; 1 rps; 2 control module, 4 rib; demo 1 smoke det; 2 speaker/strobes; 1 speaker & 2 door holders. for svc level: 1 spks/storbe & relocate smoke det & rps. ref #201611213217,201612165134,201701127004 | Heating and cooling | $18,900 | — | Finaled Apr 5, 2017 | 201702038558 |
| Jan 30, 2017 | otc alterations permit: ste 101: change of use under bpa 201610120045; removal of mezz hvac platform & ceiling framing,relocating hvac unit,relocate water heater,decrease #of showers & sinks in both men's & women changing rms,all interior and no exterior work | Water heater | $100,000 | — | Finaled May 9, 2017 | 201612296224 |
| Jan 19, 2017 | otc alterations permit: provide power & lighting ti to fitness center. provide new wshp's & hvac distribution throughout new fitness center. ref pa 2016-1121-3217 | Heating and cooling | $1 | — | Finaled Apr 26, 2017 | 201701127004 |
| Jan 5, 2017 | otc alterations permit: 29th floor: mechanical and electrical for ref app#201611011636 unit 0 | Electrical | $130,000 | — | Finaled Mar 1, 2017 | 201701046456 |
| Nov 18, 2016 | otc alterations permit: 1st flr: ti for fitness work space. work to include: partitions, millwork, finishes, electrical & lighting, plumbing & hvac & acoustical ceiling for studio. life safety deferred. change of use, frontage to ensure 60% of transparency | Heating and cooling | $750,000 | — | Finaled May 9, 2017 | 201610120045 |
| Oct 19, 2016 | otc alterations permit: 1st floor f/a addition: install expansion facp to existing network. new facp to be used for future expansion. install smoke detector; duct detectors at fsd's control relay for fsd control & rib relay ti 2016-0908-7040 | Heating and cooling | $7,500 | — | Finaled Oct 24, 2016 | 201610180532 |
| Oct 18, 2016 | otc alterations permit: mechanical & electrical work for new fire rated wall partition and door ref 201609087040 | Electrical | $5,000 | — | issued | 201610120008 |
| Oct 18, 2016 | sign - erect: erect electric, ground, double faced, sign | Electrical | $2,200 | — | issued | 201608306311 |
| Sep 16, 2016 | otc alterations permit: modification in the basement, 5th and 6th fl. install 2 monitor modules, 2 duct detectors, 2 control relays, 2 rib relays per high rise inspector unit 1 | Heating and cooling | $4,112 | — | issued | 201609167937 |
| Jun 14, 2016 | otc alterations permit: unit #3803 - re-route existing plumbing vent supporting the kitchen sink & remove & repalce five incandiscent recessed can s with led recessed cans | Plumbing | $2,450 | — | issued | 201606149891 |
| May 6, 2016 | otc alterations permit: #101 & 102- demolition of all interior partitions, glazing, millwork, plumbing, column furring and doors. demo per ab-017 | Plumbing | $25,000 | — | Finaled Jul 5, 2016 | 201604285907 |
| Feb 22, 2016 | otc alterations permit: mechanical & electrical work for ti on the 32nd floor. ref pa 2015-1124-3441 | Electrical | $20,000 | — | issued | 201602190039 |
| Feb 17, 2016 | otc alterations permit: f.a. modification on 33rd & 34th flrs: 201510210355/201510210353 . 33rd: 4 speakers, 31 speaker strobes, 8 smoke det, 8 duct det, 1 strobe pwr supply, 3 control relays, 4 pilot relay, 2 dr holders, 8 replace smoke det. with nw. 34th: 2 speakers, 34 speakers/strobes, 14 smoke det, 10 duct det | Heating and cooling | $73,088 | — | Finaled Nov 4, 2016 | 201512225733 |
| Dec 23, 2015 | otc alterations permit: unit #3903: demo minimal interior partition walls. move plumbing in kitchen. move plumbing in bath, new shower. reconfigure space at bath/kitchen/closet as shown on plans. finish as needed unit 3903 | Plumbing | $100,000 | — | Finaled May 24, 2017 | 201512225747 |
| Dec 21, 2015 | otc alterations permit: 32nd floor, alarm modification: install speaker/strobes; smoke detectors; duct detectors; strobe power supply; control relay pilot relays. ref pa 2015-1110-2225 | Heating and cooling | $12,400 | — | issued | 201512215591 |
| Nov 19, 2015 | otc alterations permit: 32/f: partial ti on 32nd floor to include new drywall, door, ceiling work, millwork, finishes electrical and mechanical work | Electrical | $789,360 | — | issued | 201511102225 |
| Oct 27, 2015 | otc alterations permit: 33rd floor: mechanical and electrical work associated with 201510079067. fire sprinklers and life safety under seperate permit | Electrical | $600,000 | — | issued | 201510210355 |
| Aug 10, 2015 | otc alterations permit: 23rd floor: ti includes the building new non-structural partitions. all or revised hvac, elect & life safety work under sep permit | Heating and cooling | $4,500 | — | Finaled Oct 21, 2015 | 201508073710 |
| Jul 29, 2015 | sign - erect: erect non-electrical one wall sign | Electrical | $11,580 | — | Finaled Oct 7, 2015 | 201507292839 |
| Jul 29, 2015 | sign - erect: erect non-electrical 2 blade sign | Electrical | $9,600 | — | Finaled Oct 7, 2015 | 201507292836 |
| Jul 24, 2015 | otc alterations permit: 15th floor: mechanical and electrical only for app#2015-0604-8072 unit 0 | Electrical | $38,215 | — | Finaled Sep 23, 2015 | 201506290132 |
| Jun 8, 2015 | otc alterations permit: 15th floor: interior office tenant improvements at 15th floor space to include new partitions, doors, windows, millwork, lighting, electrical and finishes. mep, fire sprinklers and life safety under separate permits | Electrical | $430,000 | — | Finaled Sep 11, 2015 | 201506048072 |
| Apr 2, 2015 | otc alterations permit: demolition of e non structural partitions, doors/frames, millwork, plumbing, ceiling and floor finishes on 32nd fl. demo of e interconnecting stairs btw 32nd and 33rd fl and refill slabs as req to separate floors. flr 32 to 34 are currently unoccupied. ab-017. life safety deferred | Plumbing | $150,000 | — | Finaled Oct 27, 2015 | 201503171125 |
On Bush St
451 permits on record on Bush St.
| Trade | Permits | Since Oct 3, 2024 | Median declared | Range | Last |
|---|---|---|---|---|---|
| Roofing | 129 | 29 | $25,000 | $9,780–$200,000 | Aug 7, 2026 |
| Heating and cooling | 110 | 12 | $38,350 | $14,916–$138,500 | Mar 13, 2026 |
| Electrical | 109 | 16 | $25,000 | $5,870–$150,000 | Aug 20, 2026 |
| Plumbing | 95 | 10 | $57,150 | $1–$181,374 | May 15, 2026 |
| Solar | 4 | 1 | — | under 5 | May 15, 2026 |
| Water heater | 4 | 0 | — | under 5 | May 24, 2024 |
Roof replacement cost in San Francisco
Across 5,896 one- and two-family reroof permits since October 3, 2024, most declared values run from $7,650 to $32,000 (the middle 80%); the median is $15,000 and half fall between $10,788 and $21,763. The lowest on record is $1 and the highest $4,315,170. Every permit behind that range.
Furnace, heat pump or air conditioner replacement cost in San Francisco
Across 291 one- and two-family heating and cooling permits since October 3, 2024, most declared values run from $1 to $224,616 (the middle 80%); the median is $25,196 and half fall between $5,000 and $116,433. The lowest on record is $1 and the highest $1,600,000. Every permit behind that range.
Source
San Francisco Department of Building Inspection, via DataSF, pulled nightly; the assessor roll for the property fields. As of October 3, 2026. Owner names are not shown on any page.